BIG CYPRESS GOLF AND COUNTRY CLUB ESTATES OF NAPLES SECONDARY DRAINAGE IMPROVEMENTS AND WATER MAIN REPLACEMENT

Agency: Collier County
State: Florida
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: Aug 24, 2025
Due Date: Oct 7, 2025
Solicitation No: 25-8421
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description


Project ID: 25-8421

Title: BIG CYPRESS GOLF AND COUNTRY CLUB ESTATES OF NAPLES SECONDARY DRAINAGE IMPROVEMENTS AND WATER MAIN REPLACEMENT

Addenda: 0

Release Date: 8/22/2025

Due Date: 10/7/2025

Post Information
Posted At:Fri, Aug 22, 2025 8:00 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

Collier County hereby advertises on August 22, 2025, Bid No. 25-8421 for the secondary drainage improvements and water main replacement located within Big Cypress Golf & Country Club residential areas and the adjacent Country Club of Naples golf course in Collier County, Florida, for sealed bids to be received no later than October 7, 2025 at 3:00 p.m. local time. A non-mandatory pre-bid meeting will be held on September 11, 2025 at 10:00 a.m. at Collier County Procurement Services Conference Room A, Bldg. C2, 3295 Tamiami Trail East, Naples FL 34112 for this solicitation. Prospective bidders must register on https://procurement.opengov.com/portal/collier-county-fl and click Subscribe. Once registered & subscribed, interested parties may obtain a complete set of documents at: https://procurement.opengov.com/portal/collier-county-fl . All bids will be publicly opened and read aloud. Any bids received after the time and date specified will not be accepted and shall be returned unopened to the Bidder. The anticipated project budget is: $8,000,000.00.

Background

The Big Cypress Country Club of Naples (BCCCN) Stormwater System Retrofit project addresses long-standing drainage issues within the Big Cypress Golf & Country Club (BCG&CC) residential area and the adjacent Country Club of Naples (CCN) golf course. Originally part of a single planned development from the early 1960s, subsequent replatting separated the community into two distinct entities. Despite separate ownership, both areas were designed to function under a shared stormwater management system, as documented in a 1978 South Florida Water Management District (SFWMD) submittal. However, decades of uncoordinated maintenance, unauthorized drainage modifications, and natural events such as Hurricane Irma in 2017 have compromised the effectiveness of the system, resulting in flooding that, for the first time, entered homes. A 2020 feasibility study identified critical infrastructure improvements to restore stormwater flow, increase system capacity, and protect against peak flood conditions, particularly during high Gordon River stages.

This construction project will implement the stormwater retrofit as outlined in Phase 1 and Phase 2 of the design plan, including re-establishing a functional gravity outfall system and reconstructing the roadside swale and culvert system within the BCG&CC roadways—Burning Tree Drive, Cypress Pointe Drive, and Mel Jen Drive. The project will include the replacement of the existing water main to improve utility coordination. While the feasibility study proposed a pump station and berms to protect against riverine backflow, these elements are not part of this solicitation and will be addressed under the next phase. The overall objective is to deliver a reliable, permitted, and resilient stormwater system that restores flow connectivity, mitigates flood risk, and complies with regulatory requirements.

Timeline
Release Project Date:
August 22, 2025
Pre-Bid Meeting (Non-Mandatory):
September 11, 2025, 10:00am
Procurement Services
3295 Tamiami Trail East BLDG C-2, Conference Room A
Naples, FL 34112
Question Submission Deadline:
September 30, 2025, 5:00pm
Proposal Submission Deadline:
October 7, 2025, 3:00pm
Procurement Services
3295 Tamiami Trail East BLDG C-2, Conference Room B
Naples, FL 34112
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Project ID: Title: ITB# RS-26-52 Bamford Park North Parking Lot Expansion - Phase

Town of Davie

Due by 10/01/2026

RFQ-26-C-00002 26-C-00002 Ballast Point Public Pier Replacement Design View Details Posted: Friday, September

City of Tampa

Due by 10/08/2026

Project ID: Coming Soon Title: A Sneak Peek into Future Projects! Hernando County's

Hernando County

Due by 9/25/2026

Project ID: 7199-26/TAD Title: Public Works Minor Construction Projects Less Than $7,500,000.00 Addenda:

Seminole County

Due by 9/23/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.