Bid 24-051326 Stormwater Maintenance 26-27
| Agency: | City of High Point |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 29, 2026 |
| Due Date: | Aug 30, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Bid Title: |
Bid 24-051326 Stormwater Maintenance 26-27
|
| Category: | Bid Tabulations |
| Status: | Open |
|
Attachment Preview
| ENGINEERS ESTIMATE | PDC, INC. | C&C ENVIRONMENTAL SERVICES LLC. | BREECE ENTERPRISES, INC. | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LINE # | DOT | DESCRIPTION | QTY | UOM | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL |
| 1 | SP | STANDARD UTILITY CREW AND EQUIPMENT | 250 | HR | $850.00 | $212,500.00 | $800.00 | $200,000.00 | $600.00 | $150,000.00 | $800.00 | $200,000.00 |
| 2 | SP | STANDARD UTILITY CREW AND EQUIPMENT (OVERTIME) | 20 | HR | $1,000.00 | $20,000.00 | $900.00 | $18,000.00 | $775.00 | $15,500.00 | $800.00 | $16,000.00 |
| 3 | SP | FLASHING ARROW PANEL, TYPE C | 15 | EA | $300.00 | $4,500.00 | $125.00 | $1,875.00 | $1,134.00 | $17,010.00 | $200.00 | $3,000.00 |
| 4 | SP | CONES/BARRELS/SKINNY DRUMS | 200 | EA | $20.00 | $4,000.00 | $5.00 | $1,000.00 | $35.00 | $7,000.00 | $10.00 | $2,000.00 |
| 5 | SP | BARRICADES TYPE III | 15 | EA | $200.00 | $3,000.00 | $50.00 | $750.00 | $375.00 | $5,625.00 | $150.00 | $2,250.00 |
| 6 | SP | WORK ZONE SIGNS (PORTABLE) | 50 | SF | $20.00 | $1,000.00 | $5.00 | $250.00 | $50.00 | $2,500.00 | $15.00 | $750.00 |
| 7 | SP | INCIDENTAL STONE BASE | 80 | TN | $52.00 | $4,160.00 | $42.00 | $3,360.00 | $65.00 | $5,200.00 | $45.00 | $3,600.00 |
| 8 | SP | CLEAN STONE NO 57 FOR TRENCH STABILIZATION | 80 | TN | $55.00 | $4,400.00 | $53.00 | $4,240.00 | $65.00 | $5,200.00 | $55.00 | $4,400.00 |
| 9 | 876 | CLASS B RIP RAP | 25 | TN | $60.00 | $1,500.00 | $76.00 | $1,900.00 | $65.00 | $1,625.00 | $65.00 | $1,625.00 |
| 10 | 876 | CLASS II RIP RAP | 25 | TN | $60.00 | $1,500.00 | $76.00 | $1,900.00 | $65.00 | $1,625.00 | $70.00 | $1,750.00 |
| 11 | 876 | GEOTEXTILE FOR DRAINAGE | 10 | SY | $45.00 | $450.00 | $35.00 | $350.00 | $10.00 | $100.00 | $30.00 | $300.00 |
| 12 | SP | SELECT BACKFILL MATERIAL, CLASS I | 80 | CY | $70.00 | $5,600.00 | $40.00 | $3,200.00 | $35.00 | $2,800.00 | $50.00 | $4,000.00 |
| 13 | SP | TOPSOIL | 20 | CY | $75.00 | $1,500.00 | $125.00 | $2,500.00 | $47.00 | $940.00 | $45.00 | $900.00 |
| 14 | SP | PERMANENT SEEDING AND MULCHING | 200 | SY | $10.00 | $2,000.00 | $2.00 | $400.00 | $2.25 | $940.00 | $5.00 | $1,000.00 |
| 15 | SP | MATTING FOR EROSION CONTROL | 100 | SY | $5.00 | $500.00 | $6.00 | $600.00 | $8.80 | $880.00 | $5.00 | $500.00 |
| 16 | SP | TEMPORARY SAFETY FENCE | 50 | LF | $5.00 | $250.00 | $4.00 | $200.00 | $2.45 | $122.50 | $3.00 | $150.00 |
| 17 | SP | 15" RCP PIPE CULVERTS CLASS III | 8 | LF | $34.00 | $272.00 | $45.00 | $360.00 | $75.15 | $601.20 | $30.00 | $240.00 |
| 18 | SP | 18" RCP PIPE CULVERTS CLASS III | 8 | LF | $38.00 | $304.00 | $50.00 | $400.00 | $75.00 | $600.00 | $35.00 | $280.00 |
