Brief Description: MnDOT requests proposals for assistance in performing tasks necessary to verify that the Blatnik Bridge Design-Build Construction contractor (DB contractor) is meeting all construction requirements of the Design-Build Conformed Contract for the Project. The project is primarily located in St. Louis County, Minnesota and Douglas County, Wisconsin between the cities of Duluth, Minnesota and Superior, Wisconsin. The goal of this project is to perform all required construction contract administration and verification tasks for the project.
Date posted: 04/02/2026
Due date: 04/29/2026
MnDOT Contract No: 1061634
Exhibit A: Specifications, Duties, and Scope of Work
Introduction and Background Information
1.1 General Statement of Scope of Work
Work with the State as the Design-Build Construction Contract Verification Consultant (DBCVC), which
will be called the Contractor throughout this scope of work. The State Staff and Contractor are
collectively known as the Design-Build Construction Contract Verification Team (DBCVT) for the State
Project (SP) 6981-26 on I535 for Blatnik Bridge Replacement Design-Build Project (Project). Contractor
will provide construction verification and contract administration for the Project. The goal of the DBCVC
contract is that the State receives assistance in performing the tasks necessary to verify that the Design-
Build Construction contractor (DB contractor) is meeting all requirements of the Design-Build
Conformed Contract for the Project. Contractor will attend conferences or meetings necessary for close
coordination during day-to-day progress of the work or as required to carry out the Project. Contractor
will notify the State's Project Manager immediately of any unanticipated project conditions. Contractor
will maintain a record of submittals, approvals, changes, and modifications using the State's Document
Control System Microsoft SharePoint. Contractor will collect, properly label or identify, and deliver to
the State all original calculations, drawing and sketches, electronic design files, records, reports, and
other documents prepared by the DB contractor in the performance of the work as described in this
contract upon completion or termination of the Project. Contractor will provide interpretations of the
plans, specifications and contract provisions. Contractor will consult with the State's Project Manager
when an interpretation involves complex issues or may have an impact on the cost of performing the
work. When warranted, the State's Project Manager may request an interpretation from the Contractor.
1.2 Project Letting
The Project letting is June 23, 2026.
1.3 Project Scope
The project is located in St. Louis County, Minnesota and Douglas County, Wisconsin between the cities
of Duluth, Minnesota and Superior, Wisconsin. The project limits extend 0.3 miles from the existing
bridge structure on the Minnesota approach to 0.75 miles from the existing bridge structure on the
Wisconsin approach, along US 53.
The project includes replacement of the existing John. A. Blatnik I-535 Bridge (Minnesota Bridge number
9030, Wisconsin Structure B-16-5) on Interstate 535 (I-535) connecting Duluth, Minnesota and Superior
Wisconsin across the St. Louis River and Bay. The project also includes reconstructing an interchange in
Superior, WI that routes I-535 directly to US 53, with local connections to Hammond Avenue and WIS
35. The project includes design and construction of a new mainline bridge (Minnesota Bridge number
69913, Wisconsin Structure B-16-0153) and new exit ramp bridge (WI Structure B-16-0154) and
entrance ramp bridge (WI Structure B-16-0155). The new mainline bridge includes new Minnesota
approach spans, a new main span over the Main Navigation Channel, new spans along Connor's Point,
new spans over the Howard's Pocket Navigation Channel, and new Wisconsin approach spans that
connect to US Highway 53 in Wisconsin.
The project includes a new shared use path on the easterly side of the new mainline bridge and
Wisconsin entrance ramp bridge with trail connections in Duluth and Superior, drainage improvements,
retaining walls, and improvements within the City of Superior. The existing bridge will be closed for the
majority of construction and traffic will be detoured to the Richard I. Bong Memorial Bridge.
Approximate Project cost: The estimated cost of the Project is between $1.0 billion and $1.4 billion.
1
MnDOT Contract No. 1061634
Exhibit A: Specifications, Duties, and Scope of Work
To find additional project information related to the Project, refer to the project website located here:
https://www.dot.state.mn.us/designbuild/blatnik-bridge/index.html
Project information such as design files, layouts and more can be found on the project SharePoint site,
which is found on the project website. Download and review all files on the project SharePoint site.
