Bid Ref. #26-050 Boiler Replacement 225 Judicial Building

Agency: State Government of Georgia
State: Georgia
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Apr 17, 2026
Due Date: May 20, 2026
Solicitation No: PE-64750-NONST-2026-000000189
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-64750-NONST-2026-000000189 Bid Ref. #26-050 Boiler Replacement 225 Judicial Building Albany, City Of
Apr 17, 2026 @ 12:44 PM
May 20, 2026 @ 02:30 PM
Bid Ref. #26-050 Boiler Replacement 225 Judicial Building

Start Date: Apr 17, 2026 @ 12:44 PM ET

End Date:
May 20, 2026 @ 02:30 PM ET

Event ID: PE-64750-NONST-2026-000000189
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Construction / Public Works
Government Type: city
Fiscal Year: 2026
Agency Site: Link


Description


The City of Albany Procurement Division will accept sealed bids for the replacement of two (2)
1,500,000 BTU boilers and associated circulation pumps at the Dougherty County Judicial Building 225
Pine Avenue, on behalf of the Dougherty County Board of Commissioners until 2:30 p.m. on
May 20, 2026. Submissions must be delivered to 222 Pine Avenue, Suite 260, Albany, Georgia
31701. All work must be performed in strict accordance with the provided bid documents, technical
specifications, and contract terms.

NIGP Codes
Code Description
82008 Boilers, High Pressure
82012 Boilers, Low Pressure
82014 Boiler Parts and Accessories (Not Otherwise Classified)
82042 Controllers, Steam Boiler Automatic Conductivity
67091 Water Heaters, Commercial
90924 Building Construction, Commercial and Institutional
90963 Maintenance and Repair, Commercial and Institutional Building
92567 Mechanical Engineering
BuyerContact:

Ricky Gladney
rgladney@albanyga.gov

229-302-1455

Attachment Preview

April 17, 2026
INVITATION TO BID
Boiler Replacement
225 Judicial Building
Bid Reference No. 26-050
The City of Albany Procurement Division will accept sealed bids for the replacement of two (2)
1,500,000 BTU boilers and associated circulation pumps at the Dougherty County Judicial Building 225
Pine Avenue, on behalf of the Dougherty County Board of Commissioners until 2:30 p.m. on
May 20, 2026. Submissions must be delivered to 222 Pine Avenue, Suite 260, Albany, Georgia
31701. All work must be performed in strict accordance with the provided bid documents, technical
specifications, and contract terms.
A Pre-Bid Conference will be held on April 28, 2026, at 10:00 a.m. at the Government Center, 222
Pine Avenue, Suite 260, Albany, Georgia 31701. The Project Manager will provide an overview of
the work to be performed and answer questions. All interested bidders are strongly encouraged to
attend.
This project will be bid on a lump sum basis for all specified work and will be awarded to the
responsive and responsible bidder submitting the lowest total base bid. A 5% Bid Bond is required of
all bidders. A bid bond must be present for the bid to be read or considered. 100% Performance and
Payment bonds will be required of the successful bidder.
The City of Albany and Dougherty County strongly encourages Small Business firms to participate in this
bid. Dougherty County reserves the right to reject any and all bids and to waive any informalities in the
bidding process.
Bid documents are available at the Procurement Division, www.albanyga.gov and on the Georgia
Procurement Registry.
For additional information, contact Ricky Gladney, Buyer I, at (229) 302-1455. Submit all questions
via email to rgladney@albanyga.gov cc: jswilliams@albanyga.gov and kross@albanyga.gov. The deadline
for questions is May 12, 2026, at 2:30 p.m. Replies of substance will be answered in the form of an
addendum and made available to all potential bidders.
Mill.___
* of Al ny,
ua Williams, CPPB
urement Manager
FINANCE
P.O. BOX 447 ALBANY, GA 31702 I PHONE: 229.431.3211 I FAX: 229.431.2184 I www.albanyga.gov

