B027-08 Edison Middle School Floor Replacement
| Agency: | City of Meriden |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 24, 2026 |
| Due Date: | Jul 15, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: B027-08 Edison Middle School Floor Replacement
Addenda: 0
Release Date: 6/24/2026
Due Date: 7/15/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
The City of Meriden is seeking the services of a contractor to remove and replace approximately 4,088 sq ft of VCT flooring in SOAR hallway, gym, teacher offices, and connected side halls (as highlighted on attached drawings) at Edison Middle School.
The flooring contractor shall, rip out, remove, and properly dispose of the existing flooring prior to prepping and installing the new flooring.
The flooring contractor shall also be responsible for providing dumpsters for the disposal of the flooring material and maintain them through the duration of the project.
The contractor is to install Mapie Planiseal, Sika MB, Ardex MC Rapid 20-year warranted epoxy moisture mitigation system or equivalent before installing new VCT to match existing patterns.
Floor grinding will be performed with a HEPA vacuum attached, but it is not 100% dust free. Precautions should be made by others to move, cover, and/or protect delicate surrounding surfaces.
Furniture moving and VCT waxing to be done by others.
Work could be completed during the summer hours of 6:00 am to 2:30 pm daily.
Timeline
1355 No Broad Street
Meriden, CT 06450
See Also
Trumbull Hillcrest Middle School - State project #144-0108N Trumbull Bid #6578 Phase 2
State Government of Connecticut
Due by 9/17/2026
LISC CT OEC Facilities Construction and Renovation Grant Program LISC Connecticut, through an
State Government of Connecticut
Due by 2/03/2027
Request for Price Proposals (RFP) - Solicitation number 2026-09-LC Solicitation Date: September 2,
New Britain Housing Authority
Due by 10/02/2026
Town of Farmington RFQ: Fire Station Construction/Renovation Project Architectural, Design and Related engineering
State Government of Connecticut
Due by 9/20/2026