Bid - Sourdough WTP Interim Optimization

Agency: City of Bozeman
State: Montana
Type of Government: State & Local
Posted Date: Mar 17, 2025
Due Date: Apr 3, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid - Sourdough WTP Interim Optimization
  • Department: City%20Clerk%2C%20Water%20And%20Sewer%2C%20Water%20Treatment%2C%20Utilities
  • Category: Bids \ RFPs \ RFQs
  • Start Date: 03/16/2025 6:00 AM
  • Close Date: 04/03/2025 2:30 PM
ADVERTISEMENT FOR BIDS

CITY OF BOZEMAN

BOZEMAN, MONTANA

SOURDOUGH WTP INTERIM OPTIMIZATION

General Construction

Sealed Bids for the construction of the Sourdough Water Treatment Plant Interim Optimization in Bozeman will be received by City of Bozeman (Owner), at the office of the City Clerk located at 121 N Rouse, Suite 202, Bozeman, MT 59771-1230 or mailed to P.O. Box 1230, Bozeman, MT 59771-1230 until April 3, 2025 at 2:30 PM local time. At that time the Bids received will publicly opened and read aloud.

Project Description:

The Project includes furnishing all labor, skill, equipment, and construction materials to improve safety, accessibility, operational efficiency, and process functionality at the Bozeman WTP. The scope includes:

  1. BID PACKAGE A: Fluoride Transfer Pump Spill Containment Improvements: Modifications to the fluoride transfer pump containment area to enhance operator accessibility, safety, and movement during maintenance. Work is defined in the Construction Drawings and Specifications.
  2. BID PACKAGE B: Membrane Backwash Recycle Improvements: Installing cross-connection process piping and valves to redirect backwash waste directly to the recycle lift station, bypassing the DAFT feed wet well. Work is defined in the Construction Drawings and Specifications.
  3. BID PACKAGE C: Pretreatment Basin Underflow Baffle Curb Modifications: Removing a concrete curb from underflow baffles to streamline sludge cleaning operations in the pretreatment basin. Work is defined in the Construction Drawings and Specifications.
  4. BID PACKAGE D: Headtower Recycle Flow Improvements: Improve discharge piping at the headtower to better integrate recycle flows with raw water streams, to improve reuse water capture and treatment. Work is defined in the Construction Drawings and Specifications.

Bids are requested for the following Contract:

  • Contract No. 1 – General Construction

Owner anticipates that the Project’s total bid price will be approximately $204,999.00. Contractors will be given approximately 260 days to complete the project – the Contract Times can be found in the Agreement.

Issuing Office

The Issuin

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Butte Military Entrance Processing Station (MEPS) Noon Meals Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 7/01/2026

Menu Software Montana State University - Bozeman Culinary Services is seeking contractors to

State Government of Montana

Bid Due: 7/08/2026