Bid No. 25-26-14F Cortez Elementary School - Waterline Replacement

Agency: Chino Valley Unified School District
State: California
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: Mar 31, 2026
Due Date: Apr 16, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
  • Bid No. 25-26-14F Cortez Elementary School - Waterline Replacement

    Notice Inviting Formal Bids

    Specs

    Drawings

  • Attachment Preview

    PROJECT MANUAL
    FOR
    INCTOERRITOERZ TEELNEAMNETN TIMAPRRYO SVCEHMOEONLTS
    PROFESWSAIOTENRA LL IDNEEV REELPOLPAMCEENMTE CNETNTER III
    OWNER
    CHINO VALLEY UNIFIED SCHOOL DISTRICT
    5130 RIVERSIDE DRIVE
    CHINO, CA 91710-4310
    ARCHITECT
    PBK
    8163 R1O07C4H0 EES FTOEURR ATVHE SNTUE
    RARNACNHCOH OC UCCUACMAMOONNGGAA, ,C CAA 9 911773300
    (909) 987-0909
    (909)987-0909
    PPRROOJJEECCTT 225500127684
    MJAURLCYH 2 0220526
    PBK/250264

    PROJECT MANUAL
    FOR
    INCTOERRITOERZ TEELNEAMNETN TIMAPRRYO SVCEHMOEONLTS
    INTERIOR TENANT IMPROVEMENTS
    P P R R O O F F E E SWS S SAI I O OTEN NRA A L LL DIDNE EEV V ERE LEL OPO PLP MAM ECN EET NM T CE E CNN ETT N E T R E I R II I
    PROJECT 250178
    PPRROOJJEECCTT 225500127684
    MJAURLCYH 2 0220526
    JULY 2025
    Chino Valley Unified School District
    5130 Riverside Drive
    Chino, CA 91710-4310
    PBK
    PBK
    8163 ROCHESTER AVENUE
    8163 R1O07C4H0 EES FTOEURR ATVHE SNTUE
    RANCHO CUCAMONGA, CA 91730
    RARNACNHCOH OC UCCUACMAMOONNGGAA, ,C CAA 9 911773300
    (909) 987-0909
    (909) 987-0909
    (909)987-0909
    Stamp
    SSUUSSAANNTTOO A AGGUUSTSIIAADDII C-31009
    PBK
    8163 Rochester Avenue SUSANTO
    AGUSTIADI
    Rancho Cucamonga, CA 91730
    C-31009
    Phone: (909) 987-0909 0088--3311--2257
    Fax: (909) 980-9980
    REX D. WANG M36155 Stamp/Date
    MECHANICAL ENGINEER
    LEAF Engineers, Inc.
    Stamp
    8163 Rochester Avenue
    SSRUU aSS nAA cNh NTo TO C O Au AGc G aUm USoTS nIIAA gDa DI, I CA 91730 C-31009
    (909) 390-3111
    PBK
    8163 Rochester Avenue SUSANTO
    AGUSTIADI
    Rancho Cucamonga, CA 91730
    C-31009
    Phone: (909) 987-0909 0088--3311--2257
    Fax: (909) 980-9980
    STEVEN C. MUSSER E-19817 Stamp/Date
    ELECTRICAL ENGINEER
    LEAF Electrical Engineer
    8163 Rochester Avenue
    Rancho Cucamonga, CA 91730
    (909) 987-0909
    PBK/250264
    Page 1 of 2

    0099 9501 0103 PAacionutisntgic al Panel Ceilings 09 51 33 Direct Applied Acoustical Ceilings
    09 90 00 Painting

