Bid No. 25-26-20F Marshall ES, Walnut ES & Magnolia JHS - Painting Project Addendum 1

Agency: Chino Valley Unified School District
State: California
Type of Government: State & Local
NAICS Category:
  • 238320 - Painting and Wall Covering Contractors
Posted Date: May 11, 2026
Due Date: May 15, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
  • Bid No. 25-26-20F Marshall ES, Walnut ES & Magnolia JHS - Painting Project

    Notice Inviting Formal Bids

    Bid Documents

    Scope of Work

    Planholders List

    Addendum 1

  • Attachment Preview

    Chino Valley Unified School District
    Scope of Work for
    Marshall ES, Walnut ES, and Magnolia JHS
    Painting Project
    Contractors Class: B or C33
    Estimated Construction Cost:
    Marshall ES $150,000.00
    Walnut ES $150,000.00
    Magnolia JHS $150,000.00
    Allowance: $25,000.000 per school site
    Project Duration: 120 Calendar Days
    The successful contractor shall supply all labor, materials, services, insurance, and equipment necessary to complete the
    work. The Contractor shall thoroughly investigate the premises for a complete understanding of the scope of work required
    for this bid.
    Awarded contractor will be responsible for leaving the school campus clean at the end of each visit and
    removal/haul away debris.
    Awarded contractor will be responsible to fence off and secure work area.
    All work needs to be completed after regular school hours and/or weekends.
    o Work hours can be adjusted when schools are out of session (i.e. school holidays)
    o Awarded contractor will be supplied school calendars for each site relating to holiday, early releases, etc.
    Sites have electronic locks, awarded contractor needs to protector those locks prior to pressure washing and any
    spray painting.
    Sites have security cameras and network access points attached to the exterior buildings those need to be
    protected when pressure washing and any spray painting.
    First Responder Signs (white signs with a letter), those signs need to be removed prior to painting and reinstalled at
    the completion.
    All banners and signage will need to be removed prior to painting.
    Please paint in-between the buildings/portables
    Page 1 of 36

    Marshall Elementary School Painting Specifications
    Site Specific Colors from Dunn Edwards (specific paint codes will be provided to awarded contractor)
    Dunn Edwards North to Alaska Evershield Eggshell
    o Used for walls
    Dunn Edwards Nautical Aristoshield Semi-Gloss
    o Used for doors (interior & exterior), door frames, windows, railing
    Dunn Edwards Charcoal Smudge Asirtoshield Semi-Gloss
    o Used for fascia
    Dunn Edwards Black
    o Used for wrought iron gates
    PART 1 - GENERAL
    1.1 SUMMARY
    A. Section includes surface preparation and the application of paint systems on
    1. Exterior substrates
    2. The following Exterior substrates:
    Concrete
    Steel
    Galvanized metal Wood
    Concrete masonry units (CMU)
    B. The location of the work to be performed is:
    E.J. Marshall Elementary
    12045 Telephone Ave
    Chino, CA 91710
    1.2 DEFINITIONS
    A. Gloss Level 1: Not more than 5 units at 60 degrees and 10 units at 85 degrees, according to ASTM D 523.
    B. Gloss Level 2: Not more than 10 units at 60 degrees and 35 units at 85 degrees, according to ASTM D 523
    C. Gloss Level 3: 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees, according to ASTM D 523.
    D. Gloss Level 4: 20 to 35 units at 60 degrees and not less than 35 units at 85 degrees, according to ASTM D
    523.
    E. Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D 523.
    F. Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D 523.
    G. Gloss Level 7: More than 85 units at 60 degrees, according to ASTM D 523.
    H. EG: Ethylene Glycol. Ethylene glycol is listed as a hazardous air pollutant (HAP) by the U.S. EPA
    I. Blocking: Two painted surfaces sticking together such as a painted door sticking to a painted jamb.
    J. RAVOC: Reactivity adjusted VOC 'Reactivity' means the ability of a VOC to promote ozone formation.
    K. PDCA: Painting & Decorating Contractors of America www.pdca.org
    L. SSPC: Scopes of SSPC Surface Preparation Standards and Specifications. www.sspc.org
    M. Owner - usage of the term "Owner" shall be construed to mean the actual owner of the Property or a duly
    authorized representative of the owner.
    N. Property - usage of the term "Property" shall be construed to mean the property location identified in paragraph
    1.1 B. 1. of this specification at which location the work shall be performed.
    O. Painting Contractor - usage of the term "Contractor" shall be construed to mean the 3rd party contractor
    performing the painting portion of the project.
    Page 2 of 36

