Big Ten Network Phase 2 (PRIME PREQUALIFICATIONS)

Agency: UCLA Capital Programs
State: California
Type of Government: State & Local
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Aug 20, 2025
Due Date: Sep 18, 2025
Solicitation No: 942402.01
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Project Name Big Ten Network Phase 2 (PRIME PREQUALIFICATIONS)
Project Number 942402.01
Project Description Subject to conditions prescribed by the University of California, Los Angeles, responses to the University's prequalification documents for a Lump Sum contract are sought from prospective prime contractor bidders (hereafter “bidders”) for the following project:

The project will provide National Collegiate Athletic Association (NCAA) sports facility broadcast improvements and upgrades at Mapes Beach (beach volleyball), Spieker Aquatic Center (swimming and water polo), and John Wooden Center (volleyball), and improvements to the campus fiber optic cabling infrastructure, as Phase 2 of the Big Ten Network. This project would support UCLA’s transition to the Big Ten Conference and enable multiple simultaneous live broadcasts of UCLA athletic competitions on the Big Ten Network’s B1G+ digital platform.

The project involves the installation of broadcast communication equipment and infrastructure, including new camera stations (with both dedicated broadcast cameras and replay cameras), television reception panels (TVRPs), input/output (I/O) panels, waterproof enclosures or junction boxes (JBTs), and associated broadcast cabling and electrical conduit at each venue. Project improvements would make use of existing underground conduit networks as much as possible. New 100-amp and 200-amp connections would be installed as needed for the camera stations and TVRPs, with electrical power provided from existing electrical panels and/or substations at each location.

All relevant athletic venues will connect to a centralized broadcast facility via a future campus fiber optic network that will be run in existing underground campus IT conduit. This project includes the installation of 300 linear feet of new underground conduit between existing manholes off Charles E. Young Drive North, where there is insufficient existing pathway for the future campus fiber network.

Work may be sequenced and phased to maintain existing site occupants and facility operations.

Hazmat abatement will be required.

TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS; ADDENDA, IF ANY; PQ CONFERENCE SIGN-IN SHEET; ETC.), CLICK HERE: UCLA ONLINE PLANROOM
Estimated Construction Cost $6,363,000.00
906011.01
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Negotiation Number Negotiation Type Title Open Date Close date Details 411534-2 RFQ ANIMAL

City of Oakland

Bid Due: 6/18/2026

Project ID: 1350-26 Title: Recreation Management System Addenda: 0 Release Date: 5/21/2026 Due

City of Manhattan Beach

Bid Due: 6/25/2026

Project ID: Title: Enterprise Master Patient Index (EMPI) Addenda: 0 Release Date: 6/8/2026

County of San Mateo

Bid Due: 7/24/2026

title rfq type open date close date status actions ANIMAL CATCH & CARE

City of Oakland

Bid Due: 6/18/2026