| Agency: | City of Concord |
|---|---|
| State: | New Hampshire |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 16, 2026 |
| Due Date: | Jul 9, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Bid Title: |
B13-26 Industrial Park Water Main Replacement
|
| Category: | Contractor Services |
| Status: | Open |
|
B13-26
City of Concord, New Hampshire
Purchasing Division
CIP 85
WATER MAIN REPLACEMENT
INDUSTRIAL PARK DRIVE
Prepared by, and in coordination with the
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING SERVICES DIVISION
Proposal Documents
Contract Documents
Specifications
BID DUE DATE/TIME: JULY 9, 2026 NOT LATER THAN 2:00 PM
NON-MANDATORY PRE-BID MEETING DATE/TIME:
JUNE 23, 2026 AT 11:00 AM (VIRTUAL)
B13-26 CIP#85 - Water Main Replacement, Industrial Park Drive Page 1/78
TABLE OF CONTENTS
TABLE OF CONTENTS ................................................................................................................ 2
INVITATION FOR BIDS .............................................................................................................. 3
INSTRUCTIONS TO BIDDERS ................................................................................................... 6
TERMS AND CONDITIONS ........................................................................................................ 9
SCOPE OF WORK ....................................................................................................................... 10
BID SUBMISSION CHECKLIST ............................................................................................... 12
BID FORM ................................................................................................................................... 13
ITEMIZED BID SHEETS ............................................................................................................ 15
QUALIFICATIONS STATEMENT ............................................................................................ 22
INSURANCE REQUIREMENTS FOR ALL CONTRACTORS ................................................ 23
NO BID QUESTIONNAIRE ........................................................................................................ 24
NOTICE OF AWARD .................................................................................................................. 25
AGREEMENT .............................................................................................................................. 27
NOTICE TO PROCEED .............................................................................................................. 30
BID BOND ................................................................................................................................... 31
PAYMENT BOND ....................................................................................................................... 32
PERFORMANCE BOND ............................................................................................................. 33
CONTRACTORS AFFIDAVIT ................................................................................................... 34
CONTRACTORS RELEASE ....................................................................................................... 35
CERTIFICATE OF SUBSTANTIAL COMPLETION ................................................................ 37
CHANGE ORDER ....................................................................................................................... 38
WORK CHANGE DIRECTIVE................................................................................................... 40
CONSENT OF SURETY COMPANY ........................................................................................ 42
CONTRACTOR'S FINAL LIEN WAIVER ................................................................................. 43
CERTIFICATE OF FINAL COMPLETION OF WORK ............................................................ 45
TECHNICAL REFERENCES ...................................................................................................... 47
SPECIAL PROVISIONS .............................................................................................................. 48
B13-26 CIP#85 - Water Main Replacement, Industrial Park Drive Page 2/78
City of Concord, New Hampshire
PURCHASING DIVISION
COMBINED OPERATIONS & MAINTENANCE FACILITY
311 NORTH STATE STREET
CONCORD, NH 03301
603-230-3664 FAX: 603-230-3656
www.concordnh.gov
INVITATION FOR BIDS
The Purchasing Division, located at the Combined Operations and Maintenance Facility,
311 North State Street, Concord, New Hampshire 03301, will receive sealed Bids for B13-26,
"CIP 85 WATER MAIN REPLACEMENT, INDUSTRIAL PARK DRIVE" until 2:00 PM on
Thursday, July 9, 2026 at which time and place they will be opened and publicly read. The
sealed envelope should be plainly marked:
B13-26
CIP 85
WATER MAIN REPLACEMENT, INDUSTRIAL PARK DRIVE
CONCORD, NH
Bids may be issued only by the Purchasing Manager, or his/her designee, to authorized firms and
are not transferable unless authorized by the Purchasing Manager, or his/her designee.
Plans and specifications may be downloaded at no charge from the City of Concord, New
Hampshire FTP site at https://ftp.concordnh.gov; Account: vendor; Password: Concord1.
Plans and specifications are not available in hard copy.
Each bid shall be accompanied by a certified check, cash, check drawn by a New Hampshire
bank, or bid bond for and subject to conditions provided in the Instruction to Bidders. The
amount of such bid deposit shall be ten percent (10%) of the total bid, made payable to the City
of Concord, New Hampshire.
A non-mandatory virtual pre-bid informational meeting will be held at 11:00 AM on
Tuesday, June 23. Based on the location of contractors doing this type of work, and
schedules during the construction season, the City is hosting this as a virtual meeting.
