Bid No. 25-26-16I Don Lugo High School MPR Refresh
| Agency: | Chino Valley Unified School District |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 25, 2026 |
| Due Date: | Apr 1, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Attachment Preview
Chino Valley Unified School District
Scope of Work for
Don Lugo HS MPR Refresh
Estimated Construction Costs: $125,000.00
Allowance: $12,500.00
Contractor Duration: 45 Days
CSLB: Class A or Class B
The successful contractor shall supply all labor, materials, services, insurance, and equipment necessary
to complete the work. The Contractor shall thoroughly investigate the premises for a complete
understanding of the scope of work required for this bid. All materials identified herein are to be
used by the contractor.
Demolition:
* Demolish and dispose of existing flooring materials - carpet and walk off tile.
Demolish carpet at base of AV room.
o
Demolish all baseboards.
o
Demolish carpet on stairs.
o
* Demolish owner identified surface mounted raceway, conduits, and outlets.
* Demolish existing ceiling tiles, leaving ceiling tile grid system in place.
Safe off all ceiling devices and salvage for reinstallation.
o
* Demolish and dispose of owner identified ceiling light diffusers.
* Demolish existing water fountains and water fountain area tiles.
Safe off water prior to demo, and prep for reconnection.
o
* Remove and replace all 1-gang outlets and related covers.
Style and color to be approved by owner.
o
* Remove and replace all other junction boxes, phones, and/or data drop cover plates.
Style and color to be approved by owner.
o
* Remove & replace emergency exit sign at south facing doors.
Materials - Compass LED Lighted Exit Sign, White, Mfr. Model #CCRGRC.
o
Refurbishment
* Prepare and paint existing ceiling tile grid.
Preparation of areas for painting includes removal of staples, tape, and other debris so as
o
to make a clean, flat paintable surface.
Paint color for ceiling gride - Vista Beryl Pearl VP 0509 Eggshell
o
* Prepare and paint railing, ceiling trim window trim, and mechanical ducting.
Paint color for trim and ducting - DunnEdwards Chocolate Chunk DE6070 Semi
o
* Prepare and paint doors and doorframes, interior and exterior, of all doors.
Paint dolor for doors and frames - Dunn Edwards Chocolate Chunk DE6070 Semi
o
Chino Valley Unified School District
Scope of Work for
Don Lugo HS MPR Refresh
* Prepare and paint exterior of sound booth, MPR windowsills, and side stage CMU walls.
Paint color for sound booth, sills, and walls - Vista Beryl Pearl VP 0509 Eggshell
o
* Prepare and paint existing glue-up ceiling tiles
Paint color for 12" x 12" ceiling tile - Vista Beryl Pearl VP 0509 Eggshell
o
* Replace owner identified ceiling light diffusers.
Identified - two 2'x4' and two 2'x2' diffusers
o
Use Duralens Lighting Panels to match onsite diffusers.
* Install new 24" x 48" ceiling tiles - Include preparation of ceiling tiles for reinstallation of existing
devices.
Materials - Armstrong Dune 2nd Look White
o
* Prepare floor for new flooring - square carpet tiles.
Prepare with Ardex or equivalent floor leveler as necessary.
o
* Install new 24" x 24" carpet tiles - Mohawk Flooring.
Materials - Mohawk, Taking Steps, 858 LI, GT465
o
Install warning stripes across all stage steps.
o
* Install new baseboards around entire room.
Materials - Johnsonite, Fudge, 167
o
* Install new 24" x 24" carpet tiles - Mohawk Flooring.
Materials - Mohawk, Taking Steps, 858 LI, GT465
o
* Install 24" x 24" walk-off carpet tiles at all doors, and at both drinking fountains
Materials - Mohawk, First Step II, GT315
o
* Prepare walls for installation of new tile at both drinking fountain locations.
Materials - Dal Tile - Fabrique Creme Linen, P686.
o
* Prepare walls for installation of new drinking fountains. All connections, as well as water
restoration, to be performed by the contractor.
Materials - Murdock, M-OBR4-GRD, Outdoor Bottle Filler with Bi-Level Drinking Fountain.
o
See Also
Basic Information Title Request for Information (RFI) #26-004 - CBC Online Modernization/Replacement Agency
State Government of California
Due by 9/28/2026
Project: RFP- As-Needed Unit Turnover Flooring Services Ref. #: 2026-RFP-AHA-PO-004 Department: Property Operations
Housing Authority of the City of Alameda
Due by 10/14/2026
Bid Solicitation # UD-26-356 Bid Solicitation # UD-26-356 Organization Name Long Beach Utilities
City of Long Beach
Due by 9/24/2026
26-0036 - RFP_26-0036_FSAPS - Closing: 10/30/2026 12:00 PM Status Stage Open Posted 7/29/2026
City of Los Angeles
Due by 10/30/2026