The work for the BATES & PINE STREET CSO SEPARATION shall consist of, but not be limited to, the complete and satisfactory construction of installation of:
Stormdrain
- 9 Catch Basin Removals
- 200 SF 2” Rigid Insulation
- 360 CY Aggregate Base
- 1,080 CY Aggregate Subbase
- 11 Granite Headstones
- 52 LF 8” Solid Pipe (SDR35 PVC or HP Storm)
- 117 LF 10” Solid Pipe (SDR35 PVC or HP Storm)
- 130 LF 12” Solid Pipe (SDR35 PVC or HP Storm)
- 247 LF 15” Solid Pipe (SDR35 PVC or HP Storm)
- 533 LF 18” Solid Pipe (SDR35 PVC or HP Storm)
- 10, 4-ft Dia. Catch Basins
- 1, 6-ft Dia. Catch Basin
- 18 VF, 4-ft Dia. Manhole
- 16 VF, 5-ft Dia. Manhole
Sewer Main
- 30 VF, 4-ft Dia. Manhole
- 3 Sewer Spot Repairs (up to 15-ft)
- 1 Sewer Spot Repair (15-ft to 35-ft)
Paving
- 140 Ton of Machine-Placed 12.5mm HMA Surface Course
- 400 Ton of Machine-Placed 19mm HMA Base Course
- 150 Ton of Hand-Placed HMA
- 1,600 SY of Pavement Removal
- 200 SY Loam, Seed & Mulch
Water Main
- 8 LF of 14” Dia. DI Water Main
- 180 LF of 12” Dia. DI Water Main
- 20 LF of 8” Dia. DI Water Main
- 1 Hydrant Installation
Work within Bates Street will include the separation of the existing combined system located between Ash Street & Pine Street. Ancillary work within Bates Street includes sewer main spot repairs, sewer manhole installations, and water main replacement at the Ash & Pine Street intersections. Work within Pine Street will include the separation of the existing combined system located between Bates Street & Blake Street. Pavement disturbed during construction will be subsequently repaved to widths specified in Division 10 “Measurement & Payment.” Coordination with the Water District for requisite water main shut-downs will be required.