| 19 | SP | 24" RCP PIPE CULVERTS CLASS III | 8 | LF | $65.00 | $520.00 | $75.00 | $600.00 | $100.00 | $800.00 | $60.00 | $480.00 |
| 20 | SP | 30" RCP PIPE CULVERTS CLASS III | 8 | LF | $90.00 | $720.00 | $90.00 | $720.00 | $100.00 | $800.00 | $85.00 | $680.00 |
| 21 | SP | 36" RCP PIPE CULVERTS CLASS III | 8 | LF | $125.00 | $1,000.00 | $125.00 | $1,000.00 | $150.00 | $1,200.00 | $120.00 | $960.00 |
| 22 | SP | 42" RCP PIPE CULVERTS CLASS III | 8 | LF | $175.00 | $1,400.00 | $155.00 | $1,240.00 | $175.00 | $1,400.00 | $155.00 | $1,240.00 |
| 23 | SP | 48" RCP PIPE CULVERTS CLASS III | 8 | LF | $210.00 | $1,680.00 | $190.00 | $1,520.00 | $200.00 | $1,600.00 | $200.00 | $1,600.00 |
| 24 | SP | 54" RCP PIPE CULVERTS CLASS III | 8 | LF | $340.00 | $2,720.00 | $285.00 | $2,280.00 | $325.00 | $2,600.00 | $285.00 | $2,280.00 |
| 25 | SP | 60" RCP PIPE CULVERTS CLASS III | 8 | LF | $425.00 | $3,400.00 | $330.00 | $2,640.00 | $400.00 | $3,200.00 | $340.00 | $2,720.00 |
| 26 | SP | 15" RCP END SECTION | 1 | EA | $1,150.00 | $1,150.00 | $1,150.00 | $1,150.00 | $1,350.00 | $1,350.00 | $1,050.00 | $1,050.00 |
| 27 | SP | 18" RCP END SECTION | 1 | EA | $1,300.00 | $1,300.00 | $1,250.00 | $1,250.00 | $1,500.00 | $1,500.00 | $1,200.00 | $1,200.00 |
| 28 | SP | 24" RCP END SECTION | 1 | EA | $1,650.00 | $1,650.00 | $1,400.00 | $1,400.00 | $1,625.00 | $1,625.00 | $1,400.00 | $1,400.00 |
| 29 | SP | 30" RCP END SECTION | 1 | EA | $2,000.00 | $2,000.00 | $1,950.00 | $1,950.00 | $2,250.00 | $2,250.00 | $1,850.00 | $1,850.00 |
| 30 | SP | 36" RCP END SECTION | 1 | EA | $3,000.00 | $3,000.00 | $2,700.00 | $2,700.00 | $3,125.00 | $3,125.00 | $2,800.00 | $2,800.00 |
| 31 | SP | 42" RCP END SECTION | 1 | EA | $3,600.00 | $3,600.00 | $3,350.00 | $3,350.00 | $3,950.00 | $3,950.00 | $3,600.00 | $3,600.00 |
| 32 | SP | 48" RCP END SECTION | 1 | EA | $4,000.00 | $4,000.00 | $4,200.00 | $4,200.00 | $4,700.00 | $4,700.00 | $4,500.00 | $4,500.00 |
| 33 | SP | 54" RCP END SECTION | 1 | EA | $6,000.00 | $6,000.00 | $100.00 | $100.00 | $6,025.00 | $6,025.00 | $1.00 | $1.00 |
| 34 | SP | 60" RCP END SECTION | 1 | EA | $6,750.00 | $6,750.00 | $100.00 | $100.00 | $7,725.00 | $7,725.00 | $1.00 | $1.00 |
| 35 | SP | 15" POLYPROPYLENE PIPE CULVERTS | 20 | LF | $35.00 | $700.00 | $30.00 | $600.00 | $50.00 | $1,000.00 | $25.00 | $500.00 |
| 36 | SP | 18" POLYPROPYLENE PIPE CULVERTS | 20 | LF | $42.00 | $840.00 | $39.00 | $780.00 | $50.00 | $1,000.00 | $35.00 | $700.00 |
| 37 | SP | 24" POLYPROPYLENE PIPE CULVERTS | 20 | LF | $54.00 | $1,080.00 | $62.00 | $1,240.00 | $75.00 | $1,500.00 | $55.00 | $1,100.00 |
| 38 | SP | 30" POLYPROPYLENE PIPE CULVERTS | 20 | LF | $85.00 | $1,700.00 | $99.00 | $1,980.00 | $100.00 | $2,000.00 | $90.00 | $1,800.00 |
| 39 | SP | 36" POLYPROPYLENE PIPE CULVERTS | 20 | LF | $95.00 | $1,900.00 | $108.00 | $2,160.00 | $100.00 | $2,000.00 | $95.00 | $1,900.00 |
| 40 | SP | 42" POLYPROPYLENE PIPE CULVERTS | 20 | LF | $120.00 | $2,400.00 | $131.00 | $2,620.00 | $125.00 | $2,500.00 | $120.00 | $2,400.00 |