Join Zoom Meeting
https://us02web.zoom.us/j/5056501305?omn=83401692543
Meeting ID: 505 650 1305
One tap mobile
+13126266799,,5056501305# US (Chicago)
+16469313860,,5056501305# US
B13-26 CIP#85 - Water Main Replacement, Industrial Park Drive Page 3/78
Join by SIP
* 5056501305@zoomcrc.com
The successful bidder will be required to furnish a performance bond and a separate payment
bond each in the amount of one hundred percent (100%) of the contract price.
Progress Payments: On not later than the last day of every month, the Contractor shall prepare
and submit an invoice covering the total quantities of work that have been completed from the
start of the job up to and including the last day of the preceding month together with such
supporting evidence as required by the CITY.
Retainage: The CITY shall retain a portion of the progress payments, each month, in accordance
with the following procedures:
1. Until work is 50% complete, as determined by the CITY, retainage shall be 10% of the
monthly payments claimed. The computed amount of retainage shall be deposited in a non-
interest-bearing account established by the CITY.
2. After the work is 50% complete, and provided the Contractor has satisfied the CITY in
quality and timeliness of the work, and provided further that there is no specific cause for
withholding additional retainage no further amount shall be withheld.
3. Upon substantial completion, the amount of retainage shall be reduced to 2% of the total
contract price plus an additional retainage based on the CITY's estimate of the fair value of
the punch list items and the cost of completing and/or correcting such items of work, with
specified amounts for each incomplete or defective item of work. As these items are
completed or corrected, they shall be paid out of the retainage until the entire project is
declared completed. The final 2% retainage shall be held, in the non-interest-bearing
account, during the two-year warranty period and released only after the CITY has accepted
the project.
Liquidated Damages: In the event that the Contractor fails to satisfactorily complete the work
contemplated and provided for under this contract, on or before the date of completion Friday,
November 13, 2026, the CITY shall deduct from the payments due the Contractor each month,
the sum of one thousand dollars ($1,000.00) plus engineering charges per day for each
calendar day of delay, which sum is agreed upon not as a penalty, but as fixed and liquidated
damages for each day of such delay, to be paid in full and subject to no deduction. If the
payments due the Contractor are less than the amount of such liquidated damages said damages
shall be deducted from any other monies due or to become due the Contractor or shall be paid by
the Contractor's surety.
The CITY reserves the right to reject any or all bids or any part thereof, to waive any formality,
informality, information and/or errors in the proposal, to accept the proposal considered to be in
the best interest of the CITY, or to purchase on the open market if it is considered in the best
interest of the CITY to do so.
B13-26 CIP#85 - Water Main Replacement, Industrial Park Drive Page 4/78
| Name | Advertising Medium | Address | Phone/Fax | Email and Web Address |
|---|---|---|---|---|
| City of Concord, NH | Posted on City Website and in City Hall Lobby | 311 North State Street, Concord NH 033301 | 603.230-3664 603.230.3656(fax) | twaterman@concordnh.gov www.concordnh.gov/purchasing |
| Associated General Contractors | Bid House | 48 Grandview Drive, Bow NH 03304 | 603.225.2701 603.226.3859(fax) | plansroom@agcnh.org www.agcnh.org |
| Construction Summary of NH | Bid House | 734 Chestnut St, Manchester NH 03104 | 603.627.8856 603.627.4524(fax) | info@constructionsummary.com www.constructionsummary.com |
| Bid Ocean | Bid House | PO Box 40445, Grand Junction, CO 81501 | 866.347.9657 877.356.9704(fax) | bids@bidocean.com www.bidocean.com |
| Dodge Data & Analytics | Bid House | 300 American Metro Blvd, Suite 185, Hamilton, NJ 08619 | 607.898.2053 | dodge.bidding@construction.com www.construction.com |
| New England Construction News - CDC News | Bid House | 100 Radnor Rd S- 102, State College, PA 16801 | 1.800.652.0008 1.888.285.3393(fax) | ENR.products@bnpmedia.com www.enr.com |
Failure to submit all information as detailed on the Bid Submission Checklist and/or submission
of an unbalanced bid are sufficient reasons to declare a proposal as non-responsive and subject to
disqualification.
