CBL Pond Sediment Management – Hydraulic Dredging
| Agency: | Lower Colorado River Authority |
|---|---|
| State: | Texas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Nov 18, 2024 |
| Due Date: | Dec 20, 2024 |
| Solicitation No: | 000000071B |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: Use a hydraulic dredge and six-inch pump to remove materials from within the prescribed work area limits as indicated in Statement of Work document, pond dimensions are 340 ft x 210 ft x 15 ft. Remove materials from the pond bottom to within 3-6 inches above the original design depth of EL +325’-0” of the Combustion By-products Landfill (CBL) pond. Use geotextile containment bag(s) for placement of the dredge material within the prescribed material placement areas. Approximately 4-6 ft of gypsum material is present along with silt, sand and mud. More details available on Statement of Work document.
See Also
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
Fort Worth Independent School District
Due by 11/11/2026
Project ID: Title: Portable Construction and Maintenance Equipment Addenda: 0 Release Date: 10/7/2026
Houston-Galveston Area Council
Due by 11/19/2026
Solicitation Details eResponse Instructions Subscribe Print PDF Type: Invitation For Bids (IFB) Status:
City of Austin
Due by 11/19/2026
Project ID: Title: Construction, CCADF Sprinkler Heads Replacement Addenda: 0 Release Date: 10/13/2026
Collin County
Due by 11/19/2026