CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
| Agency: |
DEPT OF DEFENSE |
| State: |
Puerto Rico |
| Type of Government: |
Federal |
| FSC Category: |
- Z - Maintenance, Repair or Alteration of Real Property
|
| NAICS Category: |
- 237990 - Other Heavy and Civil Engineering Construction
|
| Posted Date: |
Jul 28, 2025 |
| Due Date: |
Aug 11, 2025 |
| Solicitation No: |
W51DQV25RA004 |
| Original Source: |
Please Login to View Page |
| Contact information: |
Please Login to View Page |
| Bid Documents: |
Please Login to View Page |
Description
CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W2SR ENDIST CARIBBEAN(PROVIS)
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Solicitation (Updated)
-
Updated Published Date: Jul 28, 2025 05:08 pm AST
-
Original Published Date: Apr 08, 2025 09:55 pm AST
-
Updated Date Offers Due: Aug 11, 2025 11:00 am AST
-
Original Date Offers Due: Jun 17, 2025 02:00 pm AST
-
Inactive Policy: Manual
-
Updated Inactive Date: Oct 05, 2025
-
Original Inactive Date:
Oct 05, 2025
-
Initiative:
Classification
-
Original Set Aside:
-
-
Product Service Code: Z2KB - REPAIR OR ALTERATION OF CANALS
-
NAICS Code:
-
237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918
San Juan
,
PR
00918
USA
Description
This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos� Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.
Attachments/Links
Contact Information View Changes
Contracting Office Address
-
383 FRANKLIN D ROOSEVELT AVENUE
-
SAN JUAN , PR 00918-0000
-
USA
Secondary Point of Contact
History
-
Jul 28, 2025 05:08 pm ASTSolicitation (Updated)
-
Jul 11, 2025 02:34 pm AST
Solicitation (Updated)
-
Jun 25, 2025 05:09 pm AST
Solicitation (Updated)
-
Jun 23, 2025 04:41 pm AST
Solicitation (Updated)
-
Jun 12, 2025 04:16 pm AST
Solicitation (Updated)
-
Jun 08, 2025 07:48 pm AST
Solicitation (Updated)
-
Jun 05, 2025 03:59 pm AST
Solicitation (Updated)
-
May 07, 2025 05:33 pm AST
Solicitation (Updated)
-
Apr 25, 2025 03:10 pm AST
Solicitation (Updated)
-
Apr 08, 2025 09:55 pm AST
Solicitation (Original)
Related Document
| Apr 9, 2025 | [Solicitation (Original)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION |
| Apr 25, 2025 | [Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION |
| May 7, 2025 | [Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION |
| Jun 5, 2025 | [Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION |
| Jun 8, 2025 | [Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION |
| Jun 12, 2025 | [Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION |
| Jun 23, 2025 | [Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION |
| Jun 25, 2025 | [Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION |
| Jul 11, 2025 | [Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION |
| Sep 30, 2025 | [Award Notice (Original)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION |
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Follow R e p a i r W a t e r T
VETERANS AFFAIRS, DEPARTMENT OF
Due by 9/24/2026
Follow RFQ: Purchase and Installation of Exhaust System for Bldg. 148 Dining Facility
DEPT OF DEFENSE
Due by 9/17/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.