State anticipates that this work may extend past 5 years, which may result in a subsequent contract
being set up to finish the work.
1.4 Verification Team Organization Chart
Exhibit A - Attachment 1 is the DBCVC organization chart and shows how the State will staff the DBCVT
for this project. It graphically shows the chain of command. It also shows how the DBCVC staff
described in this contract interacts with the State staff.
2 Project Management
Contractor will perform all work necessary to manage this DBCVC Contract and its personnel. Contractor
will assist State with managing the DB Conformed Contract.
2.1 DBCVC Project Manager
This person is responsible for managing the contract.
2.1.1 Staffing Requirements
Contractor will supply one person, in total, to perform the duties of the DBCVC Project Manager. The
person serving as the DBCVC Project Manager may also function as the DBCVC Contract Change
Manager and/or the Office Manager Document Control
2.1.2 Co-location
The DBCVC Project Manager is not required to be co-located.
2.2 Flexible Workforce
DBCVC personnel approved by the State's Project Manager are considered by the State to be committed
to performing services for the durations listed in this scope of work. Any changes will require written
approval from the State's Project Manager and include both adding additional staff and reducing staff.
The Contractor will be advised of the official Notice of Award of the DB Conformed Contract and will be
ready to fully staff all personnel on the DBCVT for the project within one week after notification. No
personnel will be assigned until written notification by the State's Project Manager has been issued.
If the DB Contract is suspended for any reason, the DBCVC's forces will be adjusted to correspond with
the type of cessation, either complete or partial suspension. DBCVC will continuously look ahead to fully
understand what type of staff are needed and in what numbers. The Contractor's schedule will be
dictated by the DB contractor's schedule. DBCVC will provide a flexible workforce so that only those
staff that can be fully utilized during any given project activity are present and billing hours to the
contract.
DBCVC will continuously monitor all activity to ensure that all work carried out is within the agreed
scope and completed with resources that can complete the work as budgeted. In the event it becomes
necessary to complete work outside the original scope of work, the Contractor's Project Manager will
notify the State's Project Manager immediately before proceeding. No work outside the original scope
will be done without written authorization from the State's Project Manager.
2
MnDOT Contract No. 1061634
Exhibit A: Specifications, Duties, and Scope of Work
Throughout this scope of work, the availability in the co-located facility will be defined as full-time (40
hours per week) or part-time (less than 40 hours per week) for a specified duration.
Throughout the course of the Project, it may become evident that two or more DBCVC roles would be
more efficiently staffed by a single qualified person. If this situation arises, the DBCVC can make a
request to the State's Project Manager to modify the staff by combining roles. The State's Project
Manager will evaluate the experience and workload of the remaining staff member and will make a
determination of whether the roles should be combined. If multiple roles are allowed to be staffed by a
single person, the State Project Manager may reverse that decision at a later date, if circumstances call
for more attention to those roles than the single person can effectively handle.
Conversely, it is expected that the DBCVC have staff available to fulfill the obligations of each role
described within this contract. Certain roles are defined as being co-located with the DBCVT office and
have estimates of the amount of time expected to be co-located per week. To meet the requirements of
this Flexible Workforce section, team members that are co-located and even those that are not co-
located may need to be present at the co-location office more often than estimated in order to
efficiently and effectively fulfill the duties of those roles so that the DB Contractor is not unduly
burdened by the verification activities.
When the DB Contractor's operations on the Project diminish, the DBCVC will reduce the number of its
personnel assigned to the Project as appropriate. Any adjustment of DBCVC forces as recommended by
the State's Project Manager will be accomplished within one week after notification. The State's Project
Manager will provide said notification to the DBCVC in writing, and the DBCVC will provide confirmation
of notification in writing.
2.2.1 Flexible Workforce - Project Support Staff
The DBCVC will need to leverage additional project support staff, whether within their company or
through subconsultants, to assist the various roles on the DBCVT. The additional staff are expected to be
available to help with the task of reviewing plans and calculations, create quantities to counter claims by
the DB contractor, and use other software listed in this scope to evaluate products the DB contractor
creates using that software.
