CAP26*360060 Basement Dehydration Installation
| Agency: | State Government of Alabama |
|---|---|
| State: | Alabama |
| Type of Government: | State & Local |
| Posted Date: | Jun 24, 2026 |
| Due Date: | Jun 30, 2026 |
| Solicitation No: | SRC0000034370 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Sourcing Project Number: | SRC0000034370 |
| Solicitation Label: | CAP26*360060 Basement Dehydration Installation |
| Status: | Open for Bidding |
| Due / Close Date: | 6/30/2026 |
| Main Commodity: | BUILDING MAINTENANCE, INSTALLATION AND REPAIR SERVICES |
| Solicitation Type: | Quick Quote |
| Buying Agency: | Capitol Operations and First White House |
| Sourcing Responsible First Name: | Jennifer |
| Sourcing Responsible Last Name: | Hodges |
|
Code
SRC0000034370
|
|
|
Solicitation Name
CAP26*360060 Basement Dehydration Installation
|
Solicitation Type
Quick Quote
|
|
Round #
Rounds are used to issue amendments and could be used to continue a solicitation with a “short-listed” set of suppliers.
1
|
Status
Open for Bidding
|
|
Begin
6/24/2026 2:53:29 PM (CST)
|
Award Status
|
|
End
6/30/2026 5:00:00 PM (CST)
|
|
|
Summary
Basement Dehydration Installation
Provide a building survey to verify location of dehydration units (antenna).
Furnish and install the Dehydration system in areas with high conductivity reading (by Hydrometer) over 100 on internal masonry walls and concrete slabs. Antennas to be installed through the affected areas as required to maximize the frequencies required to pull the damp away.
Provide a follow-up moisture measurement assessment until building areas are dry.
A Preconstruction Conference will be required prior to start of Work.
AREA OF WORK:
Basement areas and lower that have a Hydrometer reading of 100 or greater.
Contracted company to provide and install as required. The equipment does not require electricity.
COORDINATION:
The majority of the Work can take place during normal business hours. Normal Business hours are 7:00 am-5:00 pm. The Company to coordinate with Owner/Tenants. Weekends and State Holidays have no time constraint as coordinated with Facility Manager and tenant.
The State shall issue one (1) card key to the Company’s Project Manager. The Company’s Project Manager will be held responsible for his/her employees’ access and behavior. Any employee wandering around the building and/or displaying any improper behavior will be removed from the building and not be allowed to return.
TIMELINE: Five (5) Calendar days.
Warranty:
Company to Provide a 3-year dry-out guarantee
Company to provide a 25-year functional warranty on the building dehydration system. Company to add or replace units if deemed necessary at no cost to the Owner
|
|
|
Additional Information
|
|
Selected
|
| Documentation | Type | Att. | Validity End Date | Version |
| specs | Public Solicitation Documents (Approved) | |||
| Quick Quote Standard Boilerplate | RFx Commercial Document (Approved) |
See Also
Bid Details Title Paving and Traffic Stripe for the Realignment of CR-339 at
Shelby County
Due by 11/19/2026
Sourcing Project Number: SRC0000037581 Solicitation Label: ENGR-Kilby K Dorm - Door and Frame
State Government of Alabama
Due by 11/10/2026
Sourcing Project Number: SRC0000037487 Solicitation Label: Roll Up Door Repairs at Fort Whiting,
State Government of Alabama
Due by 11/11/2026
Posted Opportunity 06-18-07 FCA Deficiency HVAC Controls, Project 521-07-609ES VA logo C--FCA Deficiency:
The University of Alabama at Birmingham
Due by 7/21/2060