| 41 | SP | 48" POLYPROPYLENE PIPE CULVERTS | 20 | LF | $145.00 | $2,900.00 | $180.00 | $3,600.00 | $175.00 | $3,500.00 | $160.00 | $3,200.00 |
| 42 | SP | 54" POLYPROPYLENE PIPE CULVERTS | 20 | LF | $250.00 | $5,000.00 | $60.00 | $1,200.00 | $200.00 | $4,000.00 | $1.00 | $20.00 |
| 43 | SP | 60" POLYPROPYLENE PIPE CULVERTS | 20 | LF | $290.00 | $5,800.00 | $297.00 | $5,940.00 | $275.00 | $5,500.00 | $250.00 | $5,000.00 |
| 44 | SP | MISCELLANEOUS BRICK WORK | 1 | CY | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,400.00 | $1,400.00 | $1,000.00 | $1,000.00 |
| 45 | SP | CONCRETE /FLOWABLE FILL | 3 | CY | $450.00 | $1,350.00 | $300.00 | $900.00 | $175.00 | $525.00 | $350.00 | $1,050.00 |
| 46 | 840 | MASONRY DRAINAGE STRUCTURES 0-5' | 4 | EA | $4,500.00 | $18,000.00 | $4,000.00 | $16,000.00 | $1,400.00 | $5,600.00 | $4,500.00 | $18,000.00 |
| 47 | 840 | MASONRY DRAINAGE STRUCTURES EXTRA DEPTH | 10 | LF | $500.00 | $5,000.00 | $500.00 | $5,000.00 | $4,275.00 | $42,750.00 | $100.00 | $1,000.00 |
| 48 | SP | MASONRY DRAINAGE STRUCTURE COHP STD DWG 411.01 | 1 | EA | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $1,600.00 | $1,600.00 | $4,500.00 | $4,500.00 |
| 49 | SP | MASONRY DRAINAGE STRUCTURE COHP STD DWG 411.01 EXTRA DEPTH | 5 | LF | $450.00 | $2,250.00 | $400.00 | $2,000.00 | $75.00 | $375.00 | $100.00 | $500.00 |
| 50 | SP | BRICK MASONRY CATCH BASIN CHP TYPE A 0-5' DEEP | 5 | EA | $3,850.00 | $19,250.00 | $3,750.00 | $18,750.00 | $2,000.00 | $10,000.00 | $4,500.00 | $22,500.00 |
| 51 | SP | BRICK MASONRY CATCH BASIN CHP TYPE A EXTRA DEPTH | 5 | LF | $375.00 | $1,875.00 | $500.00 | $2,500.00 | $75.00 | $375.00 | $100.00 | $500.00 |
| 52 | 840 | FRAME AND GRATE STD 840.16 | 5 | EA | $650.00 | $3,250.00 | $675.00 | $3,375.00 | $840.16 | $4,200.80 | $650.00 | $3,250.00 |
| 53 | SP | FLAGGERS | 80 | HR | $60.00 | $4,800.00 | $45.00 | $3,600.00 | $20.00 | $1,600.00 | $35.00 | $2,800.00 |
| 54 | SP | HAULING AND DISPOSAL OF WASTE | 20 | CY | $60.00 | $1,200.00 | $35.00 | $700.00 | $50.00 | $1,000.00 | $60.00 | $1,200.00 |
| 55 | SP | ASPHALT PLANT MIX PAVEMENT REPAIR | 100 | TN | $700.00 | $70,000.00 | $180.00 | $18,000.00 | $95.00 | $9,500.00 | $675.00 | $67,500.00 |
| 56 | SP | 2 FT - 6 INCH CONCRETE CURB AND GUTTER | 75 | LF | $250.00 | $18,750.00 | $30.00 | $2,250.00 | $55.00 | $4,125.00 | $150.00 | $11,250.00 |
| 57 | SP | 4 INCH CONCRETE FLATWORK | 60 | SY | $225.00 | $13,500.00 | $50.00 | $3,000.00 | $550.00 | $33,000.00 | $150.00 | $9,000.00 |
| 58 | SP | 6 INCH CONCRETE FLATWORK | 35 | SY | $250.00 | $8,750.00 | $60.00 | $2,100.00 | $550.00 | $19,250.00 | $175.00 | $6,125.00 |
| 59 | SP | CONCRETE CURB RAMP | 3 | EA | $3,500.00 | $10,500.00 | $1,400.00 | $4,200.00 | $4,000.00 | $12,000.00 | $1,000.00 | $3,000.00 |
| $516,121.00 | $376,980.00 | $432,419.50 | $438,902.00 |
BID TABULATIONS
cah ver 5/13/2026
ENGINEERS ESTIMATE PDC, INC. C&C ENVIRONMENTAL SERVICES LLC. BREECE ENTERPRISES, INC.