2.2.2 Co-location
Throughout this scope of work, some roles of the DBCVT are designated as being co-located and others
are not. Co-located personnel are expected to be physically located in the project field office for the
time indicated for each role. Keep in mind, all personnel on the DBCVT are obligated to meet the
requirements of the Flexible Workforce section of this scope.
In order to effectively manage the budget for the DBCVT, co-located personnel will be expected to
inform the Verification Consultant Project Manager and the State Project Manager, if co-location
requirements are excessive based on the current verification activities of the role. If, in agreement with
the State's Project Manager, it is decided that the co-located role can be just as effectively performed
partly from the team member's home office then it may be determined that the co-location
requirements be temporarily relaxed.
Personnel that are not to be co-located at the project field office can perform their role from their home
office. However, non-co-located personnel are required to report to the project office or project site as
needed for specific meetings, over-the-shoulder reviews, inspection verification, and other duties in a
timely and efficient manner to fulfill the obligations of their roles on the DBCVT if requested by the
State's Project Manager.
3
MnDOT Contract No. 1061634
Exhibit A: Specifications, Duties, and Scope of Work
It is incumbent upon all DBCVT members to utilize current web-conferencing best practices to be an
effective resource to the DBCVT and the DB Contractor during meetings, over-the-shoulder reviews and
questions that arise from the DB Contractor. The purpose of a co-location office is to minimize difficulty
of communication between the DBCVT and the DB Contractor, so technology cannot be a hindrance in
this relationship. If web-conferencing is not working efficiently to communicate between the two teams,
the role member will be expected to be present at the co-location office as needed so the DB Contractor
is not unduly delayed. It is important that any phone or web conference technical difficulties be
minimized or eliminated so that co-location can be effectively minimized for each role.
2.3 Items Provided by the State
The State will provide office space, basic furniture, and access to State servers. Expendable office
supplies will be paid for by the State and will be ordered by the DBCVC through the State supply system.
Expendable office supplies are defined as items that generally are used one time and then discarded and
include, but are not limited to: staples, rubber bands, note pads, paper, folders, pens, and paper clips.
2.4 Items Provided by Contractor
1. Cellular phones, computer, and printer.
2. Durable office supplies and reference material for their own employees as needed. Durable office
supplies are defined as items that can be reused and include, but are not limited to: staplers,
tape dispensers, scissors, rulers, three-hole punches, staple removers, and mechanical pencils.
3. Own equipment and testing supplies for all testing of component materials used on the Project.
4. A sufficient number of clearly identifiable vehicles to maintain the necessary coverage of the
Project and to adequately transport personnel and equipment. The vehicles will have the
necessary safety features to be within the work zone. DBCVC will be solely responsible for risk
of loss of or damage to vehicles and will replace or repair vehicles at its own cost. DBCVC will be
required to obtain adequate insurance coverage for such loss or damage. Contractor will service
and maintain the vehicles as needed.
5. Cellular phones for all DBCVC field personnel assigned to the Project. Provide a list of these
phone numbers to the State's Project Manager. DBCVC will be solely responsible for risk of loss
of or damage to cellular phones and will replace or repair cellular phones at its own cost.
Contractor will service and maintain the phones as needed.
Verify and obtain approval from the State Project Manager prior to equipment and office supply
purchases.
2.5 Web Based Teleconferencing
Contractor will provide the means for the DBCVT to meet via web-based teleconferencing. Such a
system will allow participants to log into a website to view the desktop of the meeting organizer.
Participants will be able to "take control" of the virtual desktop as needed to point out things on the file
being displayed. Voice communication will occur via phone teleconferencing.
2.6 Tasks
2.6.1 DBCVC Staffing Approval
Contractor will utilize only personnel who are qualified by experience and education. Contractor will
submit, in writing, to the State's Project Manager the names of all personnel to be considered for
assignment to the project, together with detailed resumes with respect to education, experience
(including specific durations) and qualifications of each individual. Minimum qualifications for the
4
MnDOT Contract No. 1061634
Exhibit A: Specifications, Duties, and Scope of Work
DBCVC personnel are set forth in this Scope of Work. The State may require that these minimum
qualifications be altered in instances when the unique nature of the work requires specific specialized
skills.
No personnel will be assigned to this Project by the DBCVC until the qualifications of each person
proposed have been reviewed and approved in writing by the State's Project Manager. The Contractor's
personnel approval request will be submitted at least two weeks prior to the date an individual is
scheduled to report to work.
