| Agency: | Johnson County Kansas |
|---|---|
| State: | Kansas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jan 23, 2025 |
| Due Date: | Feb 27, 2025 |
| Solicitation No: | 2025-001 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Bid Information
| Type | Invitation for Bid |
| Status | Issued |
| Number | 2025-001 (Blue River Main WWTF Phase 2 Improvements) |
| Issue Date & Time | 1/23/2025 02:30:03 PM (CT) |
| Close Date & Time | 2/27/2025 02:00:00 PM (CT) |
| Question Cut Off Date | 2/17/2025 10:00:00 AM (CT) |
| Notes |
Sealed bids for Bid Request No. 2025-001 for Johnson County Wastewater Blue River Main WWTF Phase 2 Improvements – Contract No. BRM1-C013 shall be submitted electronically at https://jocogov.ionwave.net until February 27, 2025 at 2:00 p.m. local time. If you have difficulty submitting a bid electronically, please contact Nicole Averell at nicole.averell@jocogov.org or 913-715-0595 for assistance. Submission of bids will not be allowed after the designated time. You must register as a supplier at https://jocogov.ionwave.net at least two business days prior to the bid opening to ensure a successful registration, which is required for bid submittal.
All bids that have been duly received will be publicly opened and read virtually through Zoom at 2:00 p.m. on February 27, 2025. Opening Zoom Link: Join Zoom Meeting
https://us02web.zoom.us/j/89969277011?pwd=HmZ1JjeZj8bAcOsjkQ1vd9LgD2az0O.1
Meeting ID: 899 6927 7011 Passcode: 672409
A
mandatory pre-bid video conference
will be held on February 6, 2025, at 10:00 a.m. The link below “Join Zoom Meeting” will take you directly to the Zoom conference. Mandatory Pre-Bid Video Conference: Join Zoom Meeting
https://us02web.zoom.us/j/82119784698?pwd=Q33g6EFKZndMoi0khN84TVeNjbh3IU.1
Meeting ID: 821 1978 4698 Passcode: 616545 Additional questions pertaining to the Zoom meeting and mandatory site visit can be directed to nicole.averell@jocogov.org or at (913) 715-0595.
Mandatory site visit
will be held on February 6, 2025, at 1:00 p.m. at Blue River Main WWTF, 2625 W 151st St., Overland Park, Kansas, 66224. Enter through the gate off of 151st St. and meet at the parking lot north of the Administration Building.
The work consists of the following: 1. Demolition of existing and installation of two (2) new bar screens and washer/compactors in the Influent Pumping Station. 2. Demolition of existing and installation of two (2) new grit classifiers/separators and replacement of the existing process piping and other miscellaneous pipe in the Grit Pump Building. 3. Demolition of existing and installation of new Dissolved Air Filtration (DAF) equipment in the DAF Tank. Replacement of equipment located in the DAF/Rotary Drum Thickener (RDT) Building associated with the DAF process such as sludge transfer pumps, recirculation pumps, saturation tank, air compressors and various instrumentation. Modification and rehabilitation of piping associate with DAF equipment in the DAF/RDT Building. 4. Demolition of existing chemical scrubber odor control system in the DAF/RDT Building, and installation of two (2) new radial carbon adsorption units and associated equipment and piping east of the DAF/RDT Building. 5. Recoat and other rehabilitation of the Unthickened Waste Activated Sludge (UWAS) Tank. 6. Provide and install all instrumentation shown on the Contract Drawings including all mounting requirements, power and control wiring requirements, as well as all calibration requirements specified or as necessary for a properly operating system. 7. Furnish and terminate all control and electrical wiring between instrumentation and equipment for properly operating systems. 8. The programming of existing PLCs and additions/improvements to the existing SCADA system shall be completed by Owner under a separate contract with R.E. Pedrotti. Contractor shall coordinate with Owner and R.E. Pedrotti to provide any necessary data for SCADA integration. Contractor shall provide R.E. Pedrotti with troubleshooting services and any assistance as necessary. 9. Contractor shall coordinate with Owner and R.E. Pedrotti to perform all factory acceptance testing, site acceptance testing, systems checkout and startup operations as specified herein and in other Sections. 10. Site work including grading, yard piping, seeding, sodding and pavement repairs. 11. Alternatives with the project include: A-01: Influent Pump Station – Replace three wet-weather pumps and heating, ventilation, and air conditioning (HVAC) equipment in the Electrical Room at the Influent Pump Station. Work includes electrical, controls and other ancillary items associated with a properly operating system including any additional bypass pumping required to complete the work.
All questions and bids shall be submitted through IonWave. Contract documents may be examined during normal business hours at the following locations: Financial Management and Administration Drexel Technologies Purchasing Division Johnson County Administration Building 10840 West 86th Street 111 South Cherry Street, Suite 2400 Lenexa, KS 66214-1632 Olathe, KS 66061-3441 Telephone 913-371-4430 Copies of the contract documents and specifications may be obtained from: Drexel Technologies; 10840 W. 86th Street; Lenexa, KS 66214-1632 (http://www.drexeltech.com/). Bidding Documents will be shipped only if the requesting party assumes responsibility for all related charges. Corporate, certified, or cashier’s checks shall be made payable to Drexel Technologies.
Bidders shall submit with their bid a bid bond issued by a surety company licensed to do business in the State of Kansas in the amount of five percent (5%) of the total amount of their bid. Said guarantee shall be made payable to the Board of County Commissioners of Johnson County, Kansas.
All bids shall be submitted electronically on IonWave.
|
| Name | Nicole Averell |
| Address |
111 S. Cherry, #2400
Olathe, KS 66061 USA |
| Phone | (913) 715-0595 |
| Fax | |
| nicole.averell@jocogov.org |
| Document name | Format | ||
|
|||
|
Bid Invitation
|
Acrobat / PDF | BINVAVL | 8100114 |
| File Name | Description | File Size | ||
|
||||
|
2025-001 BRM WWTF Phase 2 Improvements IFB Specifications 20250123.pdf
|
2025-001 BRM WWTF Phase 2 Improvements IFB Specifications 20250123 | 19.40 MB | 308505 | 6441761 |
|
2025-001 BRM WWTF Phase 2 Improvements IFB Drawings 20250123.pdf
|
2025-001 BRM WWTF Phase 2 Improvements IFB Drawings 20250123 | 74.57 MB | 308505 | 6441774 |
|
Questionnaire.docx
|
Questionnaire | 38 KB | 308505 | 6442875 |
|
00 43 36 - Proposed Subcontractors Form.docx
|
00 43 36 - Proposed Subcontractors Form | 35 KB | 308505 | 6442880 |
|
How to do Business with Johnson County and Supplier Response Quick Tutorial.pdf
|
How to do Business with Johnson County and Supplier Response Quick Tutorial | 2.19 MB | 308505 | 5056521 |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Title: Westwood Boulevard Street Maintenance, Phase 1 Concrete Repairs Category: Public Works
Junction City, Kansas
Bid Due: 6/30/2026
Reference No. Project Close Date Detail 3-TS-002-24 Santa Fe and Buchanan Traffic Signal
City of Olathe
Bid Due: 7/07/2026
Bid Title: Westwood Boulevard Street Maintenance, Phase 1 Concrete Repairs Category: Public Works
Junction County
Bid Due: 6/10/2026
Bid Date Status Type Project Title Stage City State 06/17/2026 Bidding Engineering *
Kansas Department of Administration
Bid Due: 6/17/2026