Buffalo Creek Work Center Office & Engine Storage Additions
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Colorado |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | May 22, 2025 |
| Due Date: | Jun 24, 2025 |
| Solicitation No: | 1282B125R0021 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: May 22, 2025 10:16 am CDT
- Original Published Date: May 20, 2025 02:27 pm CDT
- Updated Date Offers Due: Jun 24, 2025 10:00 am CDT
- Original Date Offers Due: Jun 24, 2025 10:00 am CDT
- Inactive Policy: Manual
- Updated Inactive Date: Jul 25, 2025
- Original Inactive Date: Jul 25, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2AA - REPAIR OR ALTERATION OF OFFICE BUILDINGS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Buffalo Creek , CO 80425USA
May 22, 2025: Due to the large file size of Attachment 7 - Drawings 5 of 7 Elec, the file was not able to be opened by some contractors. To resolve this issue, this attachment has been reduced in size and separated into two files. They are now uploaded in the Attachment/Links as "Reduced_ Attach 7a- Drawings 5 of 7 Elec" and "Reduced_Attach 7b - Drawings 5 of 7 Elec". Please use these two reduced files (Reduced _Attach 7a and Reduced_Attach 7b) instead of the initial Attach 7 -Drawings 5 of 7 Elec. Also, Attachment 12 - A and E Report BCWC has been reduced in size so that it may be opened without issues. This is still one attachment; however, it has been reduced in file size. It has also been uploaded to the Attachment/Links and can be found as "Reduced_Attach 12 - A and E Report BCWC". Please use this document instead of the initial document, Attach 12 - A and E Report BCWC. All information remained the same in the reduced attachments. Should you have questions, contact both of the following via email: Janice King at janice.king@usda.gov and Lucas Dahlman at lucas.dahlman@usda.gov.
PROJECT: BUFFALO CREEK WORK CENTER OFFICE & ENGINE STORAGE ADDITIONS
**SEE THE SOLICITATION and ATTACHMENTS in the ATTACHMENTS/LINKS for more details and the SITE VISIT***
(Due to file size, the Drawings have been included as Attachments 3 - 9 and the Specifications as Attachments 10a -10 i).
An asset of the Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands (PSICC) South Platte Ranger District (RD), the Buffalo Creek Work Center was built in 1938 by the Works Projects Administration and is located at 18046 County Road 126, Buffalo Creek, CO 80425. The Work Center of roughly 3½ acres hosts several structures, including, but not limited to, the Office, Garage/Shop, and Dwelling constructed in 1938, and the Barracks and Engine Storage constructed in 2002, as well as several other miscellaneous structures and utility features. Like many historical buildings of this age, the office is very inefficient in terms of energy consumption and space utilization. Under this contract new office space and an additional engine bay space will be constructed as an addition to the existing Engine Storage building. Work in the base items includes mobilization; quality control; construction staking and layout; construction of site utilities for water, sewer, natural gas, power and telecommunications; final site grading; parking area construction; demolition of existing site features and utilities; and foundation, building, and mechanical/electrical/plumbing systems construction.
Incidental work includes submittals for quality control; submittals for safety and accident prevention; coordination with local utility companies; submittals for products and shop drawings; the construction schedule; construction waste management; operation and maintenance manuals, as well as system demonstration and training.
- SPOC Intermountain 1400 INDEPENDENCE AVE SW, MS-1138
- Washington , DC 202500001
- USA
- Janice King\
- janice.king@usda.gov
- Lucas Dahlman
- lucas.dahlman@usda.gov
- May 22, 2025 10:16 am CDTSolicitation (Updated)
- May 20, 2025 02:27 pm CDT Solicitation (Original)
- May 05, 2025 08:16 am CDT Presolicitation (Original)
Related Document
| May 20, 2025 | [Solicitation (Original)] Buffalo Creek Work Center Office & Engine Storage Additions |
| Jun 23, 2025 | [Solicitation (Updated)] Buffalo Creek Work Center Office & Engine Storage Additions |
| Jun 24, 2025 | [Solicitation (Updated)] Buffalo Creek Work Center Office & Engine Storage Additions |
| Jun 26, 2025 | [Solicitation (Updated)] Buffalo Creek Work Center Office & Engine Storage Additions |
| Jul 14, 2025 | [Solicitation (Updated)] Buffalo Creek Work Center Office & Engine Storage Additions |
See Also
General Information Document ID IFB1-CAAA-2027000018-1 Status Open Description CTF FCF Grease Interceptor IFB1
State Government of Colorado
Due by 10/01/2026
Description: C27DM4 - CMGC Pre-Const Services: SpCk Dam Rehab Proj Department: DNR -
State Government of Colorado
Due by 6/30/2027
Follow Z1DA--554-26-106 Replace DW Valves. Active Contract Opportunity Notice ID 36C25926R0057 Related Notice
VETERANS AFFAIRS, DEPARTMENT OF
Due by 9/30/2026
Project ID: 26-055 Title: Roadway and Signalization Improvements - State Highway 45A (Pueblo
City of pueblo
Due by 10/14/2026