Cable Carrier Replacement
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Georgia |
| Type of Government: | Federal |
| FSC Category: |
|
| Posted Date: | Dec 5, 2024 |
| Due Date: | Jan 7, 2025 |
| Solicitation No: | 76157 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Dec 05, 2024 10:13 am EST
- Original Response Date: Jan 07, 2025 02:00 pm EST
- Inactive Policy: 15 days after response date
- Original Inactive Date: Jan 22, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code:
- NAICS Code:
-
Place of Performance:
Warner Robins , GA 31098USA
The Government is conducting market research to identify potential sources that may possess the expertise, capabilities, and experience to provide all materials, tools, and equipment needed for the removal, disposal and installation services of the plating line cable carrier system replacement. The old plastic Energy Chain (E-Chain) cable carrier system shall be replaced with the new E-Chain and 316 stainless steel trough for a total of up to eight (8) plating lines located in building 20128, for the 402nd Commodities Maintenance Group (CMXG), Robins Air Force Base, Georgia. Each plating line has two (2) overhead hoists in which each hoist has a cable carrier. This is a build to print acquisition with service (installation) incidentals. This requirement is for a one (1) year basic contract plus three (3) one (1) year exercisable option periods. The estimated quantities will be for a total of up to eight (8) plating lines, two (2) each year until all eight (8) are complete.
This requirement will replace the cable carrier for each hoist along each of the plating lines. The cable carrier is an essential piece of the hoist operation to prevent damage to cables and provide a smooth transition of the hoist up and down the plating line. The plating line cable carrier provides coatings that protect aircraft from corrosion and premature failure. Currently, the cable carrier is made of thin plastic material not specifically designed for the corrosive environment in which it is exposed. The new cable carrier system shall have a more robust, durable, thicker material that can handle the day-to-day exposure to the corrosive environment along with normal usage on each plating line. The requirement will include all new cables, 316 stainless steel track in which the carrier will sit in, cable separators within the carrier, tow arm that hooks to the hoist strain relief clamps and installation. This requirement shall be IAW attached PWS, Line 1 Hoist 1 Drawing, Line 1 Hoist 2 Drawing, Lines 2-4 Hoist 1 Drawing, and Hoist Structure Layout Drawing for this requirement.
- CP 478 926 7509 235 PERRY ST BLDG 255
- ROBINS AFB , GA 31098-1672
- USA
- Nicole Mitchell
- brandi.mitchell@us.af.mil
- Phone Number 4789260617
- Claudette Macneil
- claudette.macneil@us.af.mil
- Dec 05, 2024 10:13 am ESTSources Sought (Original)
See Also
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66751-NONST-2027-000000106
State Government of Georgia
Due by 10/01/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66992-NONST-2027-000000033
State Government of Georgia
Due by 9/25/2026
Follow FY27 SAD EOC Renovations and Upgrades Active Contract Opportunity Notice ID W912HP27BA0001
DEPT OF DEFENSE
Due by 9/30/2026
SOLICITATION DESCRIPTION DUE DATE RFB No. 27-0011 Tennis Court Resurfacing at Lakebottom Park
Consolidated Government of Columbus
Due by 10/07/2026