DOUGHERTY COUNTY
PROCUREMENT DIVISION
ALBANY, GEORGIA
INSTRUCTION TO BIDDERS
These instructions will bind bidders to terms and conditions herein set forth, except as specifically qualified in special bid and
contract terms issued with any individual bid.
1.The following criteria are used in determining low responsible bidder.
(a) The ability, capacity and skill of bidder to perform required service.
(b)Whether bidder can perform service promptly or within specified time.
(c) The character, integrity, reputation, judgment, experience and efficiency of bidder.
(d) The performance of previous contracts.
(e) The suitability of equipment or material for County use.
(f) The ability of bidder to provide future maintenance and parts service.
2. Payment terms are Net 30 unless otherwise specified. Favorable term discounts may be offered and will be
considered in determining low bids if they are deemed advantageous to the County.
3. All bids should be tabulated, totaled and checked for accuracy. The unit price will prevail in case of errors.
4. All requested information should be included in bid envelope. All desired information must be signed and included
for your bid to receive full consideration. Failure to submit any required form will be cause for bid to be rejected
as non-responsive.
5. All questions, inquiries and requests for clarification shall be directed to Procurement.
6. For multi-year contracts the following clauses pursuant to OCGA 36-60-13 apply: (1) The contract shall terminate
absolutely and without further obligation on the part of the County at the close of the calendar year in which it was
executed and at the close of each succeeding calendar year for which it may be renewed; (2) The contract may provide
for automatic renewal unless positive action is taken by the County to terminate such contract, and the nature of such
action shall be determined by the County and specified in the contract; (3) The contract shall state the total obligation
of the County for the calendar year of execution and shall further state the total obligation which will be incurred in
each calendar year renewal term, if renewed; and (4) The contract shall provide that title to any supplies, materials,
equipment, or other personal property shall remain in the vendor until fully paid for by the County.
7. Quote all prices F.O.B. Albany, Georgia or our warehouse or as specified in bid documents.
8. Each bid or proposal shall be clearly marked on the outside of the envelope as a Sealed Bid whether using a
County furnished envelope or other envelopes.
9. Bid/Proposal must be received and stamped by the Procurement Office before time stipulated in bid/proposal
documents. No responsibility will attach to any County representative or employee for premature opening of bid not
properly addressed or identified.
10. If only one bid is received, the bid may be rejected and/or re-advertised, except in the case of only one known source of supply.
11. Bids received late will not be accepted, and the County will not be responsible for late mail delivery.
12. Should a bid be misplaced by the County and found later it will be considered.
13. Bids requiring bid bonds will not be read or considered if bond is not enclosed. Bond may be in the form of cash,
certified check, cashier's check or Surety Bond issued by a Surety Company licensed to conduct business in
Georgia.
14. All bidders must be recognized and authorized dealers in the materials or equipment specified and be qualified to
advise in their application or use. A bidder at any time requested must satisfy the Procurement Office and County
Commission that he has the requisite organization, capital, plant, stock, ability and experience to satisfactorily
execute the contract in accordance with the provisions of the contract in which he is interested.
15. Any alterations, erasures, additions or omissions of required information or any changes of specifications, or bidding
schedule are done at the risk of the bidder. Any bid will be rejected that has a substantial variation, such as a
variation that affects the price, quality or delivery date (when delivery is required by a specific time).
16. When requested, SAMPLES will be furnished free of expense, properly marked for identification and accompanied by
list where there is more than one sample. The County reserves the right to mutilate or destroy any samples submitted
whenever it may be in the best interests of the County to do so for the purpose of testing.
17. County will reject any material, supplies or equipment that do not meet the specifications, even though bidder lists the
trade name or names of such materials on the bid or price quotation form.
18. The unauthorized use of patented articles is done entirely at the risk of the successful bidder.
19. The ESTIMATED QUANTITY given in the specifications or advertisement is for the purpose of bidding only. The
County may purchase more or less than the estimated quantity, and the vendor must not assume that such
estimated quantity is part of the contract.
20. Only the latest model equipment as evidenced by the manufacturer's current published literature, will be
considered. Obsolete models of equipment not in production will not be acceptable. Equipment shall be composed
of new parts and materials. Any unit containing used parts or having seen any service other than the necessary tests
will be rejected. In addition to the equipment specifically called for in the specifications, all equipment catalogued
by the manufacturer as standard or required by the State of Georgia shall be furnished with the equipment. Where
Boiler Repalcement 225 2
Judicial Building Bid Ref. #26-050

