CA NP MOJA 11(2) 10(2) Kelso-Cima and Kelbaker Roads

Agency: TRANSPORTATION, DEPARTMENT OF
State: California
Type of Government: Federal
FSC Category:
  • Y - Construction of Structures and Facilities
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
Posted Date: Jul 23, 2025
Due Date: Aug 7, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Follow
CA NP MOJA 11(2) 10(2) Kelso-Cima and Kelbaker Roads
Active
Contract Opportunity
Notice ID
Related Notice
Department/Ind. Agency
TRANSPORTATION, DEPARTMENT OF
Sub-tier
FEDERAL HIGHWAY ADMINISTRATION
General Information View Changes
  • Contract Opportunity Type: Special Notice (Updated)
  • Updated Published Date: Jul 23, 2025 03:05 pm MDT
  • Original Published Date: Jul 23, 2025 02:45 pm MDT
  • Updated Response Date: Aug 07, 2025 02:00 pm MDT
  • Original Response Date: Aug 07, 2025 02:00 pm MDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Sep 30, 2025
  • Original Inactive Date: Sep 30, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Cima , CA
    USA
Description View Changes

See attached pdf.



CA NP MOJA 11(2) 10(2) Kelso-Cima and Kelbaker Roads



THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.



SPECIAL NOTICE TO PROSPECTIVE OFFERORS regarding CA NP MOJA 11(2) 10(2) Kelso-Cima and Kelbaker Road project, Sources Sought Notice 6982AF-25-SS-0025. Interested businesses must submit responses to the below questions by e-mail to CFLAcquisitions@dot.gov (Attn: Jorey Deml) for receipt by close of business (2 p.m. local Denver time) on August 7, 2025:




  1. Will your firm bid this project if it uses a Project Labor Agreement?

  2. If so, how much will your bid increase in terms of percent (estimated), due to the use of a Project Labor Agreement?



PROJECT NUMBER: CA NP MOJA 11(2) 10(2)



PROJECT NAME: Kelso-Cima and Kelbaker Roads



PROJECT DESCRIPTION:



The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 56.5 miles of roads within Mojave National Preserve in San Bernardino County, CA to improve safety and visitor access. Improvements primarily include resurfacing, restoration, and rehabilitation, and work is included on the entire 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road.





SCOPE OF THE WORK:



The Kelso-Cima and South Kelbaker Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment (reconstruction) in select areas, reinforcing 48 low water crossings (11 on South Kelbaker Road and 37 on Kelso-Cima Road), and improving safety with longitudinal and transverse mumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with riprap revetment.



The Morningstar Mine Road improvements consist of full depth reclamation of the existing pavement and placement of surface-course aggregate. Work also includes realignment of Kelso-Cima Road at the Cima Road/Morningstar Mine Road intersection,



The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude is required.



Principle work items include:



110,000 tons of asphalt concrete pavement,



133,000 tons of roadway aggregate,



81,000 tons of aggregate surface course,



110,000 cubic yards of roadway excavation,



49 miles of full depth reclamation, method 2, 6-inch depth,



17,000 linear feet of concrete barrier (low water crossings),



44 miles of fence, tortoise barrier,



2,400 linear feet of tortoise crossing structure, and



12,000 cubic yards of rip rap



ANTICIPATED SCHEDULE:



Advertisement – Fall 2025



Construction – Early 2026, duration 24 to 30 months





ESTIMATED COST RANGE:



Between $80,000,000 and $120,000,000


Attachments/Links
Contact Information
Contracting Office Address
  • US
Primary Point of Contact
Secondary Point of Contact


History
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Project ID: 4711 Title: Kiefer Landfill- Module 5, Phase 1 Liner Construction Addenda:

Sacramento County

Due by 10/08/2026

Basic Information Title ASI Wellness Initiative, Project No: FL-2673 Agency CSU, Fullerton Department

State Government of California

Due by 10/30/2026

Project Summary Project ID: BRC0000673 Project Name: Construction Manager at Risk Pre-Construction and

La County

Due by 10/13/2026

Bid Solicitation # ANE127-AE-6504 Bid Solicitation # ANE127-AE-6504 Organization Name Architecture and Engineering

County of San Bernardino

Due by 10/01/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.