    TABLE OF CONTENTS
    SPECIFICATIONS GROUP
    CORTEZ ELEMENTARY SCHOOL
    WATER LINE REPLACEMENT
    SPECIFICATIONS GROUP
    GENERAL REQUIREMENTS SUBGROUP
    DIVISION 01 GENERAL REQUIREMENTS PAGES
    01 11 00 Summary of Work
    01 25 13 Product Substitution Procedures
    01 31 00 Project Management and Coordination
    01 33 00 Submittal Procedures
    01 35 16 Alteration Project Procedures
    01 42 19 Reference Standards
    01 43 00 Quality Assurance
    01 50 00 Temporary Facilities and Controls
    01 61 00 Product Requirements
    01 73 00 Execution Requirements
    01 73 29 Cutting and Patching
    01 77 00 Closeout Procedures
    SPECIFICATION GROUP
    FACILITY CONSTRUCTION SUBGROUP
    DIVISION 02 EXISTING CONDITIONS
    02 41 19 Selective Demolition
    DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
    06 10 00 Rough Carpentry
    DIVISION 07 THERMAL AND MOISTURE PROTECTION
    07 21 16 Blanket Insulation
    DIVISION 09 FINISHES
    09 21 16 Gypsum Board Assemblies
    09 24 00 Cement Plastering
    0099 5310 3132 DCiereracmt Aicp Tile Wall Finishing
    0099 9501 0103 PAacionutisntgic al Panel Ceilings
    09 51 33 Direct Applied Acoustical Ceilings
    09 90 00 Painting
    DIVISION 10 SPECIALTIES
    10 11 25 Tackable Bulletin Board
    PBK/MASTER SPECIFICATIONS GROUP-TABLE OF CONTENTS
    (1)
    Rev. 05/23

    3 2 13 13 Concrete Paving
    32 13 13 Concrete Paving

    DIVISION 22 PLUMBING
    22 00 00 General Plumbing Provisions
    22 00 01 Plumbing
    DIVISION 26 ELECTRICAL
    26 05 00 Common Work Results for Electrical
    26 05 19 Low Voltage Electrical Power Conductors and Cables
    26 05 26 Grounding and Bonding for Electrical System
    26 05 29 Hangers and Supports for Electrical System
    26 05 33 Raceway and Boxes for Electrical System
    26 05 53 Identification of Electrical System
    26 20 00 Electrical Distribution Equipment
    26 27 26 Wiring Devices
    DIVISION 31 EARTHWORK
    D IVISION 32 EXTERIOR IMPROVEMENTS
    31 23 33 Trenching
    3 2 12 16 Asphalt Paving
    3 2 13 13 Concrete Paving
    DIVISION 32 EXTERIOR IMPROVEMENTS
    32 12 16 Asphalt Paving
    32 13 13 Concrete Paving
    PBK/MASTER SPECIFICATIONS GROUP-TABLE OF CONTENTS
    (2)
    Rev. 05/23

    SECTION 01 11 00
    SUMMARY OF WORK
    1. PART 1 GENERAL
    1.1 SECTION INCLUDES
    A. Work Included.
    B. Owner furnished products.
    C. Contractor use of site and premises.
    D. Owner occupancy.
    E. Work restrictions.
    1.2 WORK INCLUDED
    A. WWoorrkk oof ft htish icso nCtoranctrt accotm cporimsepsri sae gse ngeernael rcaol nsctoruncsttirounc toiof na creammpoudse lwinigd eo wf aCteVr UlinSeD r ePprlaocfeesmseionntal
    aDte Cveolrotepzm Eelnetm Ceenntaterry ISII clohcoaotle ldo caat t4e5d7 a5t D12a7n5ito0 CCoaurirsts, aC hAivneo,, CChAi n9o1,7 C10A f9o1r 7th1e0 Chino Valley Unified
    School District, Owner.
    B. Construct the work under a single lump sum contract.
    1.3 WORK BY OWNER
    A. Items noted "NIC" (Not In Contract) will be furnished and installed by Owner.
    1.4 OWNER FURNISHED PRODUCTS
    A. Items noted "OFCI" (Owner-Furnished Contractor Installed) will be furnished by Owner and installed
    by Contractor.
    B. Items noted "OFOI" (Owner-Furnished Owner Installed) will be furnished by Owner and installed by
    Owner.
    C. Owner's Responsibilities:
    1. Arrange for and deliver Owner reviewed Shop Drawings, Product Data, and Samples to
    Contractor.
    2. Arrange and pay for Product delivery to site.
    3. On delivery, inspect Products jointly with Contractor.
    4. Submit claims for transportation damage and replace damaged, defective, or deficient
    items.
    5. Arrange for manufacturer's warranties, inspections, and service.
    D. Contractor's Responsibilities:
    1. Review Owner reviewed Shop Drawings, Product Data, and Samples.
    2. Receive and unload Products at site; inspect for completeness or damage, jointly with
    Owner.
    3. Handle, store, install and finish Products.
    4. Repair or replace items damaged after receipt.
    PPBBKK//225500127684 SUMMARY OF WORK 01 11 00
    (1)
    REV. 06/10

