Chickasaw State Park Stem Repair

Agency: State Government of Tennessee
State: Tennessee
Type of Government: State & Local
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
Posted Date: Oct 7, 2026
Due Date: Oct 22, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Event ID and Documents: Event 32701-14032
Terms and Conditions
Specifications
Pre-Bid Info
Event Start-Response Due: 10/07/2026

10/22/2026
Event Name: Chickasaw State Park Stem Repair
Last Updated:

Attachment Preview

Chickasaw Lake Lajoie Stem Repair
Chickasaw State Park
20 Cabin Lane
Henderson, TN 38340
This request for bids is for a contract to furnish all material, equipment, supplies and labor
necessary to do any dredging and stem repairs at Chickasaw Lake Lajoie Dam.
General Conditions
1) On-Site work shall be performed between receipt of purchase order and January 1st, 2027,
unless a written exception is granted by the Facilities Management Regional Manager.
2) For this project, the Contractor and applicable subcontractors shall possess an active HC-D,
BC, BC-B, BC-b(sm), or BC-C license. Failure of the contractor and applicable subcontractors
to provide copies of their appropriate license shall result in the disqualification of the bid. All
licenses shall be verified via Tennessee Commerce and Insurance database before project
award. This project may require a performance and payment bond.
3) The Contractor shall not assign this contract or enter a subcontract for this project without
prior written approval of Facilities Management. The Contractor's bid shall include a
Declaration of Intended Use of Subcontractor(s) form that clearly states the intent to use a
subcontractor, along with their name and license number. Facilities Management reserves the
right to reject a bid in whole or a subcontractor, based upon failure to possess an appropriate
active TN builder's license. After project award, any proposed substitution or addition of a
subcontractor shall require written Facilities Management acceptance and approval before
being allowed on-site or perform any work under this contract. All subcontractors are required
to have an active TN building contractor license for the applicable work to be performed before
and throughout the project. Any proposed subcontractor failing to meet these requirements are
not allowed to perform work on any portion of this project.
4) All work shall comply with state-approved versions of the IBC, and NEC standards, regulations,
other applicable codes, manufacturer's recommendation, and best practices. Contractor is
responsible for all permits and associated fees.
5) Only the Facilities Management Project Manager or Facilities Management Regional Manager
can approve any alterations, modifications, and substitutions of the specifications or
requirements of the project. No additional work shall be authorized unless pre-approved by
either the Project Manager or Regional Manager in writing. Park/Hospitality management and
staff are not authorized to make any changes, deletions, or additions to the project or accept
any portion of the work. This contract shall be modified only by a written agreement signed by

all parties. Any work performed outside of the written scope with any written change orders will
be the responsibility of the contractor or others and not Facilities Management. All questions,
directives, and acceptance shall come only from either the Facilities Management Regional
Manager and/or Project Manager.
6) Contractor shall keep the jobsite clean and safe and leave in a neat and tidy manner.
7) All color selections shall be provided to the contractor by the Facilities Management Project
Manager.
8) All material substitutions must be pre-approved prior to bid acceptance.
9) All materials shall be installed per manufacturer's recommendation, industry best practice,
and applicable code.
10) All dimensions listed are approximate. Contractor is solely responsible for verifying actual
dimensions prior to ordering any materials or bidding. No allowances shall be made due to a
bidder neglecting to visit the site and verifying dimensions and conditions.
11) All work performance under this Contract shall be under the full-time direction of the
Contractor. The Contractor shall be responsible for work and performance, and damages of any
subcontractors and/or independent contractors or laborers hired in connection with the work
under this Contract.
General Scope of Work
Description of Demolition or Associated Work
All debris shall be removed from the park property and disposed of in accordance with all
applicable regulations, unless specifically noted.
1) The Contractor shall demo the existing stem, components and dispose properly off
state property.
2) The Contractor shall do any necessary dredging that is required. Remove
approximately ten (10) cubic yards of existing siltation necessary to expose riser
gate. All dredged material shall be captured on-site, and preventative measures put
in place to ensure that material does not re-enter lake or downstream portion in
accordance with limited state dredging general permit.
3) The Contractor shall make necessary repairs to ensure the safe operation of riser
gate and control mechanisms for spillway at Lake Lajoie.
4) The Contractor shall notify the listed contacts if any additional damage is found and
not proceed until authorized.

