Calmar 52nd Street and 52nd Ave Surface Rehab
| Agency: | Government of Alberta |
|---|---|
| State: | Alberta |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 5, 2026 |
| Due Date: | Apr 17, 2026 |
| Solicitation No: | AB-2026-02766 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Open & Competitive Opportunity
• Invitation to Bid
Amended
Open
Town of Calmar
.1 Conduct a pre‑overlay inspection with ISL and the Town of Calmar representative to identify locations requiring asphalt repairs, including potholes and crack rehabilitation.
.2 Contractor to complete asphalt repairs, including pothole repairs consisting of full‑depth removal and replacement with granular material having a maximum particle size of 50–75 mm, placed to match the existing pavement structure. The existing granular pavement structure is expected to be between 300 mm and 450 mm in depth. Granular material shall be compacted and placed on tri‑axial geogrid material and a non‑woven geotextile separator.
.3 Remove and replace existing monolithic concrete sidewalk and rolled face curb and gutter on the north side of the avenue as shown on drawings.
.4 Remove and replace existing rolled face concrete curb and gutter on the south side of the avenue as shown on drawings.
.5 Sawcut and remove a 0.5 m wide strip of asphalt adjacent to the existing lip of gutter to provide working space for curb construction and to create a smooth transition with the proposed asphalt overlay. Provide traffic accommodation to allow traffic flow and resident parking throughout the duration of construction.
.6 From the edge of the sawcut described in Clause .5, mill a 0.5 m wide strip at a depth of 50 mm (minimum) into the existing asphalt roadway to provide tie‑in to the existing asphalt and achieve a minimum 50 mm asphalt overlay thickness.
.7 Place asphalt prefill from the lip of gutter to a width of 1.0 m, filling all areas described in Clauses .5 and .6 to match the elevation of the existing asphalt.
.8 Place a minimum 50 mm asphalt overlay throughout the roadway, extending from the constructed lip of gutter on either side of the road, filling all voids, milled areas, and prefill locations.
.9 Landscape restoration adjacent to concrete works.
.10 Provide traffic accommodation to allow traffic flow and resident parking throughout the duration of construction.
b) 52nd Street:
.1 Conduct a pre‑overlay inspection with ISL and the Town of Calmar representative to identify locations requiring asphalt repairs, including potholes and crack rehabilitation.
.2 Contractor to complete asphalt repairs, including pothole repairs consisting of full‑depth removal and replacement with granular material having a maximum particle size of 50–75 mm, placed to match the existing pavement structure. The existing granular pavement structure is expected to be between 300 mm and 450 mm in depth. Granular material shall be compacted and placed on tri‑axial geogrid material and a non‑woven geotextile separator.
.3 Remove and replace monolithic existing concrete walk, rolled face curb & gutter on the east side of the street.
.4 Sawcut and removal of the west existing concrete walk, rolled face curb & gutter and replace with rolled face concrete curb and gutter.
.5 Sawcut and remove a 0.5 m wide strip of asphalt adjacent to the existing lip of gutter to provide working space for curb construction and to create a smooth transition with the proposed asphalt overlay. Provide traffic accommodation to allow traffic flow and resident parking throughout the duration of construction.
.6 From the edge of the sawcut described in Clause .5, mill a 0.5 m wide strip at a depth of 50 mm (minimum) into the existing asphalt roadway to provide tie‑in to the existing asphalt and achieve a minimum 50 mm asphalt overlay thickness.
.7 Place asphalt prefill from the lip of gutter to a width of 1.0 m, filling all areas described in Clauses .5 and .6 to match the elevation of the existing asphalt.
.8 Place a minimum 50 mm asphalt overlay throughout the roadway, extending from the constructed lip of gutter on either side of the road, filling all voids, milled areas, and prefill locations.
.9 Landscape restoration adjacent to concrete works.
.10 Provide traffic accommodation to allow traffic flow and resident parking throughout the duration of construction.
APC Reference #
AB-2026-02766
Category
Construction
Posting Date • Time
Apr 2, 2026 • 8:45 pm (MT)
Closing Date • Time
Apr 17, 2026 • 2:00:00 pm (MT)
Region(s) of Delivery
Alberta, Calmar
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Basic Information APC Reference # AB-2026-06354 Internal Reference # 26.0120 Title RFQ#: 26.0120
Government of Alberta
Due by 10/15/2026
Basic Information APC Reference # AB-2026-06493 Internal Reference # COL-26-099 Title Parking Lot
Government of Alberta
Due by 10/21/2026
Basic Information APC Reference # AB-2026-06307 Internal Reference # 1139 Title TFCC Loading
Government of Alberta
Due by 10/13/2026
Basic Information APC Reference # AB-2026-06398 Internal Reference # Plan No: 024180 Title
Government of Alberta
Due by 10/01/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.