    1.3 ACTION SUBMITTALS
    A. Product Data: For each type of product. Include preparation requirements and application instructions.
    B. Samples for Initial Selection: For each type of topcoat product.
    C. Samples for Verification: For each type of paint system and each color and gloss of topcoat.
    1. Submit Samples on rigid backing, no smaller than 7 inches by 10 inches (177.8 mm by 254 mm) or
    larger than 8.5 inches by 11 inches (215.9 mm by 279.4 mm).
    2. Label each Sample for project, owner's agent, general contractor, painting contractor, paint color name
    and number, paint brand name, 'P' number if applicable, and application area.
    D. Product List: For each product indicated, include the following:
    1. Cross-reference to paint system and locations of application areas.
    2. VOC content.
    1.4 MAINTENANCE MATERIAL SUBMITTALS
    A. Furnish extra materials from the same product run that match products installed and that are packaged with
    protective covering for storage and identified with labels describing contents.
    1. Ten [10] percent, but not less than [1 gal. (3.8 L)] of each material and color applied.
    1.5 QUALITY ASSURANCE
    A. Mockups: Apply mockups of each paint system indicated and each color and finish selected to verify
    preliminary selections made under Sample submittals and to demonstrate aesthetic effects and set quality
    standards for materials and execution.
    1. Owner's agent will select one surface to represent surfaces and conditions for application of each paint
    system specified in Part 3.
    a. Vertical and Horizontal Surfaces: Provide samples of at least 100 sq. ft. (9 sq. m).
    b. Other Items: owner's agent will designate items or areas required.
    2. Final approval of color selections will be based on mockups.
    a. If preliminary color selections are not approved, apply additional mockups of additional colors
    selected by owner's agent at a cost to be agreed upon by Contractor and Owner.
    3. Approval of mockups does not constitute approval of deviations from the paint systems indicated unless
    owner's agent specifically approves such deviations in writing.
    4. Subject to compliance with requirements, approved mockups may become part of the completed Work if
    undisturbed at time of Substantial Completion.
    1.6 DELIVERY, STORAGE, AND HANDLING
    A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures
    continuously maintained at not less than 45 deg F (7 deg C) or more than 120 deg F (49 deg C).
    1. Maintain containers in clean condition, free of foreign materials and residue.
    2. Remove rags and waste from storage areas daily.
    1.7 FIELD CONDITIONS
    A. Surfaces must be clean and moisture free. Prime and paint as soon as possible. Do not apply paints in snow,
    rain, fog, or mist. No painting shall be done immediately after rain or foggy weather or when the temperature is
    below 50 degreesF. Substrate temperature must be 5 degreesF or more above dew point temperature while painting and
    during the coating's cure time. Avoid painting surfaces while they are exposed to a full, hot sun.
    Page 3 of 36

