Cedar Creek Section 2 Phase 2 Pipeline Replacement
| Agency: | Tarrant Regional Water District |
|---|---|
| State: | Texas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 29, 2026 |
| Due Date: | Dec 10, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: Cedar Creek Section 2 Phase 2 Pipeline Replacement
Addenda: 0
Release Date: 10/29/2026
Due Date: 12/10/2026
Post Information
Sealed Bid Process:No
Private Bid:No
Summary
Tarrant Regional Water District is seeking proposals for Cedar Creek Section 2 Phase 2 Pipeline Replacement .
Proposals are to be submitted through the Procurement Portal at https://procurement.opengov.com/portal/trwd . If experiencing any difficulty submitting a proposal, please contact the Buyer listed below.
Rebecca Crosson
rebecca.crosson@trwd.com
(817) 720-4479
Background
The Tarrant Regional Water District (TRWD) Cedar Creek Section 2 Phase 2 Pipeline Replacement Project consists of the replacement of approximately 4.4 miles of existing 72-inch prestressed concrete cylinder pipe (PCCP) with new welded steel raw water transmission pipeline ranging in size from 72-inch to 102-inch diameter. The pipeline extends from Mouser Way to the Kennedale Balancing Reservoir in southeast Tarrant County, Texas. Construction activities will occur within the existing 130-foot-wide TRWD easement, which also contains a parallel 90-inch PCCP pipeline. The Work includes installation of the new transmission main using both open-cut and trenchless construction methods. Appurtenances include air release valves (ARVs), blow-off valves (BOVs), and butterfly valves (BFVs), as well as all necessary connections to existing facilities. Additional scope includes roadway and utility crossings, and the abandonment or removal of existing pipeline facilities as required. Trenchless construction consists of two new tunnel installations and the reuse of one existing casing for crossings at Texas Department of Transportation (TxDOT) and Union Pacific Railroad (UPRR) rights-of-way. These installations will utilize steel casing, tunnel liner plate systems, and an existing 108-inch reinforced concrete casing pipe where applicable.
Timeline
808 East Northside Drive, Fort Worth, TX 76102
Virtual Option:
https://teams.microsoft.com/meet/252337017247260?p=eeIxgfECYuXKIsgFb2
4355 Eden Rd. South, Kennedale, TX 76060
See Also
Project: Flat Creek Reuse Project Phase 1A Ref. #: RFQ 2026-019 Department: Infrastructure
City of Waco
Due by 12/01/2026
STATE LET CONSTRUCTION CONTRACT, GALVESTON CO, INSTALL ILLUMINATION Follow Solicitation Solicitation ID: 0500-01-158_1126
State Government of Texas
Due by 11/04/2026
STATE LET CONSTRUCTION CONTRACT, HAYS CO, FDR, EDGE MILL, UNDERSEAL AND TOM OVERLAY
State Government of Texas
Due by 11/04/2026
STATE LET CONSTRUCTION CONTRACT, EL PASO CO, REPAIR ROADWAY Follow Solicitation Solicitation ID:
State Government of Texas
Due by 11/03/2026