Dodge City Community College is requesting sealed bid proposals for BID# 26-002 RFP DC3 Burke Drive
Pavement Project.
Project Context:
This project will be comprised of the removal of the existing asphalt pavement and replacement with concrete
pavement on Burke Drive at Dodge City Community College. Along with; curb and guttering, ADA sidewalk ramps,
and sidewalk replacement (shown as Alt. 1). All contractors will submit bids following specifications as called out in
the SMH Consultants Burke Drive Replacement Documents.
All contractors will submit bids as followed;
1. As called out in SMH Consultants Burke Drive Replacement Documents at 8-inch-thick concrete pavement
roadway.
2. As called out in SMH Consultants Burke Drive Replacement Documents with revision of 7-inch-thick
concrete pavement roadway.
3. Separate additional cost as called out in SMH Consultant Burke Drive Replacement Documents of “ALT #1
– REPLACE 4’ CONCRETE SIDEWALK 10’ WIDE.”
Note:
Project start date called out as mid-May is negotiable if DC3 agrees with appropriate phasing.
Sincerely,
Andrew Nolan
Purchasing Office
Dodge City Community College
Encl: Specifications for BID# 26-002, DCCC information for BID# 26-002
and Business Reply Label for BID# 26-002 (Please mark with your return address)
Please include a business card with updated contact information in the packet.
Contact Jared Stevens with questions or for additional information regarding this proposal or to schedule a site
visit of Burke Drive.
Jared Stevens
Director of Facilities & Operations
Dodge City Community College
2501 North 14th Avenue
Dodge City, KS 67801-2399
Email: JStevens@dc3.edu
It is anticipated that a recommendation will be submitted for board approval on December 9th, 2025.
Deadlines:
Bid Out
Bid receipt deadline
Bid Opening Santa Fe Conference Room in the Administration Building
Board of Trustees Meeting
Notification of successful bidder (Pending BOT Approval)
November 10th, 2025
December 2nd, 2025, by 5:00 PM
December 3rd, 2025 @ 11:00 AM
December 9th, 2025
December 10th, 2025
Please allow for the length of time it may take to send your bid through the USPS to meet the deadline for the bids.
You may also submit bid packets by email to bids@dc3.edu by 5:00 PM December 2nd, 2025.
The bid information and updates will be posted on the Dodge City Community College website, address
listed below.
https://dc3.edu/bid-requests-projects
Continued On Next Page
Minimum Specifications for RFP DC3 Burke Drive Pavement Project
General Information:
• Removal of existing asphalt as needed.
• All dirt work must be included in the total project cost.
• List total project cost.
SMH Consultants
Burke Drive Replace
Images of SMH Consultants Burke Drive Replacement Documents PDF below.
For onsite inspections to take measurements, contact Jared Stevens for an appointment.
All specified items are preferred, but if unable to quote for the specified item, vender can, with notification, include a
substitute for an equivalent item.
Other Bid Specifications and Conditions:
1. All bid quotations to be valid for ninety (90) days.
2. DCCC reserves the right to split up the items to different vendors.
3. Please note any bid specifications exceptions.
4. Items should be available within thirty (30) days of issuance of Purchase Order.
5. Include freight costs for on-campus delivery on a separate line.
Please allow for the length of time it may take to send your bid through the USPS to meet the deadline for the bids.
Contact Jared Stevens with questions or for additional information.
Jared Stevens
Director of Facilities and Operations
Dodge City Community College
Cell - 620-338-3747
jstevens@dc3.edu
Notification of the successful bidder will be announced after the December 9th, 2025, DC3 Board of Trustees Meeting.
This page summarizes the opportunity, including an overview and a preview of the attached documents.