Cameron Park Zoo Improvements - Phase 1 Island Repairs

Agency: City of Waco
State: Texas
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 238990 - All Other Specialty Trade Contractors
Posted Date: Feb 18, 2025
Due Date: Mar 19, 2025
Solicitation No: RFB 2025-013
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Project: Cameron Park Zoo Improvements - Phase 1 Island Repairs
Ref. #: RFB 2025-013
Department: Cameron Park Zoo
Type: RFB
Status:
Open
Open Date: Feb 18th 2025, 8:00 AM CST
Questions Due Date: Mar 11th 2025, 5:00 PM CDT
Contact Information: Christopher Hanchard, christopherh@wacotx.gov
Close Date: Mar 19th 2025, 2:00 PM CDT

Project Description: The City of Waco is seeking vendors for the Gibbon and Lemur Island erosion repair project at the Cameron Park Zoo. This involves grading, installation of gabion mattresses, and placement of grouted riprap to stabilize slopes and prevent future erosion. The project includes reshaping and grading the existing areas around both islands to create a stable foundation for the erosion control measures. Gabion mattresses will be installed on designated slopes with filter fabric underneath to prevent soil migration and ensure long-term stability. The mattresses will be constructed with stone-filled wire mesh baskets, properly anchored and aligned to withstand varying water levels while blending into the natural environment. Grouted riprap will be placed in areas requiring additional protection due to steeper slopes or high hydraulic forces, with detailed joint work to prevent water infiltration and erosion.
The contractor will implement erosion control measures throughout the construction process to protect the surrounding pond ecosystem and wildlife. This includes temporary silt fencing and sediment barriers to minimize runoff. Construction is expected to be completed within 90 calendar days from the notice to proceed. All work must comply with the specified grading, materials, and installation requirements, with regular inspections to ensure adherence to the project’s standards and environmental regulations. Gabion mattresses and riprap will be integrated seamlessly into the landscape to restore the islands and enhance long-term stability while preserving the zoo pond’s aesthetic and functional aspects.
(1) 30% Self Performance required by Contractor (2) Liquidated Daily Damages: $950.00


Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Energy and Water Efficiency Goods and Services (2 Part with JOC) Follow Solicitation

State Government of Texas

Due by 11/19/2026

Project: Flat Creek Reuse Project Phase 1A Ref. #: RFQ 2026-019 Department: Infrastructure

City of Waco

Due by 12/01/2026

Project: AFW Joint Reseal & Pavement Repair - Phase II Construction Ref. #:

City of Fort Worth

Due by 11/19/2026

26-004 RFCSP Porter Henderson Library Restroom Renovation Follow Solicitation Solicitation ID: 26-004RFCSP Status:

State Government of Texas

Due by 11/12/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.