| Agency: | State Government of Vermont |
|---|---|
| State: | Vermont |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 20, 2026 |
| Due Date: | May 12, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
|
Bid Type: Job Contract Locations: Lamoille Keywords: Construction (Non Building), Culvert Replacement, Stream Restoration Bid Description: The Vermont Natural Resources Council (VNRC) in collaboration with Smugglers’ Notch Resort (SNR) is requesting bids from qualified contractors for the removal of two (2) dams within the Brewster River Watershed on SNR property in Cambridge, VT. The Morses Mill Dam Removal project consists of the full removal of a 30-foot-wide timber crib dam on the Brewster River located between Rt. 108 and Desjardin Road. In addition, the adjacent floodplain will be re-graded and stabilized to provide floodplain access during storm events. The SNR Access Dam Removal project consists of the removal of a concrete weir outlet structure and associated three (3) 24-inch corrugated metal pipes (CMP) under the access road and the installation of a 12-foot wide by 8-foot tall concrete box culvert. In addition, the existing pond footprint shall be filled (average of 2-3 feet) and a stream channel and connected floodplain shall be restored. Bidders may choose to provide a bid on one or both dam removal projects. To request the construction drawings prepared by Fitzgerald Environmental Associates (FEA) reach out to Jordan Duffy at jordan@feavt.com.
|
||||||||||||||||||||||
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Mil Dept - Biathlon Complex Improvements Request Date: 7/10/2026 3:18:42 PM Open Date:
State Government of Vermont
Bid Due: 8/18/2026
Broad Brook Road Slope Stabilization and Road Reconstruction Request Date: 7/1/2026 2:15:27 PM
State Government of Vermont
Bid Due: 8/07/2026
Kennedy Drive Pond 7 Stormwater Improvements Construction Request Date: 7/22/2026 2:54:49 PM Open
State Government of Vermont
Bid Due: 8/28/2026
NRCS EWP Bank Stabilization Project Request Date: 7/23/2026 9:17:01 AM Open Date: 7/23/2026
State Government of Vermont
Bid Due: 8/17/2026