required by the State of Georgia Motor Vehicle Code, vehicles shall be inspected and bear the latest inspection
sticker of the Georgia Department of Revenue.
21. The successful bidder on motor vehicle equipment shall be required to furnish with delivery of vehicle, Certificate
of Origin and Georgia vendors shall provide Georgia Motor Vehicle form MV1.
22. Prospective bidders are responsible for examining the location of the proposed work or delivery and determining, in
their own way, the difficulties, which are likely to be encountered in the prosecution of the same.
23. All materials, equipment and supplies shall be subject to rigid inspection, under the immediate supervision of the
Procurement Office and/or the Department to which they are delivered. If defective material, equipment or supplies are
discovered, the contractor, upon being instructed by the Procurement Office, shall remove, or make good such
material, equipment or supplies without extra compensation. It is expressly understood and agreed that the inspection
of materials by the County will in no way lessen the responsibility of the contractor or release him from his obligation to
perform and deliver to the County sound and satisfactory materials, equipment or supplies. The contractor agrees to
pay the cost of all tests on defective material, equipment or supplies or allow the cost to be deducted from any monies
due him by the County.
24. Unless otherwise specified by the procurement office all materials, supplies or equipment quoted herein must be
delivered within thirty (30) days from date of notification or exception noted on bid sheet.
25. A contract will not be awarded to any corporation, firm or individual who is, from any cause, in arrears to the County
or who has failed in any former contract with the County to perform work satisfactorily, either as to the character of
the work, the fulfillment of the guarantee, or the time consumed in completing the work.
26. Reasonable grounds for supposing that any bidder is interested in more than one proposal/bid for the same item will
be considered sufficient cause for rejection of all bids/proposals in which he is interested.
27. Unless otherwise specified the County reserves the right to award each item separately or on a lump sum basis,
whichever is in the best interest of the County.
28. The County reserves the right to waive any minor discrepancies, reject any or all bids or proposals, and to purchase
any part, all or none of the services, materials, supplies or equipment specified.
29. Failure of the bidder to sign the bid or have the signature of any authorized representative or agent on the
bid/proposal IN THE SPACE PROVIDED will be cause for rejection of the bid. Signature must be written in ink.
30. Any bidder may withdraw his bid at any time before the time set for opening of bids. No bid may be withdrawn without
cause in the 60-day period after bids are opened.
31. It is mutually understood and agreed that if any time the Procurement Office shall be of the opinion that the contract
or any part thereof is unnecessarily delayed or that the rate of progress or delivery is unsatisfactory, or that the
contractor is willfully violating any of the conditions or covenants of the agreement, or is executing the same in bad
faith, the Procurement Office shall have the power to notify the aforesaid contractor of the nature of the complaint.
Notification shall constitute delivery of notice, or letter, to address given in bid/proposal. If after three working days of
notification the conditions are not corrected to the satisfaction of the Procurement Office, he shall thereupon have the
power to take whatever action he may deem necessary to complete the work or delivery herein described, or any part
thereof, and the expense thereof, so charged, shall be deducted from any paid by the County out of such monies as
may become due to the said contractor, under and by virtue of this agreement. In case such expense shall exceed the
last said sum, then and in that event, the bondsman or the contractor, his executors, administrators, successors, or
assigns, shall pay the amount of such excess to the County on notice by the Procurement Office of the excess due.
32. If the bidder proposes to furnish any item of a foreign make or product, he should write "Foreign" together with the
name of the originating country opposite such item on bid/proposal.
33. Any complaint from bidders relative to the Invitation to Bid or any attached specifications should be made prior
to the time of opening of bids, otherwise such complaint cannot be properly considered.
34. No vendor writing restrictive specifications for the County will be allowed to bid on the project.
35. Contracts may be cancelled by the County with or without cause with 30-day written notice.
36. Dougherty County has an equal opportunity purchasing policy. The County seeks to ensure that all segments of the
business community have access to supplying the goods and services needed by the County programs. The County
affirmatively works to encourage utilization of minority business enterprises in our procurement activities. The County
provides equal opportunities for all businesses and does not discriminate against any vendors regardless of race,
color, religion, age, sex, national origin, or handicap.
37. All Corporations must provide the corporate seal and a copy of the Secretary of State's Certificate of
Incorporation upon request.
38. Local bidder (domiciled in Dougherty County) will receive bid in the event of tie bids. In the case of tie bids between
out of town companies or between local concerns, evaluated as equal, bid will be recommended or awarded by
chance coin toss, or drawing straws.
39. The contractor shall secure all permits, license certificates, inspections (permanent and temporary) and occupational
tax certificate, if applicable, before any work can commence. Contractor as well as any and all known subcontractors
must possess or will be required to obtain a City of Albany Occupational Tax Certificate or Registration.
40. Prior to submitting bid, check website at www.albanyga.gov or call the Procurement Office at 229-431-3211
for any subsequent addendums.
PROCUREMENT FORM - REVISED 3/18/2018
Boiler Repalcement 225 3
Judicial Building Bid Ref. #26-050

