Alabama State Port Authority
Requisition and Proposal
Project
Name
Supply of Warehouse Roll-Up Doors for Pier A South Refurbishment
Project #: 11717 Task #: 03
To: Prospective Bidders
Please procure the following and deliver to the address below:
Date: February 2026
Delivery of Proposal:
Alabama State Port Authority (ASPA)
Location identified below in Note #1
Delivery of Performance of Work:
Alabama State Port Authority Main Docks
Pier A South Warehouse Roll-up Doors
Mobile, AL
Description of Work
This Requisition solicits proposals for the supply and delivery of warehouse roll-up doors in
accordance with the attached contract requirements, reference drawings and technical specifications.
The delivery location is within the ASPA Main Docks facility in Mobile, AL. All work shall be in
accordance with the requirements stated herein, Insurance Requirements and applicable State of
Alabama and Federal Laws.
The work consists principally of the supply and delivery of warehouse roll-up doors to the ASPA Main
Docks facility in Mobile, AL. All materials shall be delivered to the ASPA Main Docks, Warehouse A
South. Delivery drivers shall have TWIC credentials or obtain a TWIC Escort prior to arrival. Port
personnel and equipment will be provided to unload and stockpile the material. All areas of the ASPA
Main Docks are restricted access facilities and require valid Port Access Credentials for entry. All costs
associated with the delivery of the material to the Port shall be included in the bidder proposal.
All bidders submitting bids are to carefully examine the attached reference drawing (4737-S2-Rev A),
technical specifications and contract requirements prior to submission of a bid proposal. Each Bidder
shall satisfy oneself as to the character, quality, and quantities of work to be performed, and as to the
requirements of the proposed contract. The submission of a proposal shall be proof that the bidder
has made such examination and is satisfied as to the conditions to be encountered in performing the
work and as to the requirements of the proposed Contract. The bidder shall not be entitled to any
additional compensation for any work or expense resulting from the neglect of verifying all stipulated
contract requirements.
Per the technical specifications, the bidder is required to submit a delivery schedule with the bid. All
items as shown on the referenced drawings, and as specified, shall be completely delivered to the
project site and stockpiled by the supplier in an area to be determined by the Owner. The successful
bidder will be required to complete the delivery under the contract per the dates outlined in their
submitted delivery schedule. Failure to deliver within the specified time period will initiate liquidated
damages in the amount of $500.00 per calendar day, exclusive of Sundays and National holidays.
The successful bidder will be required to furnish a Performance Bond and Certificate of Insurance in
an acceptable form. Performance Bond shall be in an amount equal to 100% of the contract price;
Certificate of Insurance shall be as per the attached requirements and countersigned by a licensed
resident agent in the State of Alabama.
Form ENG-FR-003 R&P Template
Last Revised 1/31/12
Alabama State Port Authority
Requisition and Proposal
Project
Name
Supply of Warehouse Roll-Up Doors for Pier A South Refurbishment
Project #: 11717 Task #: 03
The bidder shall comply with all Federal and State laws, local ordinances and regulations, and all
orders and decrees of bodies or tribunals having any jurisdiction or authority, which in any manner
affect those engaged or employed on the work, or which in any way affect the conduct of the work.
The Alabama State Port Authority will utilize its sales tax exemption status on this supply project.
Partial payments may be made to the extent of the delivered cost of materials to be incorporated in
the work, provided that such materials meet the requirements of the Contract, plans, and
specifications and are delivered to acceptable sites on the OWNER's property or at other sites in the
vicinity that are acceptable to the OWNER. Such delivered costs of stored or stockpiled materials may
be included in the next partial payment after the following conditions are met:
(a) The material has been stored or stockpiled in a manner acceptable to the Engineer at or on
an approved site.
(b) The Contractor has furnished the Engineer with acceptable evidence of the quantity and
quality of such stored or stockpiled materials.
(c) The Contractor has furnished the Engineer with satisfactory evidence that the material and
transportation costs have been paid.
(d) The Contractor has furnished the OWNER legal title (free of liens or encumbrances of any
kind) to the material so stored or stockpiled.
It is understood and agreed that the OWNER's payment for such stored or stockpiled materials shall in
no way relieve the Contractor of his responsibility for furnishing and placing such materials in
accordance with the requirements of the Contract, plans, and specifications.
IMPORTANT NOTICE TO BIDDERS REGARDING ACCESS TO ASPA RESTRICTED FACILITIES:
The Alabama State Port Authority’s Access Policy is provided on the ASPA website and in the link
below:
https://alports.com/port-access/
IMPORTANT NOTICE TO BIDDERS REGARDING EMPLOYMENT PRACTICES:
Effective October 1, 2011, the Beason-Hammon Alabama Taxpayer and Citizen Protection Act (“the
Act”) requires that any business entity contracting with or providing any grant or incentives to the
state, including the Alabama State Port Authority, certify compliance with the Act. All Bidders must
certify such compliance by executing the enclosed Certificate of Compliance and returning it to the
Alabama State Port Authority with your bid package along with proof of the contractor’s enrollment
in the e-verify program. The following E-Verify website link is provided for convenience:
http://www.dhs.gov/files/programs/gc_1185221678150.shtm
Form ENG-FR-003 R&P Template
Last Revised 1/31/12
Alabama State Port Authority
Requisition and Proposal
Project
Name
Supply of Warehouse Roll-Up Doors for Pier A South Refurbishment
Project #: 11717 Task #: 03
Contractor’s Proposal
The Contractor hereby agrees to perform the specified work for the prices outlined in the following
schedule. The quantities listed may be increased or decreased during project execution. In the event the
quantities change, the unit price shall apply according to scope of work. All items listed shall be
performed in accordance with this requisition and proposal and all referenced documents.
