CERCLA Site Inspection – Cody/Cady Mine Site, Mark Twain National Forest, Wayne County, Missouri
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Missouri |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Aug 6, 2026 |
| Due Date: | Aug 20, 2026 |
| Solicitation No: | 12443926Q0208 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Aug 06, 2026 01:59 pm CDT
- Original Date Offers Due: Aug 20, 2026 02:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Sep 04, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: F099 - NATURAL RESOURCES/CONSERVATION- OTHER
-
NAICS Code:
- 541620 - Environmental Consulting Services
-
Place of Performance:
MO 65401USA
CERCLA Site Inspection – Cody/Cady Mine Site, Mark Twain National Forest, Wayne County, Missouri
Notice Type: Solicitation
Solicitation Number: 12443926Q0208
Posted Date: 8/6/26
Response Due Date: 8/20/26
Contracting Office: USDA Forest Service, Mark Twain National Forest
Contracting Officer: Easter, David - FS, MN
Primary Product/Service Code: F999 – Other Environmental Services
NAICS Code: 541620 – Environmental Consulting Services
Solicitation Procedure: Simplified Acquisition (SAP) under FAR Part 12
Extent Competed: Full and Open Competition under SAP
Anticipated Contract Vehicle: Stand-alone Contract
Anticipated Contract Type: Firm-fixed-price; under $75,000
Set-Aside: Small Business
Project Overview
The USDA Forest Service seeks a qualified contractor to perform a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Site Inspection (SI) at the Cody/Cady Mine Site, an abandoned iron mine managed by the Forest Service in Wayne County, Missouri. The SI will determine the presence and extent of onsite soil contamination, focusing on arsenic (As) and lead (Pb) concentrations. The work includes incremental sampling methodology (ISM) soil sample collection, laboratory analysis, and preparation of a Site Inspection Report.
Scope of Work
Field Collection: 27 soil samples + 12 QA replicates (total 39 field samples, 30 aliquots each) across defined Decision Units (DUs).
Laboratory Processing: Drying, disaggregating, sieving, milling, and analysis using EPA SW-846 Methods (6010D for TAL metals, excluding mercury and cyanide).
Quality Control: Triplicate QA replicates for ≥20% of DUs, laboratory QC subsamples, trip blanks, method blanks, and equipment blanks.
Reporting: SI report with validated data, maps, GIS layers, and comparison to federal/state/tribal criteria. Deliverables include draft and final reports, spatial data in ESRI File Geodatabase format, and Section 508-compliant electronic documents.
Evaluation Factors
Best Value-Tradeoff process:
Experience and Qualifications of Key Personnel (most important)
Past Performance
Technical Approach and Project Work Plan
Geographic Location (least weight)
Price (weighted as described in solicitation)
Offerors must provide resumes, relevant experience, and a clear technical approach. Past performance on similar contracts within the last five years is required.
Schedule
Field Sampling: Begin within 60 days of notice to proceed.
Laboratory Analysis: Preliminary results within 60 days of field completion; validated results within 90 days.
Reporting: Draft SI report within 60 days of lab data; final report within 21 days of Forest Service acceptance.
Site Access
Site is accessible by foot via a ¼ mile skidder trail off MO-49. Maps and GIS data will be provided.
Submission Instructions
Submit project work plan, pricing, and personnel qualifications electronically.
All documents must comply with Section 508 accessibility requirements.
Use the attached schedule for cost elements.
- NORTHERN RESEARCH STATION 1992 FOLWELL AVENUE
- SAINT PAUL , MN 55108
- USA
- Samuel Knopka
- samuel.knopka@usda.gov
- Phone Number 573-341-7478
- David Easter
- david.easter@usda.gov
- Aug 06, 2026 01:59 pm CDTCombined Synopsis/Solicitation (Original)
See Also
US-56 Corridor Management Project (2026) - Baldwin City, KS 16-1308 StatusAccepting Bids Bid
Drexel Technologies
Due by 9/30/2026
Basic Information Negotiation STATE 0000000567SL Title Natural Resources Stewardship Projects Negotiation Type SINGLE
State Government of Missouri
Due by 9/16/2026
Follow F999--Bio Pond Restoration and Stewardship for John Cochran and Jefferson Barracks VA
VETERANS AFFAIRS, DEPARTMENT OF
Due by 10/21/2026
US-56 Corridor Management Project (2026) - Baldwin City, KS 16-1308 StatusAccepting Bids Bid
Drexel Technologies
Due by 9/30/2026