DOUGHERTY COUNTY
SPECIAL INSTRUCTIONS
Boiler Replacement
225 Judicial Building
Bid Ref. #26-050
1. General Information: This project consists of the removal and replacement of the existing
boiler system at the Dougherty County Judicial Building, located at 225 Pine Avenue. The scope
involves the disposal of two current units and the installation of two (2) new 1,500,000 BTU non-
condensing boilers-specified as Patterson-Kelley Modufire N1500MFD or an approved equal-
along with new circulation pumps, exhaust stacking, and electrical service. The selected
contractor will be responsible for the complete integration of the new units into the existing
water loop and CO monitoring systems, ensuring a fully operational, safe, and efficient heating
system that complies with all state codes and manufacturer specifications.
2. Contractor's bid shall include all necessary labor, materials, tools, equipment, and all other items
necessary to complete the contract requirements in accordance with specifications, general
conditions, special instructions to bidders and all other provisions included in this invitation to bid.
3. Bidder shall be responsible to visit the job site and familiarize himself with the local conditions.
4. No bid may be withdrawn for a period of sixty (60) days from the bid opening date.
5. The Owner reserves the right to reject any and all bids and to waive any informalities in the
bidding process.
6. The Owner of this project is the Dougherty County.
7. Contract Duration: All work shall be substantially complete within 180 calendar days from
the Notice to Proceed. The County recognizes that equipment lead times may be significant.
Bidders must submit a preliminary project schedule with their bid, identifying the anticipated
delivery date for long-lead items (boilers and pumps). The County reserves the right to adjust the
on-site construction start date based on confirmed equipment delivery windows to minimize
disruption to the Judicial Building
8. Liquidated Damages: Time is an essential element of the Contract, and any delay in the
prosecution of The Work may inconvenience the public, obstruct traffic, or interfere with
business. In addition to the aforementioned inconveniences, any delay in completion of The Work
will always increase the cost of engineering. For this reason, it is important that the work be
pressed vigorously to completion. Should the Contractor fail to complete the work within the time
stipulated in the Contract or within such extra time that may be allowed, charges shall be
assessed against any money due or that may become due the Contractor in accordance with the
rate of one hundred dollars ($100) per calendar day.
9. Bid Bond: Each bid must be accompanied by a certified check, cashier's check, cash, or bid
bond (surety) acceptable to the Owner, in an amount equal to at least five percent (5%) of the
bid. This security is payable without condition to the Owner as a guaranty that the bidder, if
awarded the contract, will promptly execute the Agreement in accordance with the bid and other
contract documents. In accordance with O.C.G.A. 36-91-50, the successful bidder shall
further furnish good and sufficient bonds for the faithful performance of the same and for the
payment to all persons supplying labor and material for the work (Performance and Payment
Bonds). The bid bond must be presented in its original form. Copies are not acceptable.
Boiler Repalcement 225 4
Judicial Building Bid Ref. #26-050