Description
Est
UOM Unit Price
Qty
Value
1. Bonds, Insurance & Port Access Credentials
1
LS
LS
$ ___________
2. Furnish roll-up doors at Pier A South with all
associated hardware per the attached Scope of
Work & Equipment specifications.
6
EA
EA
$ ___________
TOTAL BID
$ ___________
NOTES:
1. Sealed bid proposals will be received via courier to the Alabama State Port Authority, 1400 Alabama
State Docks Blvd, Suite 216, Administration Building, Mobile, AL 36602 by 1:30 P.M. on Friday,
February 20, 2026. Sealed bid proposals can also be hand delivered to the Killian Room starting at 15
minutes prior to the official bid opening at 2:00 PM on Friday, February 20, 2026 at the Alabama
State Port Authority in the International Trade Center building, 250 North Water Street, 1st floor—
Killian Room, Mobile, AL. No bids will be accepted after 2:00 P.M. No faxed or electronic bids will be
accepted. Conditional bids will not be accepted.
2. Bid proposals must be submitted in sealed envelopes with the words “Bid Document Enclosed”
clearly marked on the outside of the envelope. Sealed bids shall have the bidder’s name, project
name, and time and date of bid opening shown on the outside of the envelope.
3. A Bid Bond or Certified Check made payable to the Alabama State Port Authority and equal to five
percent (5%) of the amount bid, not to exceed $10,000, must accompany the Bid Proposal.
4. The proposals shall be filled in ink on the form provided herein and all blank spaces in the form shall
be fully filled. The Contractor’s signature shall be in long hand and the complete form shall be
without interlineations, alteration or erasure.
5. Technical questions regarding this proposal should be directed to Mr. Jamie Johnson, at Aptim Port
Services at Jamie.johnson@aptim.com . Questions on procurement should be directed to Sean Kelly,
P.E., Associate Professional Facilities Engineer at sean.kelly@alports.com .
6. All questions about the meaning or intent of the Contract documents shall be submitted to the
Engineer in writing. Replies will be issued by Addenda to all parties recorded as having received the
bidding documents. All addenda so issued shall become part of the Contract documents. Only
questions answered by formal written addenda will be binding. Oral and other interpretations or
clarifications will be without legal effect. The last day for questions shall be (7) days prior to the bid
opening, Friday, February 13, 2026.
Form ENG-FR-003 R&P Template
Last Revised 1/31/12
Alabama State Port Authority
Requisition and Proposal
Project
Name
Supply of Warehouse Roll-Up Doors for Pier A South Refurbishment
Project #: 11717 Task #: 03
7. Authority reserves the right to refuse to issue a proposal form or a contract to a prospective bidder
for any of the following reasons:
a) Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contract
in force with the Authority.
b) Contractor default under previous Contract with the Authority.
c) Proposal withdrawal or Bid Bond forfeiture on previous project with the Authority.
d) Unsatisfactory work on previous contract with the Authority.
e) Lack of competency, past experience, adequate machinery or lack of personnel.
8. The Owner may terminate the contract, or any portion thereof, for just cause by written notice to
the Contractor. If the contract, or any portion thereof, is terminated before completion of all items
of work in the contract, payment will be made for the actual number of units or items of work
completed or started. No claims for loss of anticipated profits will be considered.
9. The right is reserved, as the interest of the Alabama State Port Authority may require, to reject any
and all bids and to waive informalities in bids received.
10. The Alabama State Port Authority will utilize its sales tax exemption status on this supply project.
SIGNATURES
Receipt of following addendums is acknowledged:
Addendum No. _________________
Addendum No. _________________
Addendum No. _________________
REFERENCED DOCUMENTS
• Alabama State Port Authority – Insurance Requirements for Contract Work
• Certificate of Compliance with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act
• Attached Technical Specifications
• Attached Reference Drawings: 4737-S2-Rev A
Form ENG-FR-003 R&P Template
Last Revised 1/31/12
Alabama State Port Authority
Requisition and Proposal
Project
Name
Supply of Warehouse Roll-Up Doors for Pier A South Refurbishment
Project #: 11717 Task #: 03
•
Contractor’s Signature:
Contractor
Company___________________________________________________________________
___________________________________ __________________________________
____________
Name
Title
Date
Signature of Party Originating Requisition:
Sean Kelly, P.E.
Date
Associate Professional Facilities Engineer
Form ENG-FR-003 R&P Template
Last Revised 1/31/12
This page summarizes the opportunity, including an overview and a preview of the attached documents.