STORMWATER MAINTENANCE 2026 - 2027, BID 24-051326
LINE # DOT DESCRIPTION QTY UOM UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
STANDARD UTILITY CREW AND
1 SP 250 HR $850.00 $212,500.00 $800.00 $200,000.00 $600.00 $150,000.00 $800.00 $200,000.00
EQUIPMENT
STANDARD UTILITY CREW AND
2 SP 20 HR $1,000.00 $20,000.00 $900.00 $18,000.00 $775.00 $15,500.00 $800.00 $16,000.00
EQUIPMENT (OVERTIME)
3 SP FLASHING ARROW PANEL, TYPE C 15 EA $300.00 $4,500.00 $125.00 $1,875.00 $1,134.00 $17,010.00 $200.00 $3,000.00
4 SP CONES/BARRELS/SKINNY DRUMS 200 EA $20.00 $4,000.00 $5.00 $1,000.00 $35.00 $7,000.00 $10.00 $2,000.00
5 SP BARRICADES TYPE III 15 EA $200.00 $3,000.00 $50.00 $750.00 $375.00 $5,625.00 $150.00 $2,250.00
6 SP WORK ZONE SIGNS (PORTABLE) 50 SF $20.00 $1,000.00 $5.00 $250.00 $50.00 $2,500.00 $15.00 $750.00
7 SP INCIDENTAL STONE BASE 80 TN $52.00 $4,160.00 $42.00 $3,360.00 $65.00 $5,200.00 $45.00 $3,600.00
CLEAN STONE NO 57 FOR TRENCH
8 SP 80 TN $55.00 $4,400.00 $53.00 $4,240.00 $65.00 $5,200.00 $55.00 $4,400.00
STABILIZATION
9 876 CLASS B RIP RAP 25 TN $60.00 $1,500.00 $76.00 $1,900.00 $65.00 $1,625.00 $65.00 $1,625.00
10 876 CLASS II RIP RAP 25 TN $60.00 $1,500.00 $76.00 $1,900.00 $65.00 $1,625.00 $70.00 $1,750.00
11 876 GEOTEXTILE FOR DRAINAGE 10 SY $45.00 $450.00 $35.00 $350.00 $10.00 $100.00 $30.00 $300.00
12 SP SELECT BACKFILL MATERIAL, CLASS I 80 CY $70.00 $5,600.00 $40.00 $3,200.00 $35.00 $2,800.00 $50.00 $4,000.00
13 SP TOPSOIL 20 CY $75.00 $1,500.00 $125.00 $2,500.00 $47.00 $940.00 $45.00 $900.00
14 SP PERMANENT SEEDING AND MULCHING 200 SY $10.00 $2,000.00 $2.00 $400.00 $2.25 $940.00 $5.00 $1,000.00
15 SP MATTING FOR EROSION CONTROL 100 SY $5.00 $500.00 $6.00 $600.00 $8.80 $880.00 $5.00 $500.00
16 SP TEMPORARY SAFETY FENCE 50 LF $5.00 $250.00 $4.00 $200.00 $2.45 $122.50 $3.00 $150.00
17 SP 15" RCP PIPE CULVERTS CLASS III 8 LF $34.00 $272.00 $45.00 $360.00 $75.15 $601.20 $30.00 $240.00
18 SP 18" RCP PIPE CULVERTS CLASS III 8 LF $38.00 $304.00 $50.00 $400.00 $75.00 $600.00 $35.00 $280.00
19 SP 24" RCP PIPE CULVERTS CLASS III 8 LF $65.00 $520.00 $75.00 $600.00 $100.00 $800.00 $60.00 $480.00
20 SP 30" RCP PIPE CULVERTS CLASS III 8 LF $90.00 $720.00 $90.00 $720.00 $100.00 $800.00 $85.00 $680.00
21 SP 36" RCP PIPE CULVERTS CLASS III 8 LF $125.00 $1,000.00 $125.00 $1,000.00 $150.00 $1,200.00 $120.00 $960.00
22 SP 42" RCP PIPE CULVERTS CLASS III 8 LF $175.00 $1,400.00 $155.00 $1,240.00 $175.00 $1,400.00 $155.00 $1,240.00