    B. Painting contractor should follow proper painting practices and exercise judgment based on his or her
    experience and project specific conditions as to when to proceed.
    C. WIND VELOCITY: Excessive wind velocity can seriously impair spray application, resulting in significant
    material loss, low film build, excessive dry spray or overspray, plus the possibility of depositing airborne spray
    mist on unprotected surfaces downwind from the work. Some of these adverse effects can be compensated for
    by material and equipment adjustments if winds are not too high. Generally speaking, wind velocity 15 m.p.h. or
    higher can cause sufficient spray application problems, in which case suspending work until conditions improve
    should be considered.
    PART 2: PRODUCTS
    2.1 MANUFACTURERS
    A. Basis-of-Design Product: Subject to compliance with requirements, provide products manufactured or
    distributed by the Dunn-Edwards Corporation.
    2.2 PAINT, GENERAL
    A. Material Compatibility:
    1. Provide materials for use within each paint system that are compatible with one another and substrates
    indicated, under conditions of service and application as demonstrated by manufacturer, based on
    testing and field experience.
    2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat
    for use in paint system and on substrate indicated.
    B. VOC Content: Provide materials that comply with VOC limits of authorities having jurisdiction.
    C. Colorants: The use of colorants containing hazardous chemicals, such as ethylene glycol, is prohibited.
    D. Colors: As Selected by owner's agent from manufacturer's full range.
    1. Where color is selected prior to bid submittal, Contractor shall bid [one (1)], [two (2)], or more finish
    coats, as appropriate to the color selected, and shall expressly state number of finish and prime coats
    and type (full or spot) of prime coat.
    2. When the final color has not been selected prior to bid submittal, Contractor may need to bid additional
    coats when submitting their bid. The Owner should be aware that if a color is chosen following the bid
    process and the color is significantly different from original color, a change order for an additional finish
    coat might be required.
    2.3 SOURCE QUALITY CONTROL
    A. Testing of Paint Materials: Owner reserves the right to invoke the following procedure.
    1. Owner may engage the services of a qualified testing agency to sample paint materials. Contractor will
    be notified in advance and may be present when samples are taken. If paint materials have already
    been delivered to Project site, samples may be taken at Project site. Samples will be identified, sealed,
    and certified by testing agency.
    2. Testing agency will perform tests for compliance with product requirements.
    3. Owner may direct Contractor to stop applying paints if test results show materials being used do not
    comply with product requirements. Contractor shall remove non- complying paint materials from
    Project site, pay for testing, and repaint surfaces painted with rejected materials. Contractor will
    comply with requirements to use compatible products and systems as described in Paragraph 2.2.A.
    Contractor will be required to remove rejected materials from previously painted surfaces if, on
    repainting with complying materials, the two paints are incompatible.
    Page 4 of 36

    PART 3 - EXECUTION
    3.1 EXAMINATION
    A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum
    moisture content and other conditions affecting performance of the Work.
    B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:
    Interior Substrates:
    1. Concrete: 11 percent or less.
    2. Masonry (Clay and CMU): 11 percent or less.
    3. Wood: 8 percent or less.
    4. Plaster: 5 percent or less.
    5. Gypsum Board: 5 percent or less.
    Exterior Substrates:
    1. Concrete: 11 percent or less.
    2. Masonry (Clay and CMU): 11 percent or less.
    3. Wood: 15 percent or less.
    4. Plaster: 5 percent or less.
    C. Portland Cement Plaster Substrates: Verify that plaster is fully cured, including pH testing to determine that
    alkalinity is within limits established by the manufacturer.
    D. Interior and/or exterior Gypsum Board Substrates: Verify that finishing compound is sanded smooth.
    E. Concrete floors require a calcium chloride test to measure hydrostatic pressure. Consult floor coating
    manufacturer with test results prior to beginning surface preparation.
    F. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.
    G. Proceed with coating application only after unsatisfactory conditions have been corrected.
    1. Application of coating indicates acceptance of surfaces and conditions.
    3.2 PREPARATION
    A. Comply with manufacturer's written instructions applicable to substrates and paint systems indicated.
    B. Scraping or sanding surfaces of older buildings (especially pre-1978) may release dust containing lead or
    asbestos. EXPOSURE TO LEAD OR ASBESTOS CAN BE VERY HAZARDOUS TO YOUR HEALTH. Always
    wear appropriate personal protective equipment during surface preparation, and finish cleanup of any residues
    by water- washing all surfaces. For more information, see Dunn-Edwards brochure on "Surface Preparation
    Safety" or call EPA's National Lead Information Hotline at 1-800-424-LEAD, or visit www.epa.gov/lead
    or/asbestos, or contact your state or local Health Department.
    C. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be
    painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied
    protection before surface preparation and painting.
    1. After completing painting operations, use workers skilled in the trades involved to reinstall items that
    were removed. Remove surface-applied protection.
    D. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and
    incompatible paints and encapsulants.
    1. Remove incompatible primers and re-prime substrate with compatible primers or apply bond coat as
    required to produce paint systems indicated.
    E. Where mildew is present, remove mildew by scrubbing with a commercial mildew remover, or, with a
    solution of one (1) part household bleach mixed in three (3) parts water by volume. The solution should be left
    on the surface for a minimum of twenty (20) minutes, rinsed thoroughly with clean water to remove any residue,
    and then allowed to dry completely prior to application of patching/caulking/prime/finish coat systems.
    Page 5 of 36

