CGC KATMAI BAY - BOILER STACK CLEANING
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
|---|---|
| State: | Michigan |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jan 17, 2025 |
| Due Date: | Jan 27, 2025 |
| Solicitation No: | 70Z085Q01986 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Jan 17, 2025 10:53 am PST
- Original Date Offers Due: Jan 27, 2025 08:00 am PST
- Inactive Policy: Manual
- Original Inactive Date: Jan 27, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 2090 - MISCELLANEOUS SHIP AND MARINE EQUIPMENT
-
NAICS Code:
- 336611 - Ship Building and Repairing
-
Place of Performance:
Sault Sainte Marie , MI 49783USA
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the Boiler exhaust stack uptakes.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 140 WTGB 259-001, Rev -, Diesel Exhaust Systems, Arrangements & Details
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
Other References
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to following:
- Access covers.
- Exhaust stack.
- Boiler.
- Exhaust pipe expansion joints.
- Exhaust insulation blankets.
3.2 Safety precaution. The Contractor must rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.3 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.4 Cleaning. The Contractor must clean the interior surfaces of the exhaust piping to the Boiler, shown on Coast Guard Drawing(s) 140 WTGB 259-001, to a condition free from soot, tar, and any other foreign matter as follows:
3.4.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
3.4.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.4.3 Upon completion of cleaning, do the following:
3.4.3.1 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.4.3.2 Reassemble exhaust piping; renew all disturbed flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all disturbed fasteners.
3.5 Inspection and report. The Contractor must perform a visual inspection of the following components; submit a CFR:
- Exhaust stack access hatches, including all associated studs and nuts.
- All cleaned exhaust stack surfaces.
- All exhaust expansion joints, including associated bolts.
3.5.1 Following cleaning of the interior of each uptake, the Contractor must demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of uptake has been satisfactorily cleaned according to the work plan.
3.6 Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.7_Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
3.8 Period of performance. (POP) 27-31 Jan 2025
- COAST GUARD ISLAND, BLDG 50-7
- ALAMEDA , CA 94501
- USA
- Tyler Melton
- Tyler.k.melton@uscg.mil
- Phone Number 5104375437
- Jan 17, 2025 10:53 am PSTCombined Synopsis/Solicitation (Original)
See Also
General Information Document ID RFP-171-260000002566-1 Status Open Description 751/26404.MNB; Harley BAS - BAS
State of Michigan
Due by 10/08/2026
Basic Information Negotiation 186823 Title Planned Commercial Demolition of 21800 Joy (Group 260)
City of Detroit
Due by 9/15/2026