23 SP 48" RCP PIPE CULVERTS CLASS III 8 LF $210.00 $1,680.00 $190.00 $1,520.00 $200.00 $1,600.00 $200.00 $1,600.00
24 SP 54" RCP PIPE CULVERTS CLASS III 8 LF $340.00 $2,720.00 $285.00 $2,280.00 $325.00 $2,600.00 $285.00 $2,280.00
25 SP 60" RCP PIPE CULVERTS CLASS III 8 LF $425.00 $3,400.00 $330.00 $2,640.00 $400.00 $3,200.00 $340.00 $2,720.00
26 SP 15" RCP END SECTION 1 EA $1,150.00 $1,150.00 $1,150.00 $1,150.00 $1,350.00 $1,350.00 $1,050.00 $1,050.00
27 SP 18" RCP END SECTION 1 EA $1,300.00 $1,300.00 $1,250.00 $1,250.00 $1,500.00 $1,500.00 $1,200.00 $1,200.00
28 SP 24" RCP END SECTION 1 EA $1,650.00 $1,650.00 $1,400.00 $1,400.00 $1,625.00 $1,625.00 $1,400.00 $1,400.00
29 SP 30" RCP END SECTION 1 EA $2,000.00 $2,000.00 $1,950.00 $1,950.00 $2,250.00 $2,250.00 $1,850.00 $1,850.00
30 SP 36" RCP END SECTION 1 EA $3,000.00 $3,000.00 $2,700.00 $2,700.00 $3,125.00 $3,125.00 $2,800.00 $2,800.00
31 SP 42" RCP END SECTION 1 EA $3,600.00 $3,600.00 $3,350.00 $3,350.00 $3,950.00 $3,950.00 $3,600.00 $3,600.00
32 SP 48" RCP END SECTION 1 EA $4,000.00 $4,000.00 $4,200.00 $4,200.00 $4,700.00 $4,700.00 $4,500.00 $4,500.00
33 SP 54" RCP END SECTION 1 EA $6,000.00 $6,000.00 $100.00 $100.00 $6,025.00 $6,025.00 $1.00 $1.00
34 SP 60" RCP END SECTION 1 EA $6,750.00 $6,750.00 $100.00 $100.00 $7,725.00 $7,725.00 $1.00 $1.00
35 SP 15" POLYPROPYLENE PIPE CULVERTS 20 LF $35.00 $700.00 $30.00 $600.00 $50.00 $1,000.00 $25.00 $500.00
36 SP 18" POLYPROPYLENE PIPE CULVERTS 20 LF $42.00 $840.00 $39.00 $780.00 $50.00 $1,000.00 $35.00 $700.00
37 SP 24" POLYPROPYLENE PIPE CULVERTS 20 LF $54.00 $1,080.00 $62.00 $1,240.00 $75.00 $1,500.00 $55.00 $1,100.00
38 SP 30" POLYPROPYLENE PIPE CULVERTS 20 LF $85.00 $1,700.00 $99.00 $1,980.00 $100.00 $2,000.00 $90.00 $1,800.00
39 SP 36" POLYPROPYLENE PIPE CULVERTS 20 LF $95.00 $1,900.00 $108.00 $2,160.00 $100.00 $2,000.00 $95.00 $1,900.00
40 SP 42" POLYPROPYLENE PIPE CULVERTS 20 LF $120.00 $2,400.00 $131.00 $2,620.00 $125.00 $2,500.00 $120.00 $2,400.00
41 SP 48" POLYPROPYLENE PIPE CULVERTS 20 LF $145.00 $2,900.00 $180.00 $3,600.00 $175.00 $3,500.00 $160.00 $3,200.00
42 SP 54" POLYPROPYLENE PIPE CULVERTS 20 LF $250.00 $5,000.00 $60.00 $1,200.00 $200.00 $4,000.00 $1.00 $20.00
43 SP 60" POLYPROPYLENE PIPE CULVERTS 20 LF $290.00 $5,800.00 $297.00 $5,940.00 $275.00 $5,500.00 $250.00 $5,000.00
44 SP MISCELLANEOUS BRICK WORK 1 CY $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,400.00 $1,400.00 $1,000.00 $1,000.00
45 SP CONCRETE /FLOWABLE FILL 3 CY $450.00 $1,350.00 $300.00 $900.00 $175.00 $525.00 $350.00 $1,050.00