Item Approved Brand or Pre-Approved Equal Specific Requirements
Stem guide Custom OAL 9-3/4 x 3-inch HT, ID: 2-1/4-inch x 3-inch HT Two 1-inch Bolt holes drilled thru
Stem Custom 2 inch 4 x 12 feet 316 Stain 2g Acme RH 1S DES Thread one side of the bar 2 inch 4 x 6 feet 2G Acme RH 1S Thread one side of the bar 2 inch 4 x12-inch 2G Acme RH 1S Runout is acceptable
Stem Custom 2 inch 4 x 12 feet 316 Stain 2G Acme RH 1S Des Thread both sides of the bar 2 inch 4 x 12 inch 2G Acme RH 1S Runout is acceptable
Hex Coupler Nut Custom 2 inch 4 Acme BZ Hex coupler nut 2G Acme RH 1S , 3-1/8 inch ATF x 5 inch O.A.L. Thread from both ends 2-1/4 inch with 12 inch Undercut between the threads 1 start
Hex Jam Nut 932 Bronze 2 inch 4 Acme BZ Hex Jam Nut 2G Acme RH 1S 3-1/8 inch ATF x 1inch O.A.L.

New Work
1) The Contractor shall provide and install a new stainless steel stem with
components to ensure the safe operation of the riser gate and control mechanisms.
2) Once the Contractor has verified and assured operability, the Contractor shall
demonstrate to park staff and train on its safe operation.
3) The Contractor shall provide and install new stem, thrust blocks, jam nuts, and
brackets with equipment or actuator with equipment.
Approved Brands and Specifics (or Pre-approved Equal)
Item Approved Brand or Specific Requirements
Pre-Approved Equal
Stem guide Custom OAL 9-3/4 x 3-inch HT, ID: 2-1/4-inch x 3-inch
HT
Two 1-inch Bolt holes drilled thru
Stem Custom 2 inch 4 x 12 feet 316 Stain 2g Acme RH 1S
DES Thread one side of the bar 2 inch 4 x 6 feet
2G Acme RH 1S
Thread one side of the bar 2 inch 4 x12-inch
2G Acme RH 1S Runout is acceptable
Stem Custom 2 inch 4 x 12 feet 316 Stain 2G Acme RH 1S
Des
Thread both sides of the bar 2 inch 4 x 12 inch
2G Acme RH 1S Runout is acceptable
Hex Coupler Custom 2 inch 4 Acme BZ Hex coupler nut 2G Acme RH
Nut 1S , 3-1/8 inch ATF x 5 inch O.A.L.
Thread from both ends 2-1/4 inch with 12 inch
Undercut between the threads 1 start
Hex Jam Nut 932 Bronze 2 inch 4 Acme BZ Hex Jam Nut 2G Acme RH 1S
3-1/8 inch ATF x 1inch O.A.L.

Block Nut 932 Bronze 2 inch 4 Acme BZ Stem Block Nut 2G Acme RH 1S, 5 inch x 6-1/4 inch x 5 inch Length Internal Thread: 2 inch 4 Acmen2G RH 1 start
TRIVACO VO- 1SDT Bevel Gear Dual Operation (8.23:1) Primary Ratio (20.86:1) Secondary Ratio Base Options F/FA10 / F/FA12 / F/FA14 Red Epoxy Primer w Machined Stem Nut w Handwheel Sambo-TRIVACO: VO-1SDT