10.Performance Bond and Payment Bonds: The awarded bidder will be required to furnish a
100% Performance Bond and a 100% Labor and Materials Payment Bond. These bonds
serve as a guarantee of the faithful performance of the contract and the payment of all persons
supplying labor and materials for the project. In accordance with O.C.G.A. 36-91-70 and
36-91-90, all bonds must be submitted in their original form to the Procurement Office before
work can commence. Copies are not acceptable.
11.Bid Form: Bid form must be submitted on the bid form provided by Dougherty County. Bid is
for a lump sum contract and will be awarded to the responsive and responsible bidder submitting
the lowest total base bid.
12.General Insurance Requirements: Contractor shall maintain applicable insurance for this
project with companies licensed to do business in the State of Georgia acceptable to the County
for the protection of the County and name it as an additional insured, against all claims, losses,
costs or expenses arising out of injuries or death of persons whether or not employed by
contractor, whether arising from the acts or omission, negligence or otherwise of contractor or
any of its agents, employees, patrons, or other persons, and growing out of work being done by
Contractor on behalf of the County, such policies to provide for a liability limit on account of each
accident resulting in the bodily injury or death of not less than One Million ($1,000,000)
Dollars, a liability limit of not less than One Million ($1,000,000) Dollars for each accident for
property damage. Contractor shall also carry product/completed operations liability insurance for
personal injuries and/or death in the amount not less than One Million ($1,000,000) Dollars
for any one person. Contractor shall maintain a combined single liability limit of One Million
($1,000,000) Dollars covering owned, non-owned, leased, and hired vehicles. Contractor shall
furnish to the County satisfactory evidence that it carries Worker's Compensation Insurance in
the statutory limits of Georgia and Employers' Liability with limits of liability of no less than One
Hundred Thousand ($100,000) Dollars of each accident/disease. These polices must also
contain a waiver of subrogation in favor of Dougherty County. Contractor shall furnish evidence
to the County of the continuance in force of said policy's declaration page (s) to the Procurement
Agent. Acceptable proofs of insurance: (i) a Certificate of Insurance with Additional Insured
Endorsement (a Certificate of Insurance by itself is not acceptable) or (ii) Declaration Pages of
the insurance policies listed below which show Dougherty County Board of Commissioners as
additional insured. All insurance policies must provide that Dougherty County will be notified
within 30 days of any changes, restrictions, and/or cancellation. The County's sole judgment shall
control as to the sufficiency of the coverage.
13.Indemnity Agreement: An executed copy of this form should accompany your bid and must
be completed for contract award. (See attached).
14.Governing Law & Venue: An executed copy of this form should accompany your bid. (See
attached).
15.Certificate of Non-Collusion: An executed copy of this form should accompany your bid. (See
attached).
16.Drug Free Workplace: An executed copy of this form should accompany your bid. (See
attached).
17.Debarred Bidders Integrity Form: An executed copy of this form should accompany your bid.
(See attached).
Boiler Repalcement 225 5
Judicial Building Bid Ref. #26-050

