59--CIRCUIT CARD ASSEMB
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Apr 14, 2026 |
| Due Date: | Apr 20, 2026 |
| Solicitation No: | N0010426QSC60 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Apr 14, 2026 08:41 am EDT
- Original Date Offers Due: Apr 20, 2026 06:00 pm EDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: May 05, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: 5998 - ELECTRICAL AND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE
-
NAICS Code:
- 334412 - Bare Printed Circuit Board Manufacturing
-
Place of Performance:
SOLICITATION NOTES:
All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be
issued bilaterally, requiring the contractor's written acceptance prior to
execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 80 days
Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset
Visibility (CAV) Statement of Work.
Your quote should include the following information:
***************QUOTE AMOUNT AND RTAT ***************
Unit Price:__________
Total Price:__________
Repair Turnaround Time (RTAT): _______ days
If your company is not quoting the Government's Required Repair Turnaround
Time (RTAT) or earlier, provide your company's capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement
is measured from asset Return to the date of asset acceptance under the terms
of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in
the Action Date entry in the Commercial Asset Visibility (CAV) system. In
accordance with the CAV Statement of Work, the contractor is required to
accurately report all transactions by the end of the fifth regular business
day after receipt and the Action Date entered in CAV must be dated to reflect
the actual date of physical receipt. The Contractor must obtain final
inspection and acceptance by the Government for all assets within the RTATs
established in this contract.
*Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___
*Return Material Authorization # (RMA), if applicable:__________
*Delivery Vehicle (if Delivery Order requested) (if your company has a current
BOA/IDIQ, for example) :__________________
***************TESTING AND EVALUATION IF BEYOND REPAIR***************
* T&E fee/price (if asset is determined BR/BER): If an item is determined BR,
and the contractor provides documentation that costs were incurred during
evaluation and determination of BR, the contracting officer will negotiate a
reduced contract price, not-to exceed (NTE) $___________associated with the
repair effort to reflect the BR status of the equipment.
* The T&E fee (if asset is determined BR/BER) was determined/computed based
on:______________________________________.
***************AWARDEE INFO & PERFORMANCE LOCATION***************
Awardee CAGE: __________
*Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________
* Facility/Subcontractor CAGE (where the asset should be shipped), if not same
as ""awardee CAGE"":__________
*************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************
*New unit price:__________
*New unit delivery lead-time:__________
The Government intends to add an option quantity to the resultant contract.
In reference to the option quantity, the Government may increase the quantity
of supplies called for in the Schedule at the unit price specified. The
Contracting Officer may exercise the option by written notice to the
Contractor within the number of days in FAR 52.217-6 herein. Delivery of the
added items shall continue at the same rate as the like items called for under
the contract, unless the parties otherwise agree.
IMPORTANT NOTE: Any asset for which the contractor does not meet the required
RTAT will incur a price reduction per unit/per month the contractor is late -
any delay determined to be excusable (e.g. Government Delay) will not result
in a price reduction. If a price reduction is required due to unexcusable
contractor delay, the Contracting Officer will implement the aforementioned
price reduction via a ""reconciliation modification"" at the end of the
contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet
required RTATs, including but not limited to the Government's right to
terminate for default.
In reference to the above important note, the contractor provides the
following price reduction amount per unit per month the contractor does not
meet the RTAT: 1% of unit price, per unit, per month.
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
POC EMAIL: BRETT.A.DEPALMA.CIV@US.NAVY.MIL
- P O BOX 2020 5450 CARLISLE PIKE
- MECHANICSBURG , PA 17050-0788
- USA
- Telephone: 7176054358
- BRETT.A.DEPALMA.CIV@US.NAVY.MIL
- Apr 14, 2026 08:41 am EDTSolicitation (Original)
See Also
Follow CIRCUIT CARD ASSEMB Active Contract Opportunity Notice ID N0010426QQB96 Related Notice Department/Ind.
DEPT OF DEFENSE
Due by 10/09/2026
Follow 59--NRP,CCA,BOARD,ANALO, IN REPAIR/MODIFICATION OF Active Contract Opportunity Notice ID N0038326QNA92 Related Notice
DEPT OF DEFENSE
Due by 10/02/2026
Follow CIRCUIT CARD ASSEMB Active Contract Opportunity Notice ID N0010426QNE66 Related Notice Department/Ind.
DEPT OF DEFENSE
Due by 9/17/2026
Follow 59--ROTOR POSITIONING U, IN REPAIR/MODIFICATION OF Active Contract Opportunity Notice ID N0038326RBA39
DEPT OF DEFENSE
Due by 9/17/2026