All bids are advertised, at the CITY's discretion, in various publications and are posted publicly
as detailed below:
Name Advertising Address Phone/Fax Email and Web Address
Medium
City of Concord, Posted on 311 North State 603.230-3664 twaterman@concordnh.gov
NH City Website Street, Concord NH 603.230.3656(fax) www.concordnh.gov/purchasing
and in City 033301
Hall Lobby
Associated Bid House 48 Grandview 603.225.2701 plansroom@agcnh.org
General Drive, Bow NH 603.226.3859(fax) www.agcnh.org
Contractors 03304
Construction Bid House 734 Chestnut St, 603.627.8856 info@constructionsummary.com
Summary of NH Manchester NH 603.627.4524(fax) www.constructionsummary.com
03104
Bid Ocean Bid House PO Box 40445, 866.347.9657 bids@bidocean.com
Grand Junction, CO 877.356.9704(fax) www.bidocean.com
81501
Dodge Data & Bid House 300 American Metro 607.898.2053 dodge.bidding@construction.com
Analytics Blvd, Suite 185, www.construction.com
Hamilton, NJ 08619
New England Bid House 100 Radnor Rd S- 1.800.652.0008 ENR.products@bnpmedia.com
Construction 102, State College, 1.888.285.3393(fax) www.enr.com
News - CDC PA 16801
News
APPROVED:
CITY OF CONCORD, NEW HAMPSHIRE
__________________________________________
Tina M. Waterman, Purchasing Manager
Date: June 16, 2026
B13-26 CIP#85 - Water Main Replacement, Industrial Park Drive Page 5/78
INSTRUCTIONS TO BIDDERS
B13-26, CIP 85 WATER MAIN REPLACEMENT
INDUSTRIAL PARK DRIVE
CONCORD, NH
1. EXPLANATION TO BIDDERS:
Any explanation regarding the meaning or interpretation of contract drawings, specifications or
other contract documents must be requested in writing with sufficient allowance of time for
receipt of reply (at least fourteen (14) calendar days) before the time of the bid opening. Any
such explanations or interpretations shall be made in the form of an addendum to the documents
and shall be furnished to all bidders who shall submit all addenda with their bids. Oral
explanations and interpretations made prior to the bid opening shall not be binding. Requests for
explanations should be addressed to:
Tina M. Waterman, Purchasing Manager
Combined Operations & Maintenance Facility
311 North State Street
Concord, NH 03301
(603) 230-3664
(603) 230-3656 (Fax)
twaterman@concordnh.gov
2. PRE-BID MEETING:
A non-mandatory virtual pre-bid informational meeting has been scheduled for Tuesday, June
23, 2026 at 11:00 AM. Based on the location of contractors doing this type of work, and
schedules during the construction season, the City is hosting this as a virtual meeting.
3. BIDDERS UNDERSTANDING:
The Contractor acknowledges that they have visited the work site and familiarized themselves
with pertinent local conditions such as location, character, accessibility, existing work, and labor
conditions.
The City of Concord shall make available to all prospective bidders, previous to the receipt of
bids, information that it may have as to the extraordinary site conditions at the work site. Such
information shall be given, however, as the best factual information available without the
assumption of responsibility for its accuracy or for any conclusions that the contractor might
draw there from.
B13-26 CIP#85 - Water Main Replacement, Industrial Park Drive Page 6/78
4. QUALIFICATIONS OF BIDDER:
The City of Concord may make such investigations as it deems necessary to determine the ability
of the bidder to perform the work, and the bidder shall furnish to the City all such information
and data for this purpose as the City may request. The City reserves the right to reject any bid if
the evidence submitted by, or investigation of such bidder fails to satisfy the City that such
bidder is properly qualified to carry out the obligations of the contract and to complete the work
contemplated therein. Conditional bids will not be accepted.
5. BID BOND REQUIREMENTS:
Security required shall be submitted with the bid and failure to submit same may be cause for
rejection. The bidder, at his/her option, shall furnish a certified check drawn by a New
Hampshire bank, cash, or a bid bond as security in the amount required. Security deposited by
unsuccessful bidders will be returned as soon as practicable after the opening.
6. CONTRACTS, BONDS, AND INSURANCE:
The successful bidder shall enter into a written Contract with the City of Concord within the time
specified by the bid. A performance bond and a separate payment bond in the amount of 100
percent (100%) of the contract price shall be furnished at the time of signing the formal
Agreement. The Contractor shall secure and maintain the insurance policies required under this
Contract.
7. BID ACCEPTANCE:
The bidder agrees that the Bid shall be deemed open for acceptance for ninety (90) calendar days
subsequent to submittal to the City of Concord or as modified by addendum.
8. BASE BID AND BID ALTERNATES:
The bid consists of a Base Bid and one Add Alternate (deduct for non-zinc pipe). Bidders shall
submit a unit price for every item of the Base Bid and of each Add Alternate; a bid that fails to
price every item may be deemed non-responsive. The City reserves the right to award the Base
Bid alone, or the Base Bid together with any Add Alternate or combination of Add Alternates,
whichever the City determines to be in its best interest. The City reserves the right to reject any
or all bids and to waive informalities.
