Central Bremerton Force Main Replacement

Agency: City of Bremerton
State: Washington
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: Mar 31, 2025
Due Date: Apr 28, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Title: Central Bremerton Force Main Replacement
Category: Public Works & Utilities
Status: Open
Description:

The WORK includes but is not limited to the following description. The City of Bremerton will replace a damaged section of the Central Bremerton Force Main along Gregory Way, Naval Avenue, and 1st Street with 18-inch AWWA C905 PVC. The existing pipe is 14-inch ductile iron. The replacement area begins approximately 150 ft east of Gregory Way & High Avenue and extends to 1st Street & Montgomery Avenue, for a total pipe length of approximately 3,100 feet. Key locations include: the high point of the force main near High Avenue and Gregory Way, where an surge chamber will be installed; the intersection of Burwell Street and Warren Avenue, where a bypass pipe and isolation valves will be installed to allow the pipe to be drained; the reach of pipeline in Naval Avenue directly adjacent to the Naval Base Kitsap (NBK) access gate.

Two large fir trees (approximately 150 ft tall) will be removed from a residential front yard along Gregory Way. The removal shall be complete, including stumps, trunks, limbs, slash and debris. The homeowner’s landscaping will be removed and protected, then replaced after construction, along with new plants as specified. The removal and reconstruction shall also include concrete stairs, walls, fences walkways, and appurtenance structures. A portion of Gregory way will be impacted and repaired under the contract.

As part of surface restoration, 1st Street from Montgomery Avenue to Naval Avenue will be ground and repaved with hot mix asphalt, including the construction of ADA compliant access ramps and reconstruction of the storm sewer.


Publication Date/Time:
3/31/2025 12:00 PM
Closing Date/Time:
4/28/2025 11:00 AM
Contact Person:
Communication by phone/e-mail: David Powell, Telephone: (360) 979-7682, E-mail: david.powell@ci.bremerton.wa.us
Related Documents:
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Title: Wastewater Treatment Plant System Improvements Category: Public Works - Current Bids

City of Pasco

Bid Due: 6/09/2026

Specification Number Type Due Date Time Due - Pacific Title and Solicitation Documents

City of Tacoma

Bid Due: 6/09/2026

"79575">Bid #11-01 Mill Plain Blvd/SE 136th Avenue Intersection Current planholders list: Available on

City of Vancouver

Bid Due: 2/02/2045

Contract SR509 Miller Creek Fish Passage Contract summary This Project will remove (2)

State Government of Washington

Bid Due: 7/16/2026