City of Havelock , REQUEST for LETTERS of INTEREST (RFLOI)Sidewalk Engineering Project
| Agency: | State Government of North Carolina |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 18, 2025 |
| Due Date: | Jul 25, 2025 |
| Solicitation No: | 294-29406182025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Solicitation Number: | 294-29406182025 |
| Project Title: | City of Havelock , REQUEST for LETTERS of INTEREST (RFLOI)Sidewalk Engineering Project |
| Description: | SCOPE OF WORK The City of Havelock is soliciting proposals for the services of a firm/team for the following contract scope of work: Project Description: The City of Havelock was awarded, Carbon Reduction Program (CRP) funding for two projects on Webb Boulevard and Church Road. The projects are federally funded and locally administered by the NC Department of Transportation. On Church Road a proposed new sidewalk (Exhibit A) will connect to existing pedestrian routes on the Highway 70 Service Road. There is existing curb and gutter on the west side of Church Road. The proposal would connect with new sidewalk, curb, and gutter. The new sidewalk system would run from the entrance of Slocum Creek Park to the service road (approximately 580 feet). A small portion of the existing ditch system would require piping (approximately 150 feet). On Webb Boulevard a proposed new sidewalk (Exhibit B) is to span from the Boys and Girls Club of Havelock to Havelock High School at a distance of approximately 550 feet. The proposed sidewalk will tie into the existing crosswalk at the intersection of Methodist Drive and Webb Boulevard. Due to limitations within the existing roadway a large portion of the existing ditch system will require piping. Applicable guidelines for the Down East RPO Carbon Reduction Program must be maintained throughout the duration of the project. Phases of the project will include Planning, Engineering & Design, Right-of-Way, and Construction. Specific deliverables from the proposed sidewalk engineering portion of the project will include plans, designs and bid packaging. |
| Opening Date: | 7/25/2025 2:00 PM |
| Posted Date: | 6/18/2025 |
| Status: | Open |
| Department: | CITY OF HAVELOCK |
|
Solicitation Number
*
294-29406182025
|
Department
CITY OF HAVELOCK
|
Status Reason
Open
|
|
|
Opening Date
2025-07-25T14:00:00.0000000
|
Posted Date
*
2025-06-18T13:28:35.0000000Z
|
Commodity Code
Engineering procurement and project management services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
SCOPE OF WORK The City of Havelock is soliciting proposals for the services of a firm/team for the following contract scope of work: Project Description: The City of Havelock was awarded, Carbon Reduction Program (CRP) funding for two projects on Webb Boulevard and Church Road. The projects are federally funded and locally administered by the NC Department of Transportation. On Church Road a proposed new sidewalk (Exhibit A) will connect to existing pedestrian routes on the Highway 70 Service Road. There is existing curb and gutter on the west side of Church Road. The proposal would connect with new sidewalk, curb, and gutter. The new sidewalk system would run from the entrance of Slocum Creek Park to the service road (approximately 580 feet). A small portion of the existing ditch system would require piping (approximately 150 feet). On Webb Boulevard a proposed new sidewalk (Exhibit B) is to span from the Boys and Girls Club of Havelock to Havelock High School at a distance of approximately 550 feet. The proposed sidewalk will tie into the existing crosswalk at the intersection of Methodist Drive and Webb Boulevard. Due to limitations within the existing roadway a large portion of the existing ditch system will require piping. Applicable guidelines for the Down East RPO Carbon Reduction Program must be maintained throughout the duration of the project. Phases of the project will include Planning, Engineering & Design, Right-of-Way, and Construction. Specific deliverables from the proposed sidewalk engineering portion of the project will include plans, designs and bid packaging.
|
|||
|
Attachments
|
|||
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Title Starting Closing Status 2027 RFB NORTHEAST DISTRICT PARK DAM REHABILITATION 09/03/2026 2:00
Chatham County
Due by 10/06/2026
Bid Title: RFP 4006-102126 Parking Garages Painting Project Category: Bid Opportunities Status: Open
City of High Point
Due by 10/21/2026
DN01162 (WBS 50150.3.1) B-5929 POC DN01162 (WBS 50150.3.1) B-5929 Grading, Paving, Drainage, And
Division of Highways
Due by 10/13/2026
Project: WWTP Roofing Multiple Facility - Construction at Mallard & Sugar - Package
City of Charlotte
Due by 10/06/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.