    E. Products furnished and installed by Owner (OFOI):
    1. Print shop equipment, work stations and work tables.
    2. Furniture in lobby and mail room.
    F. Items furnished by Owner for installation by Contractor (OFCI):
    1. TV and TV mount in coordinator office and conference room.
    1.5 CONTRACTOR USE OF SITE AND PREMISES
    A. Contractor shall have complete use of the site and premises throughout the construction period.
    1.6 OWNER OCCUPANCY
    A. Owner Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to
    place and install equipment in completed areas of building, before Substantial Completion, provided
    such occupancy does not interfere with completion of the Work. Such placement of equipment and
    partial occupancy shall not constitute acceptance of the total Work.
    B. Architect will prepare a Certificate of Substantial Completion for each specific portion of the Work
    to be occupied before Owner occupancy.
    C. Obtain a Certificate of Occupancy from authorities having jurisdiction before Owner occupancy.
    D. Before partial Owner occupancy, mechanical and electrical systems shall be fully operational, and
    required tests and inspections shall be successfully completed. On occupancy, Owner will operate
    and maintain mechanical and electrical systems serving occupied portions of building.
    E. On occupancy, Owner will assume responsibility for maintenance and custodial service for occupied
    portions of building.
    F. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner
    usage.
    G. Perform the Work so as not to interfere with Owner's day-to-day operations.
    H. Maintain existing exits, unless otherwise indicated.
    I. Provide not less than 72 hours notice to Owner of activities that will affect Owner's operations.
    1.7 WORK RESTRICTIONS
    A. On-Site Work Hours: Work shall be generally performed during normal business working hours,
    Monday through Friday, except as otherwise indicated or required to conform to construction
    schedule and labor codes.
    2. PART 2 PRODUCTS
    Not Used
    3. PART 3 EXECUTION
    Not Used
    END OF SECTION
    PPBBKK//225500127684 SUMMARY OF WORK 01 11 00
    (2)
    REV. 06/10

    SECTION 01 25 13
    PRODUCT SUBSTITUTION PROCEDURES
    1. PART 1 GENERAL
    1.1 SECTION INCLUDES
    A. Product options.
    B. Substitution procedures.
    1.2 DEFINITIONS
    A. Requests for changes in products, materials, or equipment required by Contract Documents proposed by
    the Contractor prior to and after award of the Contract are considered requests for substitutions. The
    following are not considered substitutions:
    1. Revisions to Contract Documents requested by the Owner or Architect.
    2. Specified options of products, materials, and equipment included in Contract Documents.
    1.3 PRODUCT OPTIONS
    A. Products Specified by Reference Standards or by Description Only: Any product meeting those standards
    or description.
    B. Products Specified by Naming One or More Manufacturers with Provision for Substitution: Products of
    manufacturers named and meeting specifications with substitution of products or manufacturer only when
    submitted under provisions of this section.
    C. Products Specified by Naming One or More Manufacturers without Provision for Substitution: No substitution
    allowed.
    1.4 LIMITATIONS ON SUBSTITUTIONS SUBMITTED PRIOR TO THE RECEIPT OF BIDS
    A. The Bid shall be based upon the standards of quality established by those items of equipment and/or
    materials which are specifically identified in the Contract Documents.
    B. The opportunity to request a substitution is not for the convenience of the Bidder to request acceptance of
    equipment and/or materials which may be more familiar or have a lesser cost.
    C. Architect may consider requests for substitutions of specified equipment and/or materials only when
    requests are received by Architect prior to the date established for the receipt of bids as stipulated in
    Document 00 21 13 - Instructions to Bidders.
    D. Consideration by Architect of a substitution request will be made only if request is made in strict
    conformance with provisions of this section.
    E. Burden of proof of merit of requested substitution is the responsibility of the entity requesting the
    substitution.
    F. It is the sole responsibility of the entity requesting the substitution to establish proper content of submittal
    for requests for substitutions. Incomplete submittals will be rejected.
    G. Architect's decision on substitution requests are final and do not require documentation or justification.
    H. When substitution is not accepted, provide specified product.
    I. Substitute products shall not be included within the bid without written acceptance by Addendum.
    PPBBKK//225500127684 PRODUCT SUBSTITUTION PROCEDURES 01 25 13
    (1)
    REV. 03/19