9. TIME OF COMPLETION:
The successful Contractor agrees to: 1) commence work within a set amount of time after the
written Notice to Proceed as agreed upon by the City and the Contractor; 2) that the date of
substantial completion, with such extensions as approved in writing by the City, shall be no later
than Friday, October 9, 2026; and 3) that the date of final completion, with such extensions as
approved in writing by the City, shall be no later than Friday, November 13, 2026.
B13-26 CIP#85 - Water Main Replacement, Industrial Park Drive Page 7/78
10. BID SUBMISSION:
Bids are due to the Purchasing Manager at 311 North State St, Concord, NH no later than 2:00
pm Thursday, July 9, 2026.
Bids may be submitted electronically through Euna OpenBids at
https://www.demandstar.com/app/agencies/new-hampshire/city-of-concord/procurement-
opportunities/b2a9a744-d808-4b29-9cb3-103bb077c029/
Bids may also be submitted by mail, courier or in-person and shall be delivered to:
Tina M. Waterman, Purchasing Manager
Operations Maintenance Facility
311 N. State St.
Concord, NH 03301
It is the sole responsibility of the Bidder to ensure that their submission includes all required
documents, is submitted in the proper manner, and prior to the deadline for submittal of bids. It is
recommended that the Bidder thoroughly reviews their submittal in its entirety to ensure that all
portions follow all requirements stated in this Invitation for Bids.
B13-26 CIP#85 - Water Main Replacement, Industrial Park Drive Page 8/78
TERMS AND CONDITIONS
Bidders can view/download the City's terms and conditions (City General Conditions and
Engineering Project-Specific Conditions) located on Concord's FTP site by visiting
https://ftp.concordnh.gov or through the Euna OpenBids portal (for registered users only).
Unless any exceptions to the Terms and Conditions are expressly stated on the enclosed
Specifications Exception Form, the vendor shall accept the Terms and Conditions as written.
B13-26 CIP#85 - Water Main Replacement, Industrial Park Drive Page 9/78
SCOPE OF WORK
B13-26, CIP 85 WATER MAIN REPLACEMENT
INDUSTRIAL PARK DRIVE
CONCORD, NH
1. PROJECT IDENTIFICATION:
The project name is B13-26, CIP 85 Water Main Replacement - Industrial Park Drive. The plans
for this work were prepared by the City of Concord, New Hampshire, Community Development
Department, Engineering Services Division.
2. DESCRIPTION OF WORK:
Base Bid
This project consists of the replacement and upsizing of existing 8" water main with a new 12"
water main, plus related water system appurtenances in Industrial Park Drive, portions of
Regional Drive, Pembroke Road, Chenell Drive, and related tie-in areas shown on the Contract
Plans. All work shown on the Contract Plans is included in the Base Bid.
The proposed base bid work includes furnishing and installing zinc-coated, double-cement-lined
Class 52 ductile iron water main; temporary bypass water piping and temporary water service
connections; new hydrants; gate valves, fittings, water services, service valves, thrust restraint,
testing, disinfection, and connections to the existing water system.
The work also includes abandoning, cutting, capping, plugging, removing, and disposing of
existing water mains, water services, hydrants, valves, and appurtenances. This project includes
requirements for temporary water, pressure testing, chlorination, bacteriological sampling,
hydrant status notification, thrust blocks, and abandoned pipe treatment.
The work further includes exploratory excavation; turf, driveway, sidewalk, and roadway
restoration; minor drainage work including a precast concrete drywell; and other incidental work
required by the Contract Documents.
Construction shall conform to the Contract Documents, City of Concord Construction Standards
and Details, applicable NHDOT specifications, special provisions, special attentions (if
included), and federal, state, and City codes and regulations.
Add Alternate 1 (Deduct)
The intent of Add Alternate 1 is to provide a deduct alternate for furnishing non-zinc-coated
ductile iron water pipe in lieu of zinc-coated ductile iron water pipe for the pipe items identified
in the Bid Form.
B13-26 CIP#85 - Water Main Replacement, Industrial Park Drive Page 10/78
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Warner 15907 Scope: NH 127 over Warner River - Bridge Replacement or Rehab
State Government of New Hampshire
Bid Due: 8/13/2026
Warner 15907 Scope: NH 127 over Warner River - Bridge Replacement or Rehab
State Government of New Hampshire
Bid Due: 8/13/2026
Warner 15907 Scope: NH 127 over Warner River - Bridge Replacement or Rehab
State Government of New Hampshire
Bid Due: 8/13/2026
number title due date Community Services B27010 Hot Bituminous Paving (Asphalt) Laid in
City of Dover
Bid Due: 8/18/2026