CHILLER REPLACEMENT-GICC BUILDING

Agency: City of College Park
State: Georgia
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Aug 31, 2026
Due Date: Sep 8, 2026
Solicitation No: 27-67
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Bid Number: 27-67
Bid Title: CHILLER REPLACEMENT-GICC BUILDING
Category: CP - Training
Status: Open
Description:

This solicitation seeks qualified contractors to provide turnkey chiller replacement and installation services at the Georgia International Convention Center (GICC). The project includes demolition and removal of existing equipment, installation and integration of new chiller plant equipment, piping, electrical, controls, testing, and commissioning. The completed project shall provide a reliable, efficient, and fully operational chiller plant to support the GICC’s ongoing facility operations and events.

Publication Date/Time:
8/25/2026 3:00 PM
Closing Date/Time:
9/8/2026 3:00 PM
Submittal Information:
https://www.bidnetdirect.com/georgia/cityofcollegepark
Contact Person:
[email protected] for site visit. Must be 24hours in advance
Related Documents:

Attachment Preview

CITY OF COLLEGE PARK Contracts and Procurement Department
Attention: Carl Hall, Purchasing Department
3667 Main Street City Hall
College Park, Georgia 30337
Email: Carlton.Hall@collegeparkga.gov Phone: (404)-767-1537ext. 1500
RE: REQUEST FOR QUOTE NO. 27-67
CHILLER REPLACEMENT
OBJECTIVE
PURPOSE
The purpose of this solicitation is to obtain qualified contractors to provide turnkey chiller
replacement and installation services, including all labor, materials, equipment, demolition, removal
and disposal, piping, electrical, controls, testing, commissioning, and related work necessary to
provide the Georgia International Convention Center (GICC) with a complete, reliable, and efficient
chiller plant system. The project is intended to improve the facility’s cooling system functionality,
reliability, and operational efficiency while supporting the GICC’s ongoing building operations and
maintaining the necessary indoor environmental conditions for its occupants, events, and activities.
MINIMUM QUALIFICATIONS & GENERAL REQUIREMENTS
Respondents must demonstrate experience with commercial HVAC and chiller installation projects
of similar size and scope and possess all required licenses and insurance coverage. The selected
contractor shall provide all labor, materials, equipment, supervision, permits, and related services
necessary for a complete turnkey chiller installation in accordance with applicable codes,
manufacturer specifications, safety standards, and City requirements.
SCOPE of SERVICE
1. General Scope
Provide all labor, materials, equipment, supervision, engineering coordination, and
incidentals necessary to furnish and install a complete, operational chiller plant system.
Work shall be executed as a fully coordinated turnkey installation, including demolition,
replacement, integration, testing, and commissioning.
All work shall comply with:
Manufacturer requirements (including Trane installation standards where applicable)
Applicable mechanical, electrical, and building codes
OSHA requirements and applicable site safety standards
EPA requirements for refrigerant handling and recovery
Replacement chiller equipment shall be equal to or better in quality and efficiency than the
existing Trane chiller equipment.
2. Demolition, Removal & Disposal
Remove and properly dispose of existing chiller plant equipment, including:
Existing chillers (1)
Condenser water pumps and chilled water pumps
Associated starters, VFDs, actuators, and controls
Existing chiller plant control system
Existing air compressor (if present)
Chiller isolation and head pressure control devices
Contractor shall:
Recover refrigerant per EPA regulations
Disconnect and safely remove mechanical and electrical systems
Provide rigging, cranes, and lifting operations
Dispose of all equipment and refrigerants legally and responsibly
Protect existing equipment and systems that are to remain in service
Coordinate all equipment removals and shutdowns with the Owner prior to commencing
work
Include all labor, equipment, rigging, cranes, lifting equipment, and incidental work
necessary for safe removal and disposal
3. New Mechanical Equipment Installation
Furnish and install:
(1) new centrifugal chiller (Trane or equal approved)
Condenser water pumps (qty per design basis)
Chilled water pumps (qty per design basis)
Cooling tower fan motors and belts (as required)
Heat exchanger cleaning and recommissioning (existing plate frame HX)
Include:
Setting, alignment, and securing of equipment on existing or new pads
Verification of service clearances
Equipment pad modifications as required
Minimum flow bypass provisions
Contractor shall verify existing equipment conditions and dimensions during the required
site investigation prior to final equipment selection and ordering.
4. Piping, Valves & Hydronic Systems
Provide complete chilled water and condenser water system modifications including:
New and modified piping for chillers, pumps, cooling towers, and heat exchanger
Condenser head pressure control valves
Isolation valves for:
o Chillers
o Cooling towers
o Heat exchanger
o Pumping systems
Minimum flow bypass piping
Pressure testing of all new and modified piping systems
System flushing and preparation for startup
Insulation replacement where removed or modified
5. Electrical Scope
Provide complete electrical integration including:
New power feeds to all mechanical equipment
Disconnect/reconnect of existing electrical services as required
New or reused breakers as applicable
Installation of:
o VFDs for chilled water pumps
o VFDs for cooling tower fans (if applicable)
Control wiring between equipment and BAS
All conduit, wire, fusing, relays, and terminations required for a complete system
Include disconnects, starters, overload protection, control power, terminations, and
associated electrical accessories as required
6. Controls / Building Automation System (BAS)
Provide a fully functional control system including integration of all chiller plant
components.
System shall include a Trane Tracer-based BAS or approved equivalent:
Central system controller with web interface
Integration of:
o Chiller
o Pumps
o Cooling towers
o Heat exchanger
Control valves and end devices as required
Monitoring of temperatures, pressures, and equipment status
Alarms and safeties for system protection
Outside air temperature/humidity monitoring
Minimum flow bypass control logic
7. Refrigerant Monitoring & Safety Systems
Provide a dual-zone refrigerant monitoring system including:
Sensors at each chiller
Audible/visual alarms inside mechanical room
Audible/visual alarms outside mechanical room
Integration with BAS or standalone alarm system
Testing and commissioning of all alarm functions
8. Start-Up, Testing & Commissioning
Provide complete system startup including:
Factory-authorized startup assistance (Trane or equivalent)
Functional performance testing
Pressure testing of piping systems
Verification of controls and interlocks
Load testing under normal operating conditions
Final system balancing and verification
9. Documentation & Closeout
Provide:
Equipment submittals
O&M manuals
Startup reports
Warranty documentation
As-built documentation (if available)
Owner training session
Final site cleanup
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Follow 78287 - CBR - B20128 Air Handler Refurbishment Active Contract Opportunity Notice

DEPT OF DEFENSE

Due by 11/28/2026

Follow Lab Humidification System Pilot Project - 75D301-26-Q-79242 Active Contract Opportunity Notice ID

HEALTH AND HUMAN SERVICES, DEPARTMENT OF

Due by 9/11/2026

Follow Portable Misting Cooler/FAN Active Contract Opportunity Notice ID W911S226U3850 Related Notice W911S226U3850

DEPT OF DEFENSE

Project: B-2708LM On Demand HVAC Air Filter Replacement Services Ref. #: B-2708LM On

Gwinnett County Public Schools

Due by 9/16/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.