46 840 MASONRY DRAINAGE STRUCTURES 0-5' 4 EA $4,500.00 $18,000.00 $4,000.00 $16,000.00 $1,400.00 $5,600.00 $4,500.00 $18,000.00
MASONRY DRAINAGE STRUCTURES
47 840 10 LF $500.00 $5,000.00 $500.00 $5,000.00 $4,275.00 $42,750.00 $100.00 $1,000.00
EXTRA DEPTH
MASONRY DRAINAGE STRUCTURE COHP
48 SP 1 EA $6,000.00 $6,000.00 $6,000.00 $6,000.00 $1,600.00 $1,600.00 $4,500.00 $4,500.00
STD DWG 411.01
MASONRY DRAINAGE STRUCTURE COHP
49 SP 5 LF $450.00 $2,250.00 $400.00 $2,000.00 $75.00 $375.00 $100.00 $500.00
STD DWG 411.01 EXTRA DEPTH
BRICK MASONRY CATCH BASIN CHP
50 SP 5 EA $3,850.00 $19,250.00 $3,750.00 $18,750.00 $2,000.00 $10,000.00 $4,500.00 $22,500.00
TYPE A 0-5' DEEP
BRICK MASONRY CATCH BASIN CHP
51 SP 5 LF $375.00 $1,875.00 $500.00 $2,500.00 $75.00 $375.00 $100.00 $500.00
TYPE A EXTRA DEPTH
52 840 FRAME AND GRATE STD 840.16 5 EA $650.00 $3,250.00 $675.00 $3,375.00 $840.16 $4,200.80 $650.00 $3,250.00
53 SP FLAGGERS 80 HR $60.00 $4,800.00 $45.00 $3,600.00 $20.00 $1,600.00 $35.00 $2,800.00
54 SP HAULING AND DISPOSAL OF WASTE 20 CY $60.00 $1,200.00 $35.00 $700.00 $50.00 $1,000.00 $60.00 $1,200.00
55 SP ASPHALT PLANT MIX PAVEMENT REPAIR 100 TN $700.00 $70,000.00 $180.00 $18,000.00 $95.00 $9,500.00 $675.00 $67,500.00
2 FT - 6 INCH CONCRETE CURB AND
56 SP 75 LF $250.00 $18,750.00 $30.00 $2,250.00 $55.00 $4,125.00 $150.00 $11,250.00
GUTTER
57 SP 4 INCH CONCRETE FLATWORK 60 SY $225.00 $13,500.00 $50.00 $3,000.00 $550.00 $33,000.00 $150.00 $9,000.00
58 SP 6 INCH CONCRETE FLATWORK 35 SY $250.00 $8,750.00 $60.00 $2,100.00 $550.00 $19,250.00 $175.00 $6,125.00
59 SP CONCRETE CURB RAMP 3 EA $3,500.00 $10,500.00 $1,400.00 $4,200.00 $4,000.00 $12,000.00 $1,000.00 $3,000.00
TOTALS $516,121.00 $376,980.00 $432,419.50 $438,902.00
NOTES:
1. C&C Environmental Services LLC unit pricing
math errors on LI#14 and LI#16. Italicized and
in bold.
Page 1 of 1
See Also
Solicitation Number: 332-2022-CDBG-NR-Jackson-Heights - 21-C-4032 Project Title: Sanford NC - Jackson Heights CDBG-NR
State Government of North Carolina
Due by 10/08/2026
ATTENTION ALL BIDDERS POC DIVISION 12 BID OPENING CONFERENCE LINE 092226_ATTENTIONTOBIDDERS.pdf Doc. Type:
Division of Highways
Due by 9/22/2026
Bid Title: Bid 4003-100726 Eastside Final Clarifier 4 Category: Bid Opportunities Status: Open
City of High Point
Due by 10/07/2026
Bid Number: 27-002 Bid Title: Pender County US 421 CFPUA Interconnect Category: General
County of Pender
Due by 10/22/2026