Campus Steam Plant Boiler #1 Replacement

Agency: North Carolina State University
State: North Carolina
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: May 13, 2025
Due Date: Jun 3, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Institution NC Central University
Institution URL for Additional
Information about this Project (Optional)
Project Name Campus Steam Plant Boiler #1 Replacement
Type of Services Engineering/Architectural
Project Manager Keith Alston
Phone Number (919) 530-5324
Contact Email keithalston@nccu.edu
Closing Date 06/03/2025
Project Budget
$ 1,959,940
Project Description One-Two Sentences
North Carolina Central University (NCCU) urgently needs a new 800 HP steam boiler system. The 1800HP Steam Boiler #1, once essential for campus heating, is out of service and tagged "Discontinued Use." The campus now relies on the aging 900HP Steam Boiler #2, which is showing significant signs of wear and tear. This boiler is the only unit capable of heating all 43 buildings during fall and winter, but its reliability is questionable. A smaller 600HP Steam Boiler used for summer needs cannot handle peak loads, leaving NCCU without a reliable source of steam for heating and hot water. Any failure in the 900HP boiler could lead to significant heating issues affecting a substantial portion of the campus including several residence halls and the dining hall. Therefore, replacing the inoperable 1800HP Steam Boiler#1 is crucial to ensure a reliable and efficient heating system for the campus. A previous boiler replacement project was unsuccessfully bid, but will provide planning information to aid the current urgent effort. Project scope includes replacement of the boiler, piping, valves, condensate pumps, variable frequency drive (VFD) controls and water pumps, replacement of steel structure to support the boiler, and an economizer for Boiler #3 to assure its continued operation. The roof must be removed to provide access for the existing boiler's removal and installation of the replacement. The costs of removing and replacing the roof are included in the project.
Submit Letters of Interest
and Current SF-330 to:
(Contact Person, Name of Institution & Address)
Keith Alston Project Manager North Carolina Central University Hubbard -Totton Building, Room 118C 1801 Fayetteville Street Durham NC 27707 Office: 919-530-5324 Fax: 919-530-7948 Virtual Campus Tour: http://www.youvisit.com/tour/nccu
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Solicitation Number: 487-7th and College Street Parking Deck Project Title: ADVERTISEMENT TO BID

State Government of North Carolina

Due by 11/19/2026

Institution NC School of Science and Math Institution URL for Additional Information about

University of North Carolina System

Due by 11/17/2026

Solicitation Number: 367-OC5491 Project Title: Orange Grove Road Transit Access Sidewalk Project Description:

State Government of North Carolina

Due by 12/07/2026

Request for Qualifications: 26-0250 Middle Creek Greenway Pedestrian Hybrid Beacon The Town of

Town of Holly Springs

Due by 12/01/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.