    F. Moisture: All areas that may cause paint failure due to moisture shall be addressed and eliminated. This would
    include, but is not limited to:
    1. Gutters and downspouts not working properly.
    2. Previous coats of paint not adhering properly.
    3. Wood checking (cracks and splits in wood).
    4. Deteriorated caulking.
    5. Gaps between substrates.
    6. Rotten wood.
    7. Areas affected by water splashing.
    8. Painting in inclement weather.
    9. Painting a substrate where residual moisture exceeds limits stated in 3.1.B.
    10. Un-caulked nail holes.
    G. Pressure washing and surface preparation methods
    1. Pressure wash or water blast to remove oil, grease, dirt, loose mill scale, and loose paint at pressures
    of 2500-3500 p.s.i. at a flow of 3.0-3.5 gallons per minute. This is the recommended standard for
    optimal efficiency.
    H. Prior to application of prime/finish interior and/or exterior coat systems, provide a clean, sound surface free of
    dust, dirt contaminants, mildew and efflorescence by use of a power wash and hand scraping or use of
    mechanical grinders where necessary. Additionally, areas are to be scrubbed with a bristle brush to insure
    complete removal of any residual salts. Remove all labels, stickers, price tags, etc. from surfaces before
    priming. Wood areas stamped with ink codes must be spot primed with blocking primers. Power wash areas to
    be coated to ensure that new salt deposits do not occur. Failure to do so may cause adhesion issues or result
    in delamination and invalidate any manufacturer warranty given or implied. After cleaning if there is still chalk
    evident, this condition must be brought to the owner's attention in writing before any further work is done.
    I. Cementitious Substrates: (concrete, stucco, masonry) Remove release agents, curing compounds,
    efflorescence, and chalk. Do not paint surfaces if moisture content or alkalinity of surfaces to be painted
    exceeds that permitted in manufacturer's written instructions.
    1. Wire brush all loose and peeling paint and dust all surfaces before spot priming or applying finish coats.
    Industry standards apply to applications of cracks, voids, and repairs. Any areas of repair shall be
    patched and dried before coatings are applied. Cracks should be repaired as follows: 1. Cracks less
    than 14" wide should be filled using Dunn-Edwards Brush Grade Elastomeric Patch. 2. Cracks wider
    than 14" should be cut and scraped to a "V" shape and filled with Dunn-Edwards Trowel Grade
    Elastomeric Patch. Large cracks and holes may require repeated applications of patching materials to
    bring flush with adjacent substrate. Feather-in all repairs and caulking to blend with adjacent substrate.
    2. Large holes in stucco / plaster/ concrete will be patched with Rapid Set Premium Stucco Patch or
    Rapid Set Wunderfixx Concrete Patching Compound in appropriate texture to blend with existing
    texture. Allow stucco patch to cure to acceptable pH level (10) prior to application of prime/finish coat
    systems. Caulk large cracks in stucco / plaster/ cement with GE-Life Time 920.
    3. Spot prime over all patched areas, cracks, and holes then use appropriate topping material to match
    existing surface level and texure.
    J. All Steel Substrates: Remove rust, loose mill scale, and shop primer if any. Clean using methods
    recommended in writing.
    a. SSPC-SP 1, "Solvent Cleaning."
    b. SSPC-SP 2, "Hand Tool Cleaning."
    c. SSPC-SP 3, "Power Tool Cleaning."
    1. All ferrous metals should be thoroughly cleaned and all loose rust or mill scale be removed by wire
    brush, scraper and/or power tool, such as an electric drill with a wire brush attachment. Any rust spots
    or bare metal should receive the appropriate prime coat. Rust inhibited primer to be applied on all
    properly prepared surfaces where rust is evident. Any hard, glossy surfaces should be dulled.
    Page 6 of 36

