Cameron Park Zoo Improvements - Phase 1 Island Repairs

Agency: City of Waco
State: Texas
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 238990 - All Other Specialty Trade Contractors
Posted Date: Feb 18, 2025
Due Date: Mar 19, 2025
Solicitation No: RFB 2025-013
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Project: Cameron Park Zoo Improvements - Phase 1 Island Repairs
Ref. #: RFB 2025-013
Department: Cameron Park Zoo
Type: RFB
Status:
Open
Open Date: Feb 18th 2025, 8:00 AM CST
Questions Due Date: Mar 11th 2025, 5:00 PM CDT
Contact Information: Christopher Hanchard, christopherh@wacotx.gov
Close Date: Mar 19th 2025, 2:00 PM CDT

Project Description: The City of Waco is seeking vendors for the Gibbon and Lemur Island erosion repair project at the Cameron Park Zoo. This involves grading, installation of gabion mattresses, and placement of grouted riprap to stabilize slopes and prevent future erosion. The project includes reshaping and grading the existing areas around both islands to create a stable foundation for the erosion control measures. Gabion mattresses will be installed on designated slopes with filter fabric underneath to prevent soil migration and ensure long-term stability. The mattresses will be constructed with stone-filled wire mesh baskets, properly anchored and aligned to withstand varying water levels while blending into the natural environment. Grouted riprap will be placed in areas requiring additional protection due to steeper slopes or high hydraulic forces, with detailed joint work to prevent water infiltration and erosion.
The contractor will implement erosion control measures throughout the construction process to protect the surrounding pond ecosystem and wildlife. This includes temporary silt fencing and sediment barriers to minimize runoff. Construction is expected to be completed within 90 calendar days from the notice to proceed. All work must comply with the specified grading, materials, and installation requirements, with regular inspections to ensure adherence to the project’s standards and environmental regulations. Gabion mattresses and riprap will be integrated seamlessly into the landscape to restore the islands and enhance long-term stability while preserving the zoo pond’s aesthetic and functional aspects.
(1) 30% Self Performance required by Contractor (2) Liquidated Daily Damages: $950.00


* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

bid number and title due date addenda bid status district contact 23-043CP Murchison

Pflugerville Independent School District

Bid Due: 4/05/2032

950-07-26-008 Construction Manager - General Contractor for Multiple Projects at UMC of El

University Medical Center of El Paso

Bid Due: 7/29/2026

Bid Information Type Competitive Sealed Proposal Status Issued Number 133LR-26F (Hilburn Ct, Irving

City of Irving

Bid Due: 8/21/2026

CMAR RFP - Reynolds Medical Sciences Building Level 2 HVAC Upgrade - College

State Government of Texas

Bid Due: 8/06/2026