Boiler Replacement at the Municipal Building

Agency: PennBid
State: Pennsylvania
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Aug 27, 2025
Due Date: Sep 16, 2025
Solicitation No: Stroud Township, Monroe County
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Project: Boiler Replacement at the Municipal Building
Ref. #: Stroud Township, Monroe County
Type: IFB
Status:
Open
Open Date: Aug 27th 2025, 8:00 AM EDT
Questions Due Date: Sep 9th 2025, 4:00 PM EDT
Close Date: Sep 16th 2025, 4:00 PM EDT
Contract Type:
Fixed Fee Contract
County, State:
Monroe County, PA

Project Description: Sealed bids will be publicly opened and read by the Board of Supervisors of Stroud Township at its regular meeting scheduled to be held at the Stroud Township Municipal Center, 1211 North Fifth Street, Stroudsburg, PA 18360, on Tuesday, September 16, 2025, at 7 PM, to consider proposals for the purchase of the following, to wit:
Boiler Replacement at the Municipal Building located at 1211 N. 5th St, Stroudsburg, PA 18360. Demolition includes removing the three boilers and their controls, removing hydronic piping that is between the boilers and the zone pumps on the supply side, and removing the hot water return header. The zone pumps will remain, and the concrete pad may remain and be increased to accommodate the new boiler size. Gas piping will remain but may need minor modifications. The existing flue will be removed. The new work includes providing three Weil McClain Slimfit condensing boilers model SF750. These boilers are chosen because of their short design; they will fit into the existing boiler room that does not have a high ceiling. Each boiler will be vented to the exterior with 8’’ vents that should rise to the roof in the existing boiler chimney. The vent material shall be PVC, CPVC, PP, or AL29-4C. The new boilers shall come with a new control system that automatically operates the boilers and provides cascading loading and shall equalize run time per boiler. New boiler circulator pumps will be provided per boiler. New emergency shut off switches will be provided next to each exit door in the boiler room. Condensate neutralizers shall be provided to treat the acidic condensate from the boilers. Provide a new floor drain near the boilers that will tie into existing sanitary serving the adjacent bathroom. Boiler condensate shall spill into this floor drain. New supply piping headers to be provided and taps provided to connect to existing zone pumps. New return piping headers to be provided and taps provided connect into existing return branch piping. Insulate all heating-water piping according to the chart in public notice and design report attachments, where the size on the top row is pipe size and the size on the bottom row is the insulation thickness.
Miscellaneous improvements include replacement of baseboard radiator in clerical office for increased heat. Repair or replacement of a rooftop unit that contains a duct hot water coil. Hot water flowing through this valve when the unit is not calling for heat. It is possible there is a leaky valve. Address any leaks or failing heaters in basement garage space.
All bids must be received electronically via PennBid at https://pennbid.bonfirehub.com/ by 4 PM, prevailing time, on Tuesday, September 16, 2025. Bid Documents can be obtained at no cost on PennBid. A Certificate of Insurance shall accompany all bids. All bids shall be accompanied by a proposal security in the amount of ten (10%) percent of the total bid, in the form of a certified check, bank cashier’s check, or satisfactory bid bond, naming as payee the Township of Stroud. The successful bidder shall furnish a performance bond in the amount of one hundred percent (100%) of the amount bid, naming as the payee the Township of Stroud. No bid or proposal may be withdrawn for a period of sixty (60) days after the date above specified for receiving, opening, and reading of bids.
A Pre-Bid inspection of the building will be held Wednesday September 10th at 1211 N, 5th St Stroudsburg, PA 18360 at 10.00am for anyone who wants to attend.
The Stroud Township Board of Supervisors reserves the right to reject any and/or all proposals deemed to be in the best interest of the Township, and to waive any defects or irregularities in the proposals. The Board reserves the right to award the contract to the lowest responsible bidder.


Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

ABK Daycare (Envision Center) Emergency Egress Project IFB#600-22-26 OPEN The Housing Authority of

Housing Authority of the City of Pittsburgh

Due by 9/30/2026

Follow JP Martha Float Mooring Bitts Retrofit Active Contract Opportunity Notice ID W911WN26CA015

DEPT OF DEFENSE

Project: RFB for Partial Superstructure Replacement, County Bridge 38, T-538 (Comfort Road) over

PennBid

Due by 10/06/2026

ABK Daycare (Envision Center) Emergency Egress Project IFB#600-22-26 OPEN The Housing Authority of

Housing Authority of the City of Pittsburgh

Due by 9/30/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.