Buffalo Creek Boiler Replacement
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Colorado |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Mar 11, 2026 |
| Due Date: | Mar 13, 2026 |
| Solicitation No: | 1240LT26C0020 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Mar 11, 2026 09:04 am CDT
- Original Published Date: Feb 11, 2026 11:38 am CST
- Updated Date Offers Due: Mar 13, 2026 12:00 pm CDT
- Original Date Offers Due: Mar 13, 2026 12:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Mar 28, 2026
- Original Inactive Date: Mar 28, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Pine , CO 80470USA
Project: Buffalo Creek Boiler Replacement
POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov
for the replacement of one boiler as outline in attachment 3 Statement of Work (SOW). A- Propane Gas-Fire Boiler - The work shall consist of supplying and installing (1) high efficiency propane gas-fired boiler approved equivalent to the Dunkirk Quantum 90, Q90-200, see attached specifications Attachment 05, at the Buffalo Creek Work Center. Work shall also include the furnishment/installation of any/all plumbing/electrical/expansion tanks/new solenoids/water lines/regulators/miscellaneous components needed for a successful installation. B- Backflow Preventer Replacement – Replace one (1) Caleffi 573012A ½” 573 Backflow Preventer and AutoFill Combination with Pressure Gauge, and one two-way ball valve. C. F- m Water Line Replacement – Replace approximately 5 feet of 1” copper water line, approximately 6 feet of ¾” copper water line, and approximately 3 feet of ½” copper waterline D-Electrical Panel Upgrade – Convert the two (2) outdated electrical panels, located in the entry stairway and attic, respectively, with junction boxes and extend circuits to one (1) new electrical panel. Ensure all new work is appropriately grounded. F-Mold Remediation - Water damage mitigation of the boiler room. Includes temporary removal of plumbing system as necessary, tearing out contaminated plywood and wet insulation, cleaning stud walls, walls, and ceiling, performing detailed HEPA vacuuming, and applying a plant-based antimicrobial agent. F- Boiler Room Interior Reconstruction - The reconstruction phase includes restoring the boiler room and surrounding areas after mitigation.
Magnitude of Construction is between $25,000 and $100,000
Site Visit:
P.O.C. Name: Corey Lewenkamp
Address: 18046 CO RD 126 Pine CO, 80470
Date and Time: February 25, 2026, 1:00 PM Mountain
Telephone: 719-744-7196
P.O.C. Email: corey.lewenkamp@usda.gov
Attachment 1 Solicitation Terms and Conditions
Attachment 2 SOI
Attachment 3 SOW
Attachment 4 BCWC Dwelling Mech & Elec Systems Info
Attachment 5- Product Specs
Attachment 6- Wage Determination
Questions shall be submitted via email to Erick Plamann, Contract Specialist at erick.plamann@usda.gov no later than March 4, 2026, at 12:00 PM Central Time.
Quotes shall be submitted via email to Erick Plamann, Contract Specialist at erick.plamann@usda.gov no later than 12:00 p.m. Central Time on March 13, 2026.
- PIKE SAN ISABEL NATIONAL FOREST 2840 KACHINA DRIVE
- PUEBLO , CO 81008
- USA
- Erick Plamann
- erick.plamann@usda.gov
- Lucas Dahlman
- lucas.dahlman@usda.gov
- Mar 11, 2026 09:04 am CDTCombined Synopsis/Solicitation (Updated)
- Mar 04, 2026 01:17 pm CST Combined Synopsis/Solicitation (Updated)
- Feb 11, 2026 11:47 am CST Combined Synopsis/Solicitation (Updated)
- Feb 11, 2026 11:38 am CST Combined Synopsis/Solicitation (Original)
Related Document
| Feb 11, 2026 | [Combined Synopsis/Solicitation (Updated)] Buffalo Creek Boiler Replacement |
| Mar 4, 2026 | [Combined Synopsis/Solicitation (Updated)] Buffalo Creek Boiler Replacement |
| May 13, 2026 | [Award Notice (Original)] Bridgeport Warehouse Snow Damage Repair and Mitigation |
See Also
Name Solicitation Transit On-Call Fire Suppression System Services R26-065PB
City of Colorado Springs
Due by 9/25/2026
2026 Contract Street Maintenance Mill and Overlays IFB-5976-26-DD Responses Due September 21, 2026,
City of Grand Junction
Due by 9/21/2026
Follow ESS Alarms MX and Repair Active Contract Opportunity Notice ID FA251726QB014 Related
DEPT OF DEFENSE
Due by 10/02/2026
Solicitation number Status Due Description Attachments 263-26 Active 9/15/2026 11:00 PM Traffic Signal
City of Thornton
Due by 9/15/2026