CIP Project 9 Sewer Rehabilitations Phase I

Agency: City of Newton
State: Massachusetts
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: Dec 21, 2023
Due Date: Dec 28, 2023
Solicitation No: 24-37
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
CIP Project 9 Sewer Rehabilitations Phase I
  • Department: Purchasing
  • RFP Number: 24-37
  • Start Date: 12/07/2023 10:00 AM
  • Close Date: 12/28/2023 10:00 AM

CIP Project 9 Sewer Rehabilitations Phase I as outlined in the project documents.

24-37-Add-1

24-37 CIP Project 9 Sewer Rehabilitation-BID

General Requirements & Specifications

Drawings

Appendix A

24-37-CIP-Bidders List

Attachment Preview

CITY OF NEWTON, MASSACHUSETTS
PURCHASING DEPARTMENT
purchasing@newtonma.gov
Fax (617) 796-1227
December 18, 2023
ADDENDUM #1
INVITATION FOR BID #24-37
CIP PROJECT 9 SEWER REHABILITATIONS PHASE I
THIS ADDENDUM IS TO: ANSWER THE FOLLOWING QUESTIONS.
Q1. Is Flow data available for the pipelines being lined?
A1. No flow data is available for the pipelines being lined.
Q2. Are there any pump station upstream of the lining work being performed?
A2. Pump stations and force mains are shown on the plans.
Q3. Are videos available of the pipelines being lined?
A3. TV Inspection reports are provided as Appendix A and described in Section 00331, TV
INSPECTION AND MH INSPECTION REPORTS PROVIDED BY THE OWNER. Videos
of what was encountered at the time of the inspection may be seen by appointment, upon
request, during the bidding period at the office of Weston & Sampson Engineers Inc., 55
Walkers Brook Drive, Reading, Massachusetts 01867.
Q4. Will the City of Newton provide a staging area?
A4. Per Plan Sheet G001, Construction Note 38, “CONTRACTOR SHALL PROVIDE
THEIR OWN STAGING AREA. NO STAGING OR LAY-DOWN AREA SHALL BE
PROVDED BY THE CITY OF NEWTON.”
Q5. On Wheeler Rd, is A005-70a to 69 getting lined? Highlighted on map but not on table
A5. Per Plan Sheet C106, Note 3 on the Structural Cured-in-Place Manhole to Manhole
Liner table, “A005-69 is a tee connection in A005-70A to A005-6 at STA 0+66. Sewer flow
from Sharpe Road connects to tee connection A005-69 from A005-110A. Contractor shall
bypass sewer flow from Sharpe Road as part of work. Bypass for sewer flow from Sharpe
Addendum #1 - Project Manual #24-37 CIP Project 9 Sewer Rehabilitations Phase I
Page 1 of 2
Road shall be considered incidental to the work and shall not be measured separately for
payment.”
All other terms and conditions of the IFB remain unchanged.
PLEASE ENSURE THAT YOU ACKNOWLEDGE ALL ADDENDA ON YOUR
BID FORM. FAILURE TO ACKNOWLEDGE ALL ADDENDA COULD
RESULT IN REJECTION OF YOUR BID AS NONRESPONSIVE.
Thank you.
Nicholas Read
Chief Procurement Officer
Addendum #1 - Project Manual #24-37 CIP Project 9 Sewer Rehabilitations Phase I
Page 2 of 2

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Solicitation: BD-24-1142-311-311-101725 Header Information Bid Number: BD-24-1142-311-311-101725 Description: IFB - Neighborhood Safety

Commonwealth of Massachusetts

Bid Due: 5/09/2024

Bid Title: RFR: Toilet Partition Replacement at Wilson Middle School - Avail. 4/24/24.

Town of Natick

Bid Due: 5/13/2024

Bid Solicitation: BD-24-1019-DCP06-OOL01-101215 Responses Due in 46 Days, 19 Hours, 8 Minutes Header

Commonwealth of Massachusetts

Bid Due: 5/30/2024

Bid Solicitation: BD-24-1019-DCP06-OOL01-101215 Responses Due in 51 Days, 19 Hours, 26 Minutes Header

Commonwealth of Massachusetts

Bid Due: 5/30/2024