An individual previously approved by the State's Project Manager whose performance is later
determined by the State to be unsatisfactory will be replaced by the DBCVC within two weeks.
Be responsible for obtaining proper licenses for equipment and personnel operating equipment when
licenses are required.
(A) Deliverable: DBCVC Personnel Approval Request. One request may include multiple people.
(B) Format: Electronic Microsoft Word 2013 document (docx extension). Deliver to the State's Project
Manager electronically either by email
(C) Due: At least two weeks prior to the date an individual is scheduled to report to work.
(D) Standard: Written as a letter/email.
(E) State Review: Five business days.
(F) DBCVC Update: Update and resubmit the deliverable to the State within five business days of
receiving State review comments.
2.6.2 Weekly Verification Team Meetings
The State's Construction Manager will schedule and facilitate weekly meetings with the entire DBCVT.
Meetings will be held at the co-housed facility. Any personnel not co-housed may attend the meeting
via conference call or web-based teleconference. The State conference call system may be used if web-
based teleconferencing is not required for a particular meeting.
(A) Deliverable: A weekly verification team meeting. Meeting minutes are not required.
(B) Format: Meet in co-housed office conference room.
(C) Due: Weekly.
(D) Standard: Intentionally left blank. Minutes are not required.
2.6.3 Performance of the DBCVC Reviews
During the life of the Project, the State's Project Manager may conduct reviews of the various phases of
the DBCVC performance and operations.
Reviews will be to determine compliance and the sufficiency with which procedures are being effectively
applied to ensure that this contract's scope of work is being performed in substantial conformity with
State policies, plans, specifications, and DB Conformed Contract requirements. The DBCVC will
cooperate and assist the State's Project Manager, or his representative(s), in the conduct of the reviews.
When deficiencies are indicated in a review, remedial action will be immediately implemented by the
DBCVC in conformance with the State's Project Manager's recommendations. The State's Project
Manager's remedial recommendations and the Contractor's actions will be properly documented by the
DBCVC in a Performance of the DBCVC Review Report. In general, remedial action will be required
commensurate with the degree and nature of the deficiencies cited. Additional compensation will not
be allowed for remedial action taken to correct deficiencies by the Contractor. Remedial actions may
include any or all, but are not necessarily limited to, the following actions:
5
MnDOT Contract No. 1061634
Exhibit A: Specifications, Duties, and Scope of Work
1) Further subdivide assigned responsibilities or assign additional personnel. The DBCVC will
comply with this action within 24 hours of notification by the State's Project Manager.
2) Replace personnel whose performance has been determined by the State's Project Manager to
be inadequate. When directed by the State's Project Manager, any person whose performance
has been determined to be unsatisfactory will be immediately removed.
(A) Deliverable: Performance of the DBCVC Review Report.
(B) Format: Electronic Microsoft Word 2013 document (docx extension) delivered via email
(C) Due: Within five business days of the review's occurrence.
(D) Standard: A formal business report.
(E) State Review: Within five business days.
(F) DBCVC Update: Five business days of receipt of State review of deliverable.
2.6.4 Monthly Progress Report Meetings
The DBCVC Project Manager, when requested, will meet with the State's Project Manager to review the
monthly progress reports and invoices. DBCVC Project Manager will solicit feedback from the State's
Project Manager to assess whether all services meet or exceed the requirements of the project. If
needed, DBCVC will direct changes to personnel and/or procedures to correct identified deficiencies and
implement opportunities for improvements.
(A) Deliverable: An informal meeting with the monthly progress reports and invoices
supplied.
(B) Format: See requirements in contract and in this Scope of Work.
(C) Due: Monthly at the same time as the contract progress reports and invoices.
(D) Standard: Intentionally left blank. Meeting minutes are not required.
(E) State Review: During the meeting.
(F) DBCVC Update: Update progress reports and invoices as needed within five business
days of State review.
3 Contract Team
3.1 Office Management and Document Control
Serve as Compliance Officer to ensure Contactor's compliance with contract requirements, including
Equal Employment Opportunity (EEO) Affirmative Action (AA) plans and Disadvantaged Business
Enterprise (DBE) requirements. Additionally, his role will assist the State's Project Manager and the
State's Document Control Manager with the document management generated from the DBCVT.
