Bird Mitigation and Cleaning
| Agency: | TRANSPORTATION, DEPARTMENT OF |
|---|---|
| State: | South Carolina |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Apr 28, 2025 |
| Due Date: | May 9, 2025 |
| Solicitation No: | 697DCK-25-Q-00025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Apr 28, 2025 02:42 pm CDT
- Original Date Offers Due: May 09, 2025 02:30 pm CDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: May 24, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: S207 - HOUSEKEEPING- INSECT/RODENT CONTROL
-
NAICS Code:
- 561710 - Exterminating and Pest Control Services
-
Place of Performance:
Summerville , SCUSA
- BACKGROUND:
The QRJ ARSR (Air Route Surveillance Radar) located in Jedburg, South Carolina was commissioned in 1971. The QRJ ARSR is a mission critical facility supporting air traffic control operations. Currently, predatory birds are perching, causing damage, and impacting communication operations (see attached photos). To maintain critical operations and support to air traffic control, a cleaning and installation of bird mitigation measures is required.
GENERAL CONDITIONS:
- Contractor is responsible for any Federal, State or Local permits required for the work. Submit all necessary information including manufacturers’ materials specifications, contractor’s safety plan, and schedule to the FAA prior to and during proposed execution of this work scope.
- Contractor shall provide project schedule outlining all phases and sub-phases of the work and their impact on the facility. All work will need to be scheduled and performed in such a manner as to minimize the impact to the facility. Work hours and days affecting access/escort shall be coordinated with local FAA facilities personnel.
- Contractor shall provide general construction services, including proper tools, equipment, site superintendent, dumpster/disposal services, barriers/barricades, protection of work and property, general product and equipment submittals, construction cleaning and closeout procedures, interim life safety measures for facilities under construction, and general requirements for work.
- Contractor shall maintain a clean site and remove temporary equipment from site if obstructing/disrupting operations. This includes immediate containment and/or removal of any debris that may become washed out, wind borne, or potential site hazard of any kind.
- Contractor shall repair any damages caused by work performed at no additional cost to the government and further covered by minimum locally required liability insurance.
SCOPE:
The scope of work includes the following:
- Pressure wash QRJ ARSR catwalk and platform including handrails. Wash and rise areas below tower to ensure waste is removed.
- Provide and install approximately 10,000 square feet of new bird netting deterrent at platform level of QRJ ARSR as indicated on attached photos.
- Provide and install two (2) laser bird deterrent systems to prevent birds from perching on existing communication towers.
- Provide and install approximately four hundred (400) linear feet of bird shock track at QRJ ARSR catwalk level to prevent birds from perching on catwalk hand railing as indicated on attached photos.
- Provide and install two (2) solar charges for new bird shock track system.
- Coordinate location of all bird mitigation measures include in the statement of work with local FAA facility personnel prior to installation.
FAA RESPONSIBILITIES:
The following FAA Responsibilities applicable to this Statement of Work include:
- Access –Site access must be coordinated with FAA facility personnel a minimum of 48 hours in-advance. FAA will provide escort services once site access has been properly coordinated.
- Supervision – FAA will provide facilities representative oversight for onsite contracted activities.
- AAQ-500, FAA SW REGIONAL OFFICE 10101 HILLWOOD PKWY
- FORT WORTH , TX 76177
- USA
- Brandi Holmes
- brandi.b.holmes@faa.gov
- Phone Number 8172224763
- Todd Butler
- Todd.Butler@faa.gov
- Phone Number 8172224397
- Apr 28, 2025 02:42 pm CDTSolicitation (Original)
See Also
Project: Landscaping Services Ref. #: 2027-RFP-007 Type: RFP Status: Open Open Date: Sep
Beaufort - Jasper Water & Sewer Authority
Due by 9/30/2026
Ad Title: Cleanroom Services Purchasing Agent/Entity: University of South Carolina Ad Publish Date:
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Due by 11/20/2026
Solicitation Number Solicitation Description Purchasing Agency Submission Ending Date/Time 5400030166 Linen Services for
State Fiscal Accountability Authority
Due by 10/05/2026
Ad Title: Refuse Collection Purchasing Agent/Entity: The Citadel Ad Publish Date: September 14,
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Due by 10/14/2026