CANYON ROAD WATERLINE REPLACEMENT
| Agency: | State Government of Utah |
|---|---|
| State: | Utah |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 30, 2026 |
| Due Date: | May 11, 2026 |
| Solicitation No: | 2026-06 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: The Mandatory Pre-Bid Conference will Monday, May 4th at 2:00 PM.
Canyon Road Waterline Replacement:
Construction of approximately 3260 LF of 12” culinary water main, including trenching and road repair. Install 38 new culinary water meters, and connect them to the new 12”
culinary water main. Disconnect and remove 27 existing culinary meters. Install 5 new FH assemblies. Install approximately 3110 LF of 2” conduit for future FO cable. Install new
stripping at the intersection of Canyon Road and 620 S, install approximately 730 SF of new asphalt paving, install approximately 680 SF of stamped concrete, and install approximately
50 SF of sidewalk along 620 S.
Bid Alternate: Canyon Road Sewer Main Replacement:
Camera existing SS main in Canyon Road to determine feasibility of SS main and lateral replacement. Remove and replace approximately 500 LF of sewer main in Canyon Road,
install 2 new SSMHs, abandon 1 existing SSMH, and Replace 8 sanitary sewer laterals and connect them to the new SS main. Remove and replace approximately 80 LF of curb and
gutter and 450 SF of sidewalk.
***A MANDATORY PRE-BID CONFERENCE will be held at 2:00 PM (local time) on Monday, May 4th, 2026. ******
at the Springville City Offices, 110 South Main, Springville, Utah.
All contractors intending to submit a bid may attend to obtain relevant information concerning the project. Bidders are advised that information affecting drawings, specifications, conditions, scope of work, etc. may be discussed.
See Also
Project: DFCM Construction - Prequalified Mechanical Stage II - Uintah Basin Technical College
State Government of Utah
Due by 10/06/2026
Project: DFCM Construction - Prequalified Roofing Contractors - Utah Tech University - Taylor
State Government of Utah
Due by 9/23/2026
Project: Natural Surface Trail Construction Ref. #: DF26-34 Department: COUNTIES - Tooele County
State Government of Utah
Due by 9/29/2026
Project: DFCM Construction - Prequalified General Stage II - DOC - CUCF Visiting
State Government of Utah
Due by 10/22/2026