Block Nut 932 Bronze 2 inch 4 Acme BZ Stem Block Nut 2G Acme RH
1S, 5 inch x 6-1/4 inch x 5 inch Length
Internal Thread: 2 inch 4 Acmen2G RH 1 start
TRIVACO VO- Bevel Gear Dual Operation (8.23:1) Primary
1SDT Ratio (20.86:1) Secondary Ratio
Base Options F/FA10 / F/FA12 / F/FA14
Red Epoxy Primer w Machined Stem Nut w
Handwheel Sambo-TRIVACO: VO-1SDT
Specific Instructions
1) The Contractor shall coordinate schedule with park staff for work schedule.
2) Jobsites shall be kept in a clean and orderly fashion; all demo and construction waste shall be
disposed of daily.
3) The Contractor is responsible for removing all related waste and materials from the park upon
completion of work.
4) This is a turnkey job and all aspects shall be left in a finished condition.
Additional Terms and Conditions
1) All aspects of this job shall be left in a finished condition: All finish work, interior and exterior
walls and trim, finish painting, caulking and final cleanup are included in this contract.
2) Contractor shall be responsible for determining where all utilities are on the job site and care
should be taken to protect the utilities from any damage caused by the demo/construction. This
shall include any underground utilities around the job site area. If damage occurs, it shall be
repaired within a twenty-four (24) hour period from the time damage occurs.
3) Contractor shall perform work on regular time and shall invoice work time and material not to
exceed the quoted price. Any variance in quote shall be addressed only with a representative of
the Facilities Management Regional Office before any additional work is undertaken or
materials ordered.
4) Work shall be scheduled to avoid any interference with normal operation of the park as much
as possible. During the construction period, coordinate construction schedules and operations
with the park manager. Work shall be conducted during the normal business hours of

Monday through Friday, 8:00 a.m. to 4:30 p.m., unless an alternate schedule is approved
by Facilities Management.
5) Successful Contractor shall schedule and attend a pre-construction conference where a pre-
construction form shall be signed by Facilities Management, Contractor and Park Manager or
park representative before work can begin. Contractor shall also schedule and attend a final
inspection where a final inspection form shall be signed by Facilities Management, Contractor
and Park Manager or park representative before final invoice shall be paid.
6) The Contractor shall protect areas adjacent to his work and shall be required to repair any
damage they may cause. Contractor shall protect work of other trades. Contractor shall correct
any painting related damage by cleaning, repairing, or replacing, and refinishing as directed by
Facilities Management. Contractor shall leave residences and other buildings in a habitable
manner after hours by securing unfinished openings.
7) Workmanship is to be warrantied for not less than one year from date of final inspection.
Materials shall be warrantied as per manufacturer's warranty.
8) Unless otherwise indicated, all materials, equipment, and supplies shall be new and in good
condition, UL listed when applicable, and all work accomplished in a manner acceptable to
Facilities Management.
9) Clean up of the project site shall be the responsibility of the contractor. Contractor to assure
that job site is clean of nails, debris, etc., at end of each day to ensure safety. Contractor shall
clean up and haul away all scrap when work is completed to an approved location off state
property.
10) Contractor, employees, and sub-contractors shall be licensed, certified, or registered as
required. They shall be registered in the State of Tennessee Edison purchasing system.
11) The State of Tennessee shall not be held liable for any damage, loss of property, or injury of
personnel resulting from actions of the contractor and/or his/her sub-contractors or
employees.
12) At all times, the Contractor shall have a copy of project specifications, permits, and certificate
of insurance on-site.
13) Notwithstanding any use of the approved subcontractors, the Contractor shall be the prime
contractor and responsible for compliance with all terms and conditions. The State reserves the
right to request additional information or impose additional terms and conditions before
approving an assignment of this contract in whole or in part or the use of subcontractors in
fulfilling the Contractor's obligations under this contract.
14) The Contractors and all subcontractors are not authorized to day laborers or temporary labor on
this project without the express written permission of Facilities Management.

15) Invoice shall be submitted for payment not before project completion and final project
acceptance but also no later than 10 days after project completion and acceptance. A copy of
the invoice shall be submitted to: Susan Blankenship West Tennessee Regional Office, 21540
Natchez Trace Road Wildersville Tn. 38388, o731-968-6608 c 731- 307-9718.
Susan.blankenship@tn.gov
16) Facilities Management Regional Contacts for this project are:
Project Manager: Reid Mullins, 731-412-4042, reid.mullins@tn.gov
Regional Manager: Steve Hicks, 731-552-0659, steve.hicks@tn.gov

This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Bid Number: 27-005 Bid Title: Valve Replacement Waste Water Treatment Plant Category: Bid

City of Bristol

Due by 10/23/2026

RFP RFP RFP 102626TW RFP 102626TW Cordova HS Fire Alarm and Life Safety

Memphis City Schools

Due by 10/26/2026

RFP RFP 102726AW Craigmont HS and White Station ES Cooling Tower Replacements Deadline

Memphis City Schools

Due by 10/27/2026

Submittals due by November 5, 2026 at 10am. ITB 6936 Price Sheet Attached

City of Johnson City

Due by 11/05/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.