Become an expert in using the State's document control management system. Train DBCVT to use the
State's document control management system. the State will perform the initial training for the system.
3.1.1 Staffing Requirements
Contractor will provide one person, in total, to perform the duties of the Office Manager and Document
Control (OMDC). May also serve as the DBCVC Project Manager.
3.1.1.1 Co-location
The OMDC will be co-located with the State's Project Manager and is expected to be in the co-located
facility part-time. At this time the location of the office is unknown but is expected to be within three
miles of the Blatnik Bridge.
3.1.2 Tasks
6
MnDOT Contract No. 1061634
Exhibit A: Specifications, Duties, and Scope of Work
3.1.2.1 Administration Support
Provide miscellaneous administration support activities including but not limited to document drafting &
formatting, reviewing letters, filing, copying, answering office phone, taking messages, and mail
processing.
(A) Deliverable: Letters, filing, copying and mail processing, etc.
(B) Format: Electronic Microsoft Word 2013 document (docx extension), hard copies, and
Adobe PDF.
(C) Due: Continuous throughout project. Each item will have its own deadline. DBCVC must
adapt to the workload to meet deadlines. Filing of a specific item should occur within 5
business days of the item being received.
(D) Standard: Intentionally left blank.
(E) State Review: Continuous.
(F) DBCVC Update: Continuous.
3.1.2.2 AA/EEO Contract Compliance
Serve as Compliance Officer to ensure DVCVC's compliance with AA/EEO plans. The DBCVC will arrange
a meeting with the State's Project Manager no later than two weeks after the DB Contract award to
determine exact reporting requirements needed for this task.
DBCVC will schedule and facilitate monthly meetings with the State's Project Manager to review AA/EEO
requirements.
(A) Deliverable: Monthly Compliance Reports and other documentation.
(B) Format: Electronic Microsoft Word 2013 document (docx extension) and hard copies.
(C) Due: Monthly
(D) Standard: Conformed Contract and MnDOT Contract Administration Manual.
(E) State Review: One day. Review will occur at the monthly meeting.
(F) DBCVC Update: Five business days.
3.1.2.3 Prevailing Wage Compliance
Serve as Compliance Officer to ensure Contactor's compliance with Prevailing Wage requirements. The
DBCVC will review all electronic payroll submittals in the Minnesota Department of Transportation
(MnDOT) AASHTOware system and review and approve those payrolls on behalf of the State.
DBCVC will provide updates to the DB contractor and to the State's Project Manager on the status of
payroll issues as needed
(A) Deliverable: Approved AASHTOware payrolls
(B) Format: Electronic in AASHTOware
(C) Due: Weekly
(D) Standard: Conformed Contract and MnDOT Contract Administration Manual.
(E) State Review: One day.
(F) DBCVC Update: Five business days.
3.1.2.4 DBE Contract Compliance (if needed)
Serve as Compliance Officer to ensure Contactor's compliance with DBE requirements. The DBCVC will
arrange a meeting with the State's Project Manager no later than 2 weeks after the DB Contract award
to determine exact reporting requirements needed for this task.
DBCVC will schedule and facilitate monthly meetings with the State's Project Manager to review DBE
requirements.
7
MnDOT Contract No. 1061634
Exhibit A: Specifications, Duties, and Scope of Work
(A) Deliverable: Required forms and reports as described in the MnDOT Contract Administration
Manual.
(B) Format: Electronic Microsoft Word 2013 document (docx extension) and hard copies.
(C) Due: See MnDOT Contract Administration Manual.
(D) Standard: Conformed Contract and MnDOT Contract Administration Manual.
(E) State Review: One day. Review will occur at the monthly meeting.
(F) DBCVC Update: Five business days.
4 Construction Quality Management Team
Contractor will assist the State with the implementation of the quality management system on the
Project. Duties for this position include: following and managing quality management processes and
procedures for State staff, training the State's verification staff on design and construction quality
management processes and procedures, overseeing and auditing the DB Contractor's quality
management system, reviewing quality manuals, overseeing the implementation of the State's quality
processes (e.g., checking whether or not State testing rates are being met, audits are being performed,
hold are points being used).
