CGC VISE - MDE Diagnosis
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
|---|---|
| State: | Florida |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Apr 9, 2025 |
| Due Date: | Apr 11, 2025 |
| Solicitation No: | 70Z08525Q12519 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Apr 09, 2025 02:17 pm PDT
- Original Date Offers Due: Apr 11, 2025 08:00 am PDT
- Inactive Policy: Manual
- Original Inactive Date: Apr 11, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 2090 - MISCELLANEOUS SHIP AND MARINE EQUIPMENT
-
NAICS Code:
- 336611 - Ship Building and Repairing
-
Place of Performance:
Saint Petersburg , FL 33701USA
STATEMENT OF WORK (SOW)
FOR
USCGC VISE Isotta Fraschini MDE Diagnosis
USCGC VISE’s Main Diesel Engine is exhibiting metallic tapping while running and has an immediate need for technical support for tasks outlined in this Statement of Work (SOW).
1.0 GENERAL
-
- Background
The 75’ WLIC asset, USCGC VISE, has a metallic tapping on their MDE that is consistent with RPM.
-
- Scope
The scope of this contract is defined by the efforts and tools required to support USCGC VISE (WLIC 75305). The Contractor shall provide all labor, materials, and tools necessary to diagnose where/what is causing the metallic sound.
-
- OBJECTIVE
The goal is to return CGC VISE’s fire alarm system to designed system parameters by identifying the cause of the metallic tapping and repairing.
-
- APPLICABLE DOCUMENTS
-
-
- Compliance Documents
-
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2020, General Requirements
- SPECIFIC REQUIREMENTS/TASKS
Unless otherwise stated, this contract applies to on-site support for USCGC VISE (WLIC 75305) in St. Petersburg FL.
2.1 Troubleshoot, Diagnose, Repair
The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.
-
-
- The Contractor shall identify the source of the metallic tapping.
- The Contractor shall make necessary repairs to resolve the unusual metallic noise and prevent any damage caused by the faulty component.
-
2.2 Test Thoroughly and Document
The Contractor shall ensure the system is fully functional by preforming a system operational test to be witnessed by Engineer Petty Officer (EPO) or the EPO’s designated representative.
2.2.1 The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office.
- CONTRACTOR PERSONNEL
3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
- OTHER APPLICABLE CONDITIONS
4.1 PERIOD of Performance
The period of performance for this contract shall not exceed 14 calendar days from the date of award.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be at CGC VISE at 600 8th Ave SE, St. Petersburg FL 33701 unless an alternate location is approved by the Coast Guard.
4.3 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship’s operations.
4.4 TRAVEL
Contractor travel may be required to support this requirement. All travel required by this task shall be provided by the Contractor at no expense to the Government.
4.5 Daily Progress Reports
The Contractor shall hold a daily progress meeting with the Engineer Petty Officer and/or Commanding Officer upon arrival at the asset each morning of the visit. This report shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work.
4.6 General Report Requirements
The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications).
5.0 GOVERNMENT FURNISHED RESOURCES
NA
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.
- GOVERNMENT ACCEPTANCE PERIOD
The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
8.0 DELIVERABLES
The Contractor shall provide a trip report IAW 2.2 of this SOW.
- COAST GUARD ISLAND, BLDG 50-7
- ALAMEDA , CA 94501
- USA
- Tyler Melton
- Tyler.k.melton@uscg.mil
- Phone Number 5104375437
- Apr 09, 2025 02:17 pm PDTCombined Synopsis/Solicitation (Original)
See Also
Project: Lift Station - K070 & Lift Station - K095, Control Panel, Floats,
Toho Water Authority
Due by 10/08/2026
Project ID: 2025-26-046 Title: SHIP Program Niurka Ortiz Addenda: 0 Release Date: 8/30/2026
City of Hialeah
Due by 9/29/2026
Follow USCG Base Miami Beach Replacement Fenders Active Contract Opportunity Notice ID 31020PR260000231
HOMELAND SECURITY, DEPARTMENT OF
Due by 9/18/2026
Project: FLORAMAR AND MARINE PARKWAY 12-INCH WATER MAIN Ref. #: IFB-BW-26-109 Type: IFB
Pasco County
Due by 9/29/2026