18.Permits & Fees: Within five (5) days following the issuance of the Notice to Proceed, the
contractor shall apply for all permits. Failure to do so may result in award of this contract to the
next lowest bidder and the original contractor may be billed for the difference in price. The
contractor shall secure all permits, license certificates, inspections (permanent and temporary)
and occupational tax certificate(s) before any work can commence. This documentation should
be on file in the Procurement Office prior to the start of any work associated with this contract.
The contractor is required to contact the Project Manager, Matt Idlett, at (229) 431-3230,
Midlett@dougherty.ga.us within five (5) days of completion for a final inspection.
Contractor as well as any and all known subcontractors must possess or will be required to obtain
a City of Albany Occupational Tax Certificate or Registration prior to commencement of work.
19.Addendum Acknowledgement Form: An executed copy of this form must accompany your
bid. (See attached). All addendums must be acknowledged on this form.
20.Compliance: The contractor is responsible for knowledge of and compliance with all laws,
codes, ordinances, and regulations that are applicable to this type of work.
21.Superintendent: The contractor shall have a superintendent or representative on the site at all
times while work is being performed. He will represent the contractor and all communications
given to him shall be binding as if given to the contractor.
22.Preservation of Property: The contractor shall carry out his work with such care and by the
proper methods to prevent damage to the property adjacent to the work or within streets,
easement locations to the extent the owner may have rights therein, or other property of the
owners or of others, whether adjacent to the work site or not, the removal, relocation, or
destruction of which is not called for by the provisions of the contract documents; it being a
condition of the execution of the contract that the work be performed in such manner that the
property of others and other property of the owner shall not be damaged in any way. The word
PROPERTY, as used, is intended to include among other types of property, public street
improvements, storm and sanitary sewers, water lines and appurtenances, or other structures.
Should any property be damaged or destroyed, the contractor at his own expense shall promptly,
or within reasonable time, repair or make such restoration as is practical and acceptable to the
owner of the damaged or destroyed property. In case of failure on the part of the contractor to
repair or restore such property, or make good such damage or injury, the Building Inspector may
within forty-eight (48) hours notice, proceed to repair, rebuild, or otherwise restore such property
as may be necessary, and the cost thereof will be deducted from any monies due or which may
become due the contractor under this contract agreement. The contractor shall, at all times in
performance of the work, employ approved methods and exercise reasonable care and skill so as
to avoid delay, damage, injury or destruction of existing public service installations and
structures; and shall at all times in the performance of the work avoid interference with, or
interruption of, public utilities services, and shall cooperate fully with the owners thereof to the
end.
23.Public Convenience and Safety: Fire hydrants on or adjacent to the street shall be kept
accessible to the fire apparatus at all times and no material or obstructions shall be placed within
ten (10) feet of any hydrant. Adjacent premises must be given access at all times and gutters
shall not be obstructed. Materials shall not be stored along the streets. Traffic on streets shall be
maintained at all times. Dust and debris shall not create a hazard or a nuisance.
24.Barricades and Warnings: The contractor shall provide erect and maintain all necessary
barricades, suitable and sufficient number of watchmen to direct traffic, and take all necessary
Boiler Repalcement 225 6
Judicial Building Bid Ref. #26-050

precautions for the protection of the work and safety of the public. Barricades and obstructions
shall be illuminated at night and lights shall be kept burning from sunset to sunrise.
25.Removal of Trash and Rubbish: The contractor shall be responsible for the removal and legal
disposal of all waste, trash, and rubbish resulting from the work under this contract. Work site
shall be kept clean and orderly during construction; trash shall be removed from the site or
adequately containerized daily.
26.Termination for Convenience: This contract may be terminated in whole or in part by
Dougherty County with the consent of the contractor in which case the two parties shall agree
upon the termination conditions, including the effective date in the case of partial termination,
the portion to be terminated or by the contractor upon written notification to Dougherty County
setting forth the reasons for such termination, the effective date, and in the case of partial
termination, the portion to be terminated. However, if in the case of partial termination,
Dougherty County determines that the remaining portion of the award will not accomplish the
purposes for which the contract was awarded, Dougherty County may terminate the contract in
its entirety.
27.Termination of Contract for Cause: In the event that the contractor shall for any reason or
through any cause be in default of the terms, conditions, or obligations of the contract
documents, the County may give the contractor written notice of such default and terminate the
contract. All terms, conditions, and obligations of the contract documents are considered
material. The County may, in its discretion, provide the contractor an opportunity to cure the
default, if curable, prior to termination. Unless a different duration is provided in the notice of
default, the contractor shall have fourteen (14) calendar days to cure the default from the date
such notice is mailed to the contractor, unless notification is by facsimile or personal delivery, in
which case the opportunity to cure shall commence upon delivery of the notice. Upon failure of
the contractor to cure the default the County may immediately terminate the contract effective as
of the mailing or delivery of the default notice. If the County terminates the contract, the
contractor shall remain liable for performance of all terms, conditions, and obligation through the
date of termination. Termination by the County shall not constitute a waiver by the County of any
other rights or remedies available to the County by law or contract.
28.Certification of Bidder's Experience and Qualifications: The undersigned bidder certifies
that he is, at the time of bidding, and shall be, throughout the period of the contract, licensed by
the State of Georgia to do the type of work required under terms of the contract documents.
Bidder further certifies that he is skilled and regularly engaged in the general class and type of
work called for in the contract documents. The bidder represents that he is competent,
knowledgeable and has special skills on the nature, extent, and inherent conditions of the work
to be performed. Bidder further acknowledges that there are certain peculiar and inherent
conditions existent in the construction of the particular facilities, which may create, during the
construction program, unusual or peculiar unsafe conditions hazardous to persons and property.
Bidder expressly acknowledges that he has the skill and experience to foresee and to adopt
protective measures to adequately and safely perform the construction work with respect to such
hazards.
29.Corporations: All Corporations should provide corporate seal, a copy of the Secretary of State's
Certificate of Incorporation, and a listing of the principals of the corporation with the bid.
30.Pre-Construction Conference: Successful bidder will be required to attend a Pre-Construction
Conference with the owner's representative to discuss any details of the project, submit a
proposed work program/schedule prior to the issuance of a Notice to Proceed. When work
Boiler Repalcement 225 7
Judicial Building Bid Ref. #26-050