    Previously painted ferrous metal in sound condition should be washed down with a strong detergent-
    type cleaner such as Krud-Kutter or Simple Green.
    2. Shop-Primed Steel Substrates: Clean field welds, bolted connections, and abraded areas of shop
    paint, and paint exposed areas with the same material as used for shop priming to comply with SSPC-
    PA 1 for touching up shop-primed surfaces.
    3. Galvanized-Metal Substrates: Remove grease and oil residue from galvanized sheet metal by
    mechanical methods to produce clean, lightly etched surfaces that promote adhesion of subsequently
    applied paints.
    a. All galvanized gutters and flashing should be thoroughly cleaned to remove lose and
    peeling paint.
    b. Any bare galvanized metal should be wiped down with a non-petroleum solvent cleaner.
    c. Prime bare metal with the specified galvanized metal primer.
    d. Any rust on galvanized metal must be removed. Clean to bare metal and apply a rust
    inhibitive primer.
    4. Aluminum Substrates: Remove loose surface oxidation.
    K. Wood Substrates:
    1. All deteriorated or delaminated substrates (i.e. wood, hardboard siding, T1-11) shall be replaced.
    Scrape and clean knots. Before applying primer, apply coat of knot sealer recommended in writing
    by topcoat manufacturer for interior and/or exterior use in paint system indicated.
    2. Sand and dust surfaces that will be exposed to view.
    3. Prime edges, ends, faces, undersides, and backsides of wood.
    4. After priming, fill holes and imperfections in the finish surfaces with putty or plastic wood filler. Sand
    smooth when dried.
    5. Spot prime all patched and filled areas as well as any new wood with the appropriate primer or sealer
    as stated in the Finish Schedule.
    3.3 APPLICATION
    A. Apply paints according to manufacturer's written instructions and recommendations.
    1. Use applicators and techniques suited for paint and substrate indicated.
    2. The number of coats scheduled is the minimum number of coats required. Additional coat(s) shall be
    applied at no additional cost to the Owner, to completely hide base material, provide uniform color,
    and to produce satisfactory finish results.
    3. Apply coatings without thinning except as specifically required by label directions, or required by these
    specifications. In such cases, thinning shall be the minimum reduction permitted.
    4. Paint surfaces behind movable items same as similar exposed surfaces. Before final installation, paint
    surfaces behind permanently fixed items with prime coat only.
    5. Paint both sides and edges of interior and/or exterior doors and entire exposed surface of interior
    and/or exterior door frames.
    6. Paint entire exposed surface of window frames and sashes.
    7. Do not paint over labels of independent testing agencies or equipment name, identification,
    performance rating, or nomenclature plates.
    8. Priming may not be required on items delivered with prime or shop coats, unless otherwise specified.
    Touch up prime coats applied by others as required ensuring an even primed surface before applying
    finish coat.
    B. Tint undercoats same color as topcoat, but tint each undercoat a lighter shade to facilitate identification of each
    coat if multiple coats of same material are to be applied. Provide sufficient difference in shade of undercoats to
    distinguish each separate coat.
    C. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform
    paint finish, color, and appearance.
    Page 7 of 36