Contractor will perform construction quality acceptance testing and inspection verification (including
acceptance at critical activity points), and auditing of the DB Contractor's quality management system
and Quality Manual by fulfilling all of the State's roles for Quality Management as described in the DB
Conformed Contract.
Auditing will entail the collection and documentation of objective evidence to verify whether
requirements have been met. The results of auditing will be documented on standardized audit report
forms. Non-conformances will be communicated and tracked in separate reports. The audit results will
also be recorded in a database, and regular summary and status reports will be provided. The timing,
frequency, and depth of auditing will be at the State's discretion.
At any time as deemed necessary at the sole discretion of the State, verification staff may perform
inspection verification or take samples for further investigation of possible non-conforming Work.
Audit the DB Contractor's quality management system to determine whether quality activities are being
carried out and are implemented effectively, which includes quality activities related to both design and
construction. Perform construction quality acceptance testing and inspection verification that the DB
Contractor's Work meets contract requirements. All documentation of quality activities, tests, and
inspection verification will be entered into the State's Document Control System.
4.1 Staffing Requirements
4.1.1 Quality Manager
Contractor will supply one person, in total, to perform the duties of the Quality Manager. This person is
assigned the overall responsibility for verifying that the DB Contractor is meeting all requirements of the
DB's Quality Management System (QMS) and requirements of the DB Conformed Contract and will:
1) Verify that the DB Contractor is training workers in the operation of the QMS,
2) Perform regular audits of the QMS (administrative and field) and DB Contractor's Quality
Management,
3) Report to the State Project Manager on the QMS effectiveness and performance, and
4) Identify problems with the QMS and make recommendations to the State Project Manager for
revisions to improve the QMS.
8
MnDOT Contract No. 1061634
Exhibit A: Specifications, Duties, and Scope of Work
The Quality Manager has no responsibilities in the production of the Work, technical review of design
documents, or performance of DB Contractor construction inspection.
4.1.2 Roadway Inspection Verifications
Contractor will provide one person to serve as Chief Roadway Inspection Verifier. The Chief Roadway
Inspection Verifier will be responsible for verifying that all construction is in accordance with approved
plans, specifications and special provisions, that compliance with State construction standards and
policies are maintained, as well as any other applicable laws.
Chief Roadway Inspection Verifier will be responsible for quality assurance material testing, inspection
verification of grading, paving, storm sewer installation, utility installation, signals and lighting, concrete
pours, Mechanically Stabilized Earth (MSE) retaining walls, landscaping, and assisting with construction
stormwater inspections. This position will also identify field problems and verify that the solutions are
pursued and implemented as quickly as possible to minimize delays and costs while achieving an
acceptable result. When field problems are encountered, this position will be responsible for assembling
all relevant information in a concise and orderly manner, reviewing all the information and
circumstances, and reporting recommendations to the State's Project Supervisors and Construction
Manager.
Other responsibilities include, but are not limited to, contract administration, traffic control compliance,
project certification, project finalization, maintaining daily records of all activities and events related to
construction activities, and collecting digital photos for the Project records as a tool in claim
avoidance/resolution. Each inspector will take at least ten images of their work area daily. Images will be
identified by the date and the Critical Path Method (CPM) Schedule ID number.
While performing the duties of this job, the inspection verifier is required to work outside exposed to
the weather elements, both hot and cold, on a daily basis. They will frequently drive a motor vehicle in
off-road conditions. Periodically they will walk on even and uneven sloping ground. They will work in
high volume traffic zones in day and nighttime conditions. They will frequently and continually rotate
through various body positions, such as standing, twisting, bending, sitting, kneeling, and squatting.
They will operate machinery and testing equipment using vision and hearing under varying
temperatures. They will frequently move up to 50 pounds by pushing, pulling, lifting, and carrying. They
will work at extreme heights. Periodically they will push or pull carts, dollies, and two-wheeled trucks.
They will wear and use personal protective equipment to protect the head, eyes, hearing, respiration,
visibility, and feet from injury.