    1.5 LIMITATIONS ON SUBSTITUTIONS SUBMITTED AFTER THE AWARD OF THE CONTRACT
    A. The Contract is based upon the standards of quality established by those items of equipment and/or
    materials which are specifically identified in the Contract Documents.
    B. The opportunity to request a substitution is not for the convenience of the Contractor to request acceptance
    of equipment and/or materials which may be more familiar or have a lesser cost.
    C. Consideration by Architect of substitution requests received after the established date of the receipt of bids
    or contract award will only be made when one or more of the following conditions are met and documented:
    1. Specified item fails to comply with regulatory requirements.
    2. Specified item has been discontinued.
    3. Specified item, through no fault of the Contractor, is unavailable in the time frame required to meet
    project schedule.
    4. Specified item, through subsequent information disclosure, will not perform properly or fit in designated
    space.
    5. Manufacturer declares specified product to be unsuitable for use intended or refuses to warrant
    installation of product.
    6. Substitution would be, in the sole judgement of the Architect, a substantial benefit to the Owner in
    terms of cost, time, energy conservation, or other consideration of merit.
    D. Notwithstanding the provisions of Article 1.4 of this section and the above, the Architect may consider a
    substitution request after the date of the receipt of bids or contract award, if in the sole discretion of the
    Architect, there appears to be just cause for such a request. The acceptance of such a late request does
    not waive any other requirement as stated herein.
    E. Consideration by Architect of a substitution request will be made only if request is made in strict
    conformance with provisions of this section.
    F. Substitutions will not be considered when they are indicated or implied on shop drawings or product data
    submittals without separate written request as required by provisions of this section.
    G. Review of shop drawings does not constitute acceptance of substitutions indicated or implied on shop
    drawings.
    H. Substitutions will not be considered when requested or submitted directly by subcontractor or supplier.
    I. Substitutions will not be considered as a result of the failure to pursue the work promptly or coordinate
    activities properly.
    J. Burden of proof of merit of requested substitution is the responsibility of the Contractor.
    K. It is the sole responsibility of the Contractor to establish proper content of submittal for requests for
    substitutions. Incomplete submittals will be rejected.
    L. Owner shall receive full benefit of any cost reduction as a result of any request for substitution.
    M. Architect's decision on substitution requests is final and does not require documentation or justification.
    N. When substitution is not accepted, provide specified product.
    O. Substitute products shall not be ordered or installed without written acceptance.
    PPBBKK//225500127684 PRODUCT SUBSTITUTION PROCEDURES 01 25 13
    (2)
    REV. 03/19