    D. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking,
    runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.
    E. Painting Fire Suppression, Plumbing, HVAC, Electrical, Communication, and Electronic Safety and Security
    Work:
    1. Paint the following work where exposed to view:
    a. Equipment, including panel boards.
    b. Uninsulated metal piping.
    c. Uninsulated plastic piping.
    d. Pipe hangers and supports.
    e. Metal conduit.
    f. Plastic conduit.
    g. Tanks that do not have factory-applied final finishes.
    3.4 FIELD QUALITY CONTROL
    A. Dry Film Thickness Testing: Owner may engage the services of a qualified testing and inspecting agency to
    inspect and test paint for dry film thickness.
    1. Contractor shall touch up and restore painted surfaces damaged by testing.
    2. If test results show that dry film thickness of applied paint does not comply with paint manufacturer's
    written recommendations, Contractor shall pay for testing and apply additional coats as needed to
    provide dry film thickness that complies with paint manufacturer's written recommendations.
    3.5 CLEANING AND PROTECTION
    A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.
    B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping,
    or other methods. Do not scratch or damage adjacent finished surfaces.
    C. Protect work of other trades against damage from paint application. Correct damage to work of other trades
    by cleaning, repairing, replacing, and refinishing, as approved by owner's agent, and leave in an undamaged
    condition.
    D. At completion of activities of other trades, touch up and restore damaged or defaced painted surfaces.
    3.6 EXTERIOR PAINTING SCHEDULE
    A. Prepare, paint and finish all surfaces specified and agreed upon.
    B. Provide paint finishes of even uniform color, free from cloudy or muddled appearance. Properly correct all non-
    complying work to the satisfaction of owner and owner's representative and the representative of the paint
    manufacturer.
    C. Paint application finish schedule:
    CHAINLINK FENCE METAL DOORS, MONUMENT SIGN, STORAGE CONTAINER, METAL FLASHINGS
    Spot Prime: ENDURAPRIME, Interior/Exterior Galvanized Metal Primer(ENGM00)
    First Coat: ENDURA-COAT, Interior/Exterior Semi-Gloss Industrial Maintenance Coating (ENCT50)
    Second Coat: ENDURA-COAT, Interior/Exterior Semi-Gloss Industrial Maintenance Coating (ENCT50)
    CINDERBLOCK AND STUCCO, MAIN BODY
    Spot Prime: EFF-STOP Premium, Masonry Primer/Sealer (ESPR00)
    First Coat: EVERSHIELD, Exterior Velvet Paint (EVSH20)
    Second Coat: EVERSHIELD, Exterior Velvet Paint (EVSH20)
    Page 8 of 36

    PORTABLE RAMPS
    Spot Prime: RUST-PORCH & FLOOR ANTISKID
    First Coat: RUST-PORCH & FLOOR ANTISKID
    DOORS (INTERIOR/EXTERIOR), METAL POST
    Spot Prime: ENDURAPRIME, Interior/Exterior Acrylic Rust Preventative Metal Primer(ENPR00)
    First Coat: ENDURA-COAT, Interior/Exterior Semi-Gloss Industrial Maintenance Coating (ENCT50)
    Second Coat: ENDURA-COAT, Interior/Exterior Semi-Gloss Industrial Maintenance Coating (ENCT50)
    END OF PAINTING SPECIFICATION FOR MARSHALL ES
    MARSHAL ES - SITE PHOTOS
    Doors & Lettering "EJ MARSHALL ELEMENTARY
    SCHOOL" needs to be painted Nautical
    wrought iron gates - Black
    Walls - North to Aaska
    Page 9 of 36

    Lunch Shelter Roof - North to Alaska
    Lunch Shelter
    Posts and gutters - painted Nautical
    Storage Containers -
    North to Alaska
    Page 10 of 36

    This page summarizes the opportunity, including an overview and a preview of the attached documents.
    * Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

    Sign-up for a Free Trial, Government Bid Alerts

    With Free Trial, you can:

    You will have a full access to bids, website, and receive daily bid report via email and web.

    Try One Week FREE Now

    See Also

    Follow REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG), BASE TONGUE

    HOMELAND SECURITY, DEPARTMENT OF

    Bid Due: 7/31/2026

    Follow Replace Corroded Cleat on Base Alameda Pier Active Contract Opportunity Notice ID

    HOMELAND SECURITY, DEPARTMENT OF

    Bid Due: 7/31/2026

    RFx Name: BPM013297 RFx Begin Date (UTC+0): RFQ - AS-NEEDED PAVEMENT CRACK SEALING

    County of San Diego

    Bid Due: 8/10/2026

    Bid Number: 1706261 Bid Title: RFQ/P DPW 2026-008 for CMAR Services for Sempervirens

    Humboldt County

    Bid Due: 7/27/2026