begins, contractor shall remain on this project, with normal work force, until the project is
completed.
31.Georgia Security and Immigration Compliance Act: The successful contractor will provide
certification that he is in compliance with the Georgia Security and Immigration Compliance Act,
certifying that the provisions of GA Law, O.C.G.A 13-10-91, Chapter 300-10-1, per the Georgia
Department of Labor, if applicable, have been complied with in full. Pursuant to O.C.G.A 13-10-
90(2), all subcontractors entering into a contract or agreement for hire on this Project must be
registered and participate in the Federal Work Authorization Program. Complete and submit
a copy of the form, applicable to your company, and applicable Subcontractor
Affidavits, with your bid.
32.Contractor's Warranty & Manufacturer Warranty Transfer:
A. Contractor's General Warranty: Contractor shall guarantee all specified work for a period of
one (1) year from the date of written acceptance of the work by the Owner's representative.
This guarantee ensures all materials, labor, and workmanship provided under this contract
are free from defects. At no expense to the County, the Contractor shall repair any defects
reported during this period. Final inspection or payment shall not waive this warranty.
B. Transfer of Manufacturer Warranties: In addition to the General Warranty, the Contractor
shall provide and assign to Dougherty County all rights under the manufacturer's specific
limited warranties for the installed equipment.
C. Warranty Documentation & Registration:
* Registration: Contractor is responsible for completing all factory-required registration,
including the submission of a factory-authorized start-up report to the manufacturer
within thirty (30) days of start-up.
* Delivery: Contractor must provide the County with copies of all executed warranty
certificates and the completed start-up report as a condition of final payment.
* Labor in Year One: While manufacturer warranties typically cover parts only, the
Contractor's one-year General Warranty shall cover all labor and shipping costs associated
with replacing any part that fails within the first year of operation.
33.Bid Submittals (All items listed below must be submitted with bid):
a. Bid Form (attached)
b. Bid Bond
c. Addendum Acknowledgement Form (attached)
The following items should be submitted with bid:
a. Indemnity Agreement
b. Governing Law and Venue Form
c. Certificate of Non-Collusion Form
d. Drug Free Workplace
e. Debarred Bidders Integrity Form
f. Corporate Seal
g. Secretary of State's Certificate of Incorporation
h. Listing of the principals of Corporation
i. Affidavit to Comply with OCGA 13-10-91
34.For additional information, contact Ricky Gladney, Buyer I, at (229) 302-1455. Submit all
questions via email to rgladney@albanyga.gov cc: jswilliams@albanyga.gov and
kross@albanyga.gov. The deadline for questions is May 12, 2026, at 2:30 pm. Replies of
substance will be answered in the form of an addendum and made available to all potential
bidders.
Boiler Repalcement 225 8
Judicial Building Bid Ref. #26-050

