C1NB--INCREASE CHILLED WATER CAPACITY AE Services
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
|---|---|
| State: | North Carolina |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Feb 24, 2025 |
| Due Date: | Mar 5, 2025 |
| Solicitation No: | 36C24625R0031 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Feb 24, 2025 04:09 pm EST
- Original Response Date: Mar 05, 2025 03:00 pm EST
- Inactive Policy: Manual
- Original Inactive Date: Jun 12, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: C1NB - ARCHITECT AND ENGINEERING- CONSTRUCTION: HEATING AND COOLING PLANTS
-
NAICS Code:
- 541330 - Engineering Services
-
Place of Performance:
Department of Veterans Affairs Fayetteville VA Medical Center Fayetteville , NC 28601USA
The Department of Veterans Affairs, Network Contracting Office 6 is conducting market research to identify potential sources for Architect-Engineer services to complete the below scope of work.
The place of performance will be the hospital campus of the Fayetteville VA Medical Center in Fayetteville, North Carolina. Forward all questions to the point of contact identified below. This is not a pre-solicitation notice. The magnitude of construction for this project is currently between $2,000,000 and $5,000,000 but is subject to revision prior to release of a solicitation.
The proposed NAICS 541330 Engineering Services is applicable to this acquisition with a size standard of $25.5 Million.
The proposed PSC code is C1NB Architect and Engineering Construction: Heating and Cooling Plants.
The anticipated Period of Performance is 741 calendar days from the Notice to Proceed.
Scope of Work:
Provide professional engineering services to perform planning, investigations, surveys, reports, consultations, site visits, design work, preparation of contract drawings and specifications, preparation of construction cost estimates, construction schedule and provision of construction period services as necessary for all demolition, modification, construction, inspection, testing and certification for all construction components for project 565-25-153, Increase Chilled Water Capacity, at Fayetteville VA Medical Center, Fayetteville, NC.
The intent of this project is to work under review authority of the VAMC Staff to accomplish a detailed investigation and survey of the existing Chilled Water Plant and capacity, to design and prepare a set of complete construction documents for all architectural, structural, civil, mechanical, plumbing, electrical, life safety and other applicable components of this project. The design is to provide an increase of 1000-ton Chilled Water capacity at/to the Medical Center.
The design team shall develop three alternatives for Chilled Water expansion, each with a different approach to increase capacity. The Design Team must evaluate the pros and cons of each design in terms of cost, efficiency, feasibility of implementation, and integration challenges into the existing system and Facility.
Design shall address options in the concept phase as well as physical placement on the facility to both provide the additional capacity to meet the facilities needs as well as to minimize operational interference during the construction.
Concept Design Submission 21 calendar days from NTP
VA Concept Design Review 14 calendar days from Concept Design Submission
35% Schematic Design Submission 30 calendar days from Concept Design Review
VA 35% Schematic Design Review 14 calendar days from 35% Design Submission
65% Design Development Submission 45 calendar days from 35% Design Review
VA 65% Design Development Review 14 calendar days from 65% Design Submission
95% Design Development Submission 30 calendar days from 65% Design Review
VA 95% Design Development Review 14 calendar days from 95% Design Submission
100% Final Design Submission 14 calendar days from 95% Design Review
Total calendar days from Notice to Proceed to 100% Final Design Submission: 196 days.
Procurement timeframe: 180 days from the time Engineering submits package to contracting. During this timeframe, designer shall answer pre-bid RFIs and provide updated construction documents to capture any changes made through the procurement process.
Construction period services: 365 calendar days from construction award date
Total contract period: 741 calendar days
Small Business Requirements
For market research purposes, all responses to this notice will be reviewed, regardless of small business/socioeconomic category, including those firms that are identified as large businesses. Review of responses to this notice will support later determination of set-aside requirements, if a solicitation becomes available, where the rule of two is met regarding a set-aside, including set-asides under 38 U.S.C. 8127 and 8128 for SDVOSB and/or VOSB firms registered in the SBA VetCert database, in accordance with priorities set by regulation.
All interested parties should respond, in writing via email to the contract specialist, Elaine Belber, elaine.belber@va.gov. No telephone inquiries will be accepted. Your response is requested by Wednesday, March 5, 2025 at 3:00 PM EST. In your response, please include the following:
Company name
Address
Point of contact with email and phone number
SAM Unique Entry ID number and evidence of current SAM registration (see https://www.sam.gov for more information)
Company Socio-Economic SIZE (example large, small, SDVOSB, VOSB, WOSB etc.)
Proposed NAICS code (if different from above)
Proposed PSC code (if different from above)
Capabilities statement, to include experience with contracts of similar scope and magnitude.
Is the anticipated period of performance appropriate for this project?
Would a required site visit prior to providing a fee proposal deter you from responding to this requirement?
Is there anything that would deter you from responding to this requirement?
- 100 EMANCIPATION DR
- HAMPTON , VA 23667
- USA
- Elaine Belber
- Elaine.Belber@va.gov
- Phone Number No telephone inquiries will be accepted.
- Feb 24, 2025 04:09 pm ESTSources Sought (Original)
Related Document
| Mar 20, 2025 | [Presolicitation (Original)] C1NB--INCREASE CHILLED WATER CAPACITY AE Project 565-25-153 |
| Apr 2, 2025 | [Presolicitation (Updated)] C1NB--INCREASE CHILLED WATER CAPACITY AE Project 565-25-153 |
| Apr 3, 2025 | [Presolicitation (Updated)] C1NB--INCREASE CHILLED WATER CAPACITY AE Project 565-25-153 |
| Aug 27, 2025 | [Presolicitation (Updated)] C1NB--INCREASE CHILLED WATER CAPACITY AE Project 565-25-153 |
| Oct 28, 2025 | [Award Notice (Original)] C1NB--INCREASE CHILLED WATER CAPACITY AE Project #565-25-153 |
See Also
DN12239359 (WBS GMR14.HEN.1P, ETC) POC DN12239359 (WBS GMR14.HEN.1P, ETC) ID/IQ Pipe Rehabilitation -
Division of Highways
Due by 10/13/2026
DN12239359 (WBS GMR14.HEN.1P, ETC) POC DN12239359 (WBS GMR14.HEN.1P, ETC) ID/IQ Pipe Rehabilitation -
Division of Highways
Due by 10/13/2026
Bid Title: Town of Apex Request for Qualifications UV Disinfection Replacment Category: Professional
Town of Apex
Due by 11/19/2026
Solicitation Number: 274-2026-Northern-BRT Project Title: Wake BRT: Northern Corridors Design & NEPA Study
State Government of North Carolina
Due by 11/06/2026