City of Sedalia, Sedalia Regional Airport, Construct Hangar, Reconstruct Runway 18-36 South Parallel Taxiway, Replace Runway PAPIs, etc.

Agency: Missouri Department of Transportation(MDOT)
State: Missouri
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238210 - Electrical Contractors and Other Wiring Installation Contractors
Posted Date: Oct 7, 2026
Due Date: Oct 20, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
NEW 10/7/26 City of Sedalia, Sedalia Regional Airport, Construct Hangar, Reconstruct Runway 18-36 South Parallel Taxiway, Replace Runway PAPIs, etc. Mitchell Mullen, Airport Director

200 South Osage Ave

Sedalia, MO 65301

mmullen@sedalia.com

10/20/26

Attachment Preview

NOTICE TO AIRPORT ENGINEERING CONSULTANTS
The City of Sedalia, Missouri (Sponsor) is hereby soliciting Statements of Qualifications and Experience from
qualified consultants for airfield development projects at the Sedalia Regional Airport (KDMO) located in
Sedalia, Missouri. Projects may be subject to future receipt of Federal funding under the Federal Aviation
Administration (FAA) Airport Improvement Program, as administered by the Missouri Department of
Transportation (MoDOT) through the State Block Grant Program (SBGP). These projects may include the
following:
1. Construct Hangar ($600,000)
2. Reconstruct Runway 18-36 South Parallel Taxiway (Design, Documented CATEX, & Construction
($2,900,000)
3. Replace Runway PAPIs ($400,000)
4. Rehabilitate concrete apron, taxiway, and runway 18-36 ($600,000)
5. Rehabilitate asphalt runway 5-23 ($500,000)
The required services include, but are not limited to, engineering services for preliminary, design, bidding,
and construction phases and incidental special services including survey, architectural, and geotechnical.
Additionally, preparing categorical exclusion documentation, as-built ALP updates, and other miscellaneous
tasks may be required. The consultant should provide the name(s) of preferred firm(s) for any work which is
likely to be sub-consulted. Subconsultant changes can occur with Sponsor approval. At the Sponsor's
discretion, this selection can be retained for projects initiated within five years or until all projects are
complete. Projects other than those listed above will require a new solicitation except as allowed in FAA
Advisory Circular 150/5100-14 paragraph 2.7.2 (4). Disclosure: Under a previous agreement, Egis assisted
the Sponsor with preparation of their CIP and the above cost estimates.
A qualification-based selection process conforming to FAA Advisory Circular 150/5100-14 and 8.285, RSMo.,
et seq. will be utilized to select the most qualified firm. Selection criteria will include:
* Recent experience in similar airport projects
* Capability to perform all aspects of the project
* Ability to meet schedules within budget
* Knowledge of FAA/MoDOT design and construction standards, regulations, policies, and procedures
* Quality of previous airport projects undertaken
* Personnel experience and qualifications
* Familiarity with, and proximity to, the project
* For projects utilizing FAA grant funds, an implemented Affirmative Action Program
Fees will be negotiated for projects as federal funds become available. Consultants shall not include fee or
cost information when responding to this solicitation. Prospective consultants are advised that applied
overhead rates must be in accordance with the cost principles established within Federal Regulation 48 CFR
Part 31, Contract Cost Principles and Procedures. After selection, the successful firm will be required to
submit a copy of their current overhead rate audit certification or MoDOT pre-qualification.
The agreement(s) between the Sponsor and the selected consultant will be subject to all applicable City,
and State laws, as well as Federal Rules and Regulations as identified in AC 150/5100-14E. The most current
version of the Federal Contract Provisions for A/E agreements will be included in each agreement.

Statements must be concise and contain no more than thirty (30) pages of material single-sided
(or 15 sheets of paper, double sided). This excludes the front and back covers, the two-page cover
letter (or 1 sheet of paper, double sided), table of contents, section dividers, and resumes. The
consultant should also provide an affidavit of compliance with the federal work authorization
program and a copy of the firm's E-Verify Memorandum of Understanding. Consultants must
submit five (5) hard copies of their Statement and a PDF of their Statement (submitted via email)
to the following person:
City of Sedalia
Attention: Mitchell Mullen, Airport Director
200 South Osage Ave
Sedalia, MO 65301
mmullen@sedalia.com
All statements must be received by 5:00 p.m. on October 20, 2026. Statements received after this
deadline will not be considered. The Sponsor reserves the right to reject any and/or all Statements and
waive any irregularities. Submittals will become property of the Sponsor.
Statements are to be provided in a package marked with "Airport Statement of Qualifications". Please
make the email subject line: "Airport Statement of Qualifications" and request delivery/read receipts to
confirm it was received on time.
All questions must be submitted via email to the below contact by 5:00 p.m. on October 13, 2026. Answers
will be sent via reply email.
Mitchell Mullen
Airport Director
mmullen@sedalia.com

This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station

Drexel Technologies

Status Bid Advertisement Post Date Revision Date Letting Date NEW STL District, City

Missouri Department of Transportation(MDOT)

Due by 11/19/2026

Request for Bids: Missouri Greenway: Monarch Chesterfield Levee Trail Signage Replacement Project Submittal

Great Rivers Greenway

Due by 11/06/2026

Status Bid Advertisement Post Date Revision Date Letting Date NEW NW District, City

Missouri Department of Transportation(MDOT)

Due by 11/13/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.