SCOPE OF WORK
DOUGHERTY COUNTY
Boiler Replacement
225 Judicial Building
Bid Reference No. 26-050
General Information: This project consists of the removal and replacement of the existing
boiler system at the Dougherty County Judicial Building, located at 225 Pine Avenue. The scope
involves the disposal of two current units and the installation of two (2) new 1,500,000 BTU non-
condensing boilers-specified as Patterson-Kelley Modufire N1500MFD or an approved equal-
along with new circulation pumps, exhaust stacking, and electrical service. The selected
contractor will be responsible for the complete integration of the new units into the existing
water loop and CO monitoring systems, ensuring a fully operational, safe, and efficient heating
system that complies with all state codes and manufacturer specifications.
1. General Requirements
* Removal: Dispose and remove two existing boilers in accordance with local environmental
regulations.
* New Units: Provide and install two (2) new gas-fired, non-condensing, forced-draft
boilers. Units shall be Patterson-Kelley Modufire N1500MFD or Approved Equal meeting
the technical requirements in Section 2.
* Compliance: All equipment must be ASME Section IV certified and comply with ANSI
Z21.13/CSA 4.9.
* Permits: Obtain all required permits and coordinate final inspection with the State
Inspector.
2. Technical Specifications (Performance Requirements)
To be considered an "Approved Equal," any proposed alternative must meet or exceed the
following:
* Input/Output: Minimum 1,500,000 BTU/hr input with a thermal efficiency of at least 85%.
* Turndown Ratio: Minimum 5:1 turndown capability to track varying loads down to 20% of
rated capacity.
* Physical Footprint: Modular, vertical design capable of fitting through a standard 30"
doorway.
* Safety & Control:
o Integrated touch-screen control system with firing rate feedback.
o Low water cut-off (LWCO) and high-limit manual reset thermostat.
o Minimum 80 PSI ASME relief valve kit.
* Venting: Must be compatible with Category II or IV venting systems.
3. Installation & Mechanical Scope
* Pumps: Provide and install two (2) new circulation pumps (e.g., Grundfos or equivalent)
sized for a flow rate of approximately 127.5 GPM at 20 degreesF T.
* Piping: Connect new boilers to the existing hot water supply and return lines; tie into the
existing water loop system.
* Exhaust: Run new exhaust stack per manufacturer requirements.
* Safety Systems:
o Install an emergency stop (E-stop) switch at the exit door.
o Tie into the existing building Carbon Monoxide (CO) monitoring system.
Boiler Repalcement 225 9
Judicial Building Bid Ref. #26-050

4. Electrical & Controls
* Electrical: Run dedicated electrical service to both boilers.
* Disconnects: Install two (2) lockable electrical disconnect switches.
* Integration: Connect boilers to existing building automated controls if applicable.
5. Start-Up & Commissioning
* Testing: Perform factory-authorized start-up, including safety testing and burner tuning
for maximum efficiency.
6. Security Requirements
* Identification: All staff on-site must wear visitors' badges issued by Judicial Court
Services.
* Prohibited Items: Contractors must adhere to strict security screening. Prohibited
items-such as knives, lighters, or firearms-must be left in personal vehicles;
security will not hold these items.
* Access Limitations: Access may be restricted to specific doors or secure service
entrances.
7. Scheduling & Coordination
* Noise Restrictions: Work involving heavy machinery, drilling, or loud noise must be
scheduled outside of active court hours (typically 8:00 a.m. - 5:00 p.m.) to avoid
disrupting official court business.
* Unobstructed Access: The contractor must ensure that building entrances and
corridors remain unobstructed at all times for public and employee use.
* Off-Hours Work: Must be requested in writing 5 business days in advance.
Boiler Repalcement 225 10
Judicial Building Bid Ref. #26-050

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-67655-NONST-2027-000000035

State Government of Georgia

Bid Due: 7/30/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66936-NONST-2026-000000005

State Government of Georgia

Bid Due: 8/11/2026

Follow Repair & Maintain Airfield Stormwater System Phase II Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 8/10/2026

CCSD Request HR rooms remodel HC-08-10-26B rev 0 Columbia County School District PURCHASING

Columbia County School District

Bid Due: 8/10/2026