Central Energy Plant Construction
| Agency: | Melbourne Orlando International Airport |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 15, 2026 |
| Due Date: | Oct 6, 2026 |
| Solicitation No: | ITB 2026-0810 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Main
Agency
Melbourne Orlando International Airport
Melbourne Orlando International Airport
Status
Active
Active
Fiscal Year
2026
2026
Type
Invitation to Bid
Invitation to Bid
Department
Online Submissions
No
No
Project Estimate
Piggyback Solicitation
No
No
Insurance Required
No
No
Bid Bond Required
Yes
Yes
Bid Bond Amount
5%
5%
Performance Bond Required
No
No
Performance Bond Amount
Construction Bond Required
No
No
Construction Bond Amount
Scope of Services
The Melbourne Airport Authority (MAA) is seeking to replace the MEP and HVAC systems within the original terminal that was constructed in 1989. Equipment has been prepurchased in the first phase of this multi-phase project. Phasing is based on the grant funding available from both State and Federal resources. This phase of work is to replace the Central Energy Plant (CEP) with an enclosed structure with new water cooled chillers and cooling towers on the roof. This phase of work will also create a new main distribution panel for the electrical serving the CEP and the existing 1989 terminal. A new generator, pre-purchased, will also be installed in this phase. This is a Lump Sum Contract. The successful bidder will be responsible for maintenance of traffic, coordination with other contractors that may be doing work within the area, and for providing maximum support to the Melbourne Airport Authority in maintaining their operations and other functions at times specified by the Owner during installation. Construction will occur while the airport is operational, and provisions will need to be made to accommodate existing airfield activities adjacent to the project zone.
The Melbourne Airport Authority (MAA) is seeking to replace the MEP and HVAC systems within the original terminal that was constructed in 1989. Equipment has been prepurchased in the first phase of this multi-phase project. Phasing is based on the grant funding available from both State and Federal resources. This phase of work is to replace the Central Energy Plant (CEP) with an enclosed structure with new water cooled chillers and cooling towers on the roof. This phase of work will also create a new main distribution panel for the electrical serving the CEP and the existing 1989 terminal. A new generator, pre-purchased, will also be installed in this phase. This is a Lump Sum Contract. The successful bidder will be responsible for maintenance of traffic, coordination with other contractors that may be doing work within the area, and for providing maximum support to the Melbourne Airport Authority in maintaining their operations and other functions at times specified by the Owner during installation. Construction will occur while the airport is operational, and provisions will need to be made to accommodate existing airfield activities adjacent to the project zone.
Dates(All times are listed as
EST
)
Broadcast Date
8/11/2026 7:00 PM EST
8/11/2026 7:00 PM EST
Question End Date
9/10/2026 2:00 PM EST
9/10/2026 2:00 PM EST
Sample Due Date
Due Date
10/6/2026 2:00 PM EST
10/6/2026 2:00 PM EST
Bid Opening Date
Question End Date Reminder Notification
5 Day(s)
5 Day(s)
Sample Due Date Reminder Notification
0 Day(s)
0 Day(s)
Due Date Reminder Notification
5 Day(s)
5 Day(s)
Pre-Bid Meetings
Total: 1
(All times are listed as
EST
)
| Date | Time | Mandatory | Location |
| 8/19/2026 | 11:00 AM | Yes | MANDATORY A Mandatory Pre-Bid Conference will be held in the Melbourne Airport Authority Board Room, One Air Terminal Parkway, Suite 220, Melbourne, Florida 32901 on Wednesday, August 19, 2026 at 11:00 AM EDT, at which time a site visit will follow. Additional site visits for bidders needing additional information may visit the site between August 18, 2026, and September 3, 2026, on Tuesdays, or Thursdays only. The site is in a secure area of the Airport requiring escort. To arrange, please contact Sandra Acevedo at 321-723-6227, ext. 123, or sacevedo@mlbair.com and provide 24 to 48 hours advance notice. A government issued ID will be required. |
Shortlist Meeting
Total: 0
(All times are listed as
EST
)
| Date | Time | Location |
Documents
Total: 6
Commodity Codes
Total: 7
| Code | Description |
| [958-26] | Construction Management Services |
| [906-10] | Buildings - Architectural Design |
| [925-33] | Engineer Services, Professional |
| [925-34] | Energy Management Engineering |
| [914-68] | Plumbing |
| [914-38] | Electrical |
| [925-67] | Mechanical Engineering |
Publications
Total: 1
| Publication | Date |
| Florida Today | 8/10/2026 |
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Notice: 31532195 Notice of Bid/Request for Proposal Division: CHARLES PERRY PARTNERS, INC. View
Florida Department of State
Due by 12/03/2026
North Ridge Trail Phase 1 Contract Solicitation Number: Bid 26-227 Open Date: November
Polk County
Due by 11/18/2026
Title Ryan White Care Act Part A Minority AIDS Initiative Solicitation Type RFP
City of Jacksonville
Due by 11/18/2026
Project ID: Title: ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed
Citrus County
Due by 12/08/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.