    1.6 REGULATORY REQUIREMENTS
    A. It shall be the responsibility of the entity requesting the substitution to obtain all regulatory approvals
    required for proposed substitutions.
    B. All regulatory approvals shall be obtained for proposed substitutions prior to submittal of substitution request
    to Architect.
    C. All costs incurred by the Owner in obtaining regulatory approvals for proposed substitutions to include the
    costs of the Architect and any authority having jurisdiction over the project shall be reimbursed to the
    Owner. Costs of these services shall be reimbursed regardless of final acceptance or rejection of
    substitution.
    1.7 SUBSTITUTION REPRESENTATION
    A. In submitting a request for substitution, the entity requesting the substitution makes the representation that
    he or she:
    1. Has investigated the proposed substitution and has determined that it meets or exceeds the quality
    level of the specified product.
    2. Will provide the same warranty or guarantee for the substitution as for the specified product.
    3. Will coordinate installation and make changes to other work which may be required for the work to be
    completed with no additional cost to the Owner.
    4. Waives claims for additional cost or time extension which may subsequently become apparent.
    5. Will reimburse Owner for the cost of Architect's review or redesign services associated with
    substitution request.
    1.8 SUBMITTAL PROCEDURE
    A. Submit each Substitution Request in conformance with the requirements of this section.
    B. Assemble complete Substitution Request into a single bookmarked Portable Document Format (PDF) file.
    C. Transmit electronic PDF files via Architect's Project Collaboration Site address.
    D. Submit request with Architect's Substitution Request Form. Form may be obtained at the office of the
    Architect. Substitution requests received without request form will be returned unreviewed.
    E. Limit each request to one proposed substitution.
    F. Request to include sufficient data so that direct comparison of proposed substitution can be made.
    G. Provide complete documentation for each request. Documentation shall include the following information,
    as appropriate, as a minimum:
    1. Statement of cause for substitution request.
    2. Identify product by specification section and article number.
    3. Provide manufacturer's name, address, and phone number. List fabricators, suppliers, and installers
    as appropriate.
    4. List similar projects where proposed substitution has been used, dates of installation and names of
    Architect and Owner.
    5. List availability of maintenance services and replacement materials.
    6. Documented or confirmation of regulatory approval.
    PPBBKK//225500127684 PRODUCT SUBSTITUTION PROCEDURES 01 25 13
    (3)
    REV. 03/19

    7. Product data, including drawings and descriptions of products.
    8. Fabrication and installation procedures.
    9. Samples of proposed substitutions.
    10. Itemized comparison of significant qualities of the proposed substitution with those of the product
    specified. Significant qualities may include size, weight, durability, performance requirements and
    visual effects.
    11. Coordination information, including a list of changes or modifications needed to other items of work
    that will become necessary to accommodate proposed substitution.
    12. Statement on the substitutions effect on the construction schedule.
    13. Cost information including a proposal of the net change, if any, in the Contract sum if the substitution
    is submitted after the receipt of bids or contract award.
    14. Certification that the substitution is equal to or better in every respect to that required by the Contract
    Documents and that substitution will perform adequately in the application intended.
    15. Waiver of right to additional payment or time that may subsequently become necessary because of
    failure of substitution to perform adequately.
    H. Inadequate warranty, vagueness of submittal, failure to meet specified requirements, or submittal of
    insufficient data will be cause for rejection of substitution request.
    1.9 ARCHITECT'S REVIEW
    A. Within 14 days of receipt of request for substitution, the Architect will accept or reject proposed substitution.
    B. If a decision on a substitution cannot be made within the time allocated, the product specified shall be used.
    C. There shall be no claim for additional time for review of proposed substitutions.
    D. Final acceptance of a substitution submitted prior to the date established for the receipt of bids will be in
    the form of an Addendum.
    E. Final acceptance of a substitution submitted after the award of the contract will be in the form of a Change
    Order.
    2. PART 2 PRODUCTS
    Not Used
    3. PART 3 EXECUTION
    Not Used
    END OF SECTION
    PPBBKK//225500127684 PRODUCT SUBSTITUTION PROCEDURES 01 25 13
    (4)
    REV. 03/19

    This page summarizes the opportunity, including an overview and a preview of the attached documents.
    * Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

    Sign-up for a Free Trial, Government Bid Alerts

    With Free Trial, you can:

    You will have a full access to bids, website, and receive daily bid report via email and web.

    Try One Week FREE Now

    See Also

    CHP IFB #26C424000 - Roof Maintenance Services - CHP Grapevine CVEFDetails Event ID

    State Government of California

    Bid Due: 8/06/2026

    Bid Number: ST24003 Bid Title: Peyton Drive Pavement Rehabilitation Project Category: Streets Status:

    City of Chino Hills

    Bid Due: 7/30/2026

    Solicitation Number: BRC0000681 Title: Magic Johnson Park Make Ready and Parking Project Department:

    Los Angeles County

    Bid Due: 7/27/2026

    Project ID: 4712 Title: Request for Qualifications: Construction Manager at Risk Services SMF

    Sacramento County

    Bid Due: 7/30/2026