2026 Baggage System Upgrades
| Agency: | Metropolitan Airports Commission (MAC) |
|---|---|
| State: | Minnesota |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 30, 2026 |
| Due Date: | Apr 15, 2026 |
| Solicitation No: | Solicitation148 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: This project provides a new breakroom and office space for Delta employees in the existing tug drive area at Terminal 1. The work of this project includes the procurement and erection of a premanufactured building. Also included is the demolition and repair of a portion of the existing concrete slab for new plumbing work as well as electrical in this building. HVAC scope includes three new refrigerant fan coil units and associated condenser located outside. Additionally, there will be one heat recovery unit with an associated electric duct heater. New plumbing scope involves a kitchen sink, electric water heater, and open fixture waste. Fire protection will be modified to accommodate the new space. Electrical scope includes installation of a new electrical panel fed from an existing switchboard in the lower level of Terminal 1 to serve the new breakroom/office space and associated mechanical equipment. The building fire alarm system is extended to provide coverage of the new space. The telecommunication scope will include providing network infrastructure to support the new office space and conference room.
See Also
SECURITY CAMERAS AND ACCESS CONTROL SYSTEMS. The City of Mora, Minnesota, is requesting
League of Minnesota Cities
Due by 10/02/2026