| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | California |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | May 15, 2026 |
| Due Date: | Jun 9, 2026 |
| Solicitation No: | NAVMWR-26-R-0038 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility.
The Work includes, but not limited to:
1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer’s Representative (COR).
2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements.
3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging,
delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work.
Additional information provided in attached RFP.
| May 7, 2026 | [Solicitation (Original)] BOWLING CENTER AND F&B UPGRADES |
| Jun 1, 2026 | [Solicitation (Updated)] BOWLING CENTER AND F&B UPGRADES |
| Jun 11, 2026 | [Solicitation (Updated)] BOWLING CENTER AND F&B UPGRADES |
| Jun 16, 2026 | [Solicitation (Updated)] BOWLING CENTER AND F&B UPGRADES |
| Jun 23, 2026 | [Solicitation (Updated)] BOWLING CENTER AND F&B UPGRADES |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
BN-2605-04 FY 24-25 Street Rehab & BN-2605-05 FY 25-26 Sidewalk Project (5/13/2026) 2
City of Lawndale
Follow REPAIR FUEL FACILITIES AND REPLACE OWS, AT NAVAL BASE CORONADO (NBC), SAN
DEPT OF DEFENSE
Bid Due: 7/30/2026
Bid Number: 2026_WTR_002 Bid Title: 1ST AVENUE WATER LINE REPLACEMENT PROJECT Category: Engineering
City of Delano
Bid Due: 8/06/2026
Follow REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG), BASE TONGUE
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 7/31/2026