The person will need to obtain the current certification in the following State certifications as a
requirement of this position:
4.1.3 Structures Inspection Verification
Contractor will provide two people to serve as Chief Structures Inspection Verifier. These positions will
assist the State's Construction Manager and the State's Project Supervisors with verifying that all
construction is in accordance with approved plans, specifications and special provisions, that compliance
with State construction standards and policies are maintained, as well as any other applicable laws.
The Chief Structures Inspection Verifiers will assist the State's Project Supervisor in quality assurance
material testing, inspection verification of: bridge/structure foundation systems, reinforcing steel,
concrete pours, retaining walls, and assisting with construction stormwater inspections. This position
will also identify field problems and verify that the solutions are pursued and implemented as quickly as
9
MnDOT Contract No. 1061634
Exhibit A: Specifications, Duties, and Scope of Work
possible to minimize delays and costs while achieving an acceptable result. When field problems are
encountered, these positions will be responsible for assembling all relevant information in a concise and
orderly manner, reviewing all the information and circumstances, and reporting outcomes to the State's
Project Supervisors and Construction Manager.
Other responsibilities include, but are not limited to, contract administration, project certification and
project finalization, maintaining daily records of all activities and events related to construction
activities, and collecting digital photos for the Project records as a tool in claim avoidance/resolution.
Each inspector will take at least ten images of their work area daily. Images will be identified by the date
and the CPM Schedule ID number.
While performing the duties of this job, the inspection verifier is required to work outside exposed to
the weather elements, both hot and cold, on a daily basis. They will frequently drive a motor vehicle in
off-road conditions. Periodically they will walk on even and uneven sloping ground. They will work in
high volume traffic zones in day and nighttime conditions. They will frequently and continually rotate
through various body positions, such as standing, twisting, bending, sitting, knelling, and squatting.
They will operate machinery and testing equipment using vision and hearing under varying
temperatures. They will frequently move up to 50 pounds by pushing, pulling, lifting, and carrying. They
will work at extreme heights. Periodically they will push or pull carts, dollies, and two-wheeled trucks.
They will wear and use personal protective equipment to protect the head, eyes, hearing, respiration,
visibility, and feet from injury.
The person will need to obtain the current certification in the following State certifications as a
requirement of this position:
4.1.4 Intermediate Inspection Verification
Contractor will provide three to four people to serve as Intermediate Inspection Verifier. These positions
will assist the chief inspector verifiers, both roadway and structure, with verifying that all construction is
in accordance with approved plans, specifications and special provisions, that compliance with State
construction standards and policies are maintained, as well as any other applicable laws.
The Intermediate Inspection Verifiers will assist the chief inspector verifiers in quality assurance material
testing, inspection verification of: grading, paving, storm sewer installation, utility installation, signal,
MSE retaining walls, and landscape pours. bridge/structure foundation systems, reinforcing steel,
concrete pours, and retaining walls. This position will also identify field problems and verify that the
solutions are pursued and implemented as quickly as possible to minimize delays and costs while
achieving an acceptable result.
Other responsibilities include, but are not limited to, assisting with project certification and project
finalization, maintaining daily records of all activities and events related to construction activities, and
collecting digital photos for the Project records as a tool in claim avoidance/resolution. Each inspector
will take at least ten images of their work area daily. Images will be identified by the date and the CPM
Schedule ID number.
While performing the duties of this job, the inspection verifier is required to work outside exposed to
the weather elements, both hot and cold, on a daily basis. They will frequently drive a motor vehicle in
off-road conditions. Periodically they will walk on even and uneven sloping ground. They will work in
high volume traffic zones in day and nighttime conditions. They will frequently and continually rotate
10
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Event Name: RECS RFP Pre-Design for MCF-Faribault Expansion Business Unit: Admin - Real
State Government of Minnesota
Bid Due: 8/31/2026
Bid Title: Hopkins Housing and Redevelopment Authority - Dow Towers Rehab - Architect
Hopkins city
Bid Due: 8/17/2026
PUBLIC WORKS FACILITY - ARCHITECTURE/ENGINEERING SERVICES. The City of Golden Valley is soliciting
League of Minnesota Cities
Bid Due: 8/11/2026
PUBLIC WORKS FACILITY - ARCHITECTURE/ENGINEERING SERVICES. The City of Golden Valley is soliciting
League of Minnesota Cities
Bid Due: 8/11/2026