Buckley SFB Chiller Replacement

Agency: DEPT OF DEFENSE
State: Colorado
Type of Government: Federal
FSC Category:
  • N - Installation of Equipment
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Set Aside: Total Small Business Set-Aside (FAR 19.5)
Posted Date: Jul 14, 2026
Due Date: Jul 22, 2026
Solicitation No: BuckleySFBChillerReplacement
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Follow
Buckley SFB Chiller Replacement
Active
Contract Opportunity
Notice ID
BuckleySFBChillerReplacement
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Office
FA2543 460 CONS
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • Original Published Date: Jul 14, 2026 10:18 am MDT
  • Original Response Date: Jul 22, 2026 01:00 pm MDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Aug 06, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: N041 - INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
  • NAICS Code:
    • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • Place of Performance:
    Aurora , CO 80011
    USA
Description

PLEASE SEE ATTACHMENTS FOR ADDITIONAL INFORMATION REGARDING THIS REQUIREMENT



Notice Type: Sources Sought (MARKET RESEARCH PURPOSES ONLY)

Title: Secure Facility Chilled Water System Replacement – Federal Installation, CO

NAICS Code: 238220 – Plumbing, Heating, and Air-Conditioning Contractors

Product Service Code (PSC): N041 – Installation of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment

Response Date: 22 July 2026



Description:



The Department of the Air Force (DAF), on behalf of the Base Civil Engineer Squadron (CES) at a Federal Installation in Colorado, is conducting market research to identify qualified, experienced, and interested business sources—specifically targeting small and socio-economic businesses (e.g., 8(a), SDVOSB, HUBZone, WOSB)—capable of performing a complete chilled water system replacement in a 24/7 operations facility.



Project Objective: The chilled water system serving the facility's server room currently suffers from degraded serviceability, sub-component failures, and frequent downtime. It is operating at half capacity, which risks the loss of critical cooling for 24/7 operations. The selected contractor must provide all tools, equipment, materials, and certified labor to perform a complete system replacement with zero downtime to the active server room.



Key Scope Items & Technical Specifications:





  1. Design & Sizing: Perform professional engineering cooling system design load calculations in accordance with UFC 3-410-01 (Sections 2-4 and 2-5.6) to determine final system capacity.




  2. Standardization Requirement: In accordance with the DAF Class Justification and Approval (J&A) for HVAC Chiller Replacement Standardization, the design of the new chiller system must be standardized on Trane-series equipment for this installation.




  3. Demolition: Safely decommission, recover refrigerant from, and remove the existing degraded chiller (Technical Systems Model: 30A0LM20-PT, Serial: 02-17-125822-001-001) and two existing Computer Room Air Handlers (CRAHs) (Data Aire Model: GFCU-04634, Serials: 2016-3226-A, 20163225-A).




  4. Equipment Installation: Procure, install, and commission:





    • One (1) new water chiller with an integrated air-cooled condenser (Trane-series).




    • Two (2) new chilled-water Computer Room Air Handlers (CRAHs) inside the secure server room.






  5. Temporary Cooling: Provide continuous, redundant temporary cooling to keep the secure server room strictly within operational temperature limits during the transition phase.




  6. Controls Integration: Fully integrate new controls into the base-wide Energy Management Control System (EMCS) in strict compliance with Base EMCS Standards (dated January 21, 2026) and UFC 3-410-02.





Logistical & Physical Constraints:





  • Chiller Pad Limits: The new chiller must fit the existing concrete pad (19’ - 11” L x 12’- 8” W x 6” to 8” H) and must not exceed the structural wet weight limit of 12,000 lbs. If the equipment footprint exceeds these limits, the pad must be extended.




  • Rigging & Delivery Clearances: CRAHs must be navigated through a restricted interior corridor with doorway clearances measuring exactly 34” W x 82” H.




  • Electrical: Must integrate with the existing 460V, 60 Hz, 3-Phase power supply and comply with UFC 3-501-01.




  • Security & Clearances: All personnel must pass NCIC background checks, comply with strict OPSEC guidelines, and complete AT Level I training prior to facility access.




Attachments/Links
Contact Information
Contracting Office Address
  • ADMIN ONLY NO REQTN CP 720 847 6437 510 S ASPEN ST BLDG 1030 RM 120D
  • BUCKLEY AFB , CO 80011-9572
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Jul 14, 2026 10:18 am MDTSources Sought (Original)
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Solicitation number Status Due Description Attachments 260-26C Active 8/14/2026 4:30 PM Police Vehicle

City of Thornton

Bid Due: 8/14/2026

General Information Document ID RFQ1-AAHA-2027000003-3 Status Amended Description 2026-045M25/ Capitol Heat Pumps Replacement

State Government of Colorado

Bid Due: 8/07/2026

Follow B1-2118A Radon Mitigation System Active Contract Opportunity Notice ID NB1940002602387 Related Notice

COMMERCE, DEPARTMENT OF

Bid Due: 8/07/2026

Solicitation number Status Due Description Attachments 260-26C Active 8/14/2026 4:30 PM Police Vehicle

City of Thornton

Bid Due: 8/14/2026