AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
| Agency: | TRANSPORTATION, DEPARTMENT OF |
|---|---|
| State: | Arizona |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Oct 28, 2025 |
| Due Date: | Nov 19, 2025 |
| Solicitation No: | 6982AF25B000019 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Oct 28, 2025 02:09 pm MDT
- Original Published Date: Oct 20, 2025 06:49 am MDT
- Updated Date Offers Due: Nov 19, 2025 02:00 pm MST
- Original Date Offers Due: Nov 19, 2025 02:00 pm MST
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Dec 04, 2025
- Original Inactive Date: Dec 04, 2025
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Payson , AZ 85541USA
PROJECT NUMBER: AZ FS 289(1)
PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT
PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289.
SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic.
PRINCIPAL WORK ITEMS:
- 20304-2000 Removal of Bridge: 1 LPSM
- 20401-0000 Roadway Excavation: 3,100 CUYD
- 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD
- 20441-0000 Waste: 2,300 SQFT
- 30202-2000 Roadway Aggregate, Method 2: 750 TON
- 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON
- 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD
- 55201-0200 Structural Concrete, Class A (AE): 252 CUYD
- 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT
- 55401-1000 Reinforcing Steel: 14,200 LB
- 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB
- 55601-0900 Bridge Railing, Steel: 162 LNFT
- 62801-000 Temporary Stream Diversion: LPSM
ANTICIPATED SCHEDULE:
Advertisement – October 2025
Award – December 2025
NTP – January 2026
Contract Completion – October 2026
Due to weather, no onsite work is anticipated between January and April 2026
ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Stephanie Navarro
- cflacquisitions@dot.gov
- Kelly Palmer
- cflacquisitions@dot.gov
- Oct 28, 2025 02:09 pm MDTSolicitation (Updated)
- Oct 20, 2025 06:49 am MDT Solicitation (Original)
- Sep 23, 2025 02:45 pm MDT Presolicitation (Original)
Related Document
| Sep 23, 2025 | [Presolicitation (Original)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT |
| Oct 20, 2025 | [Solicitation (Original)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT |
| Nov 4, 2025 | [Solicitation (Updated)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT |
| Nov 14, 2025 | [Solicitation (Updated)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT |
| Nov 17, 2025 | [Solicitation (Updated)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT |
| Nov 18, 2025 | [Solicitation (Updated)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT |
| Nov 19, 2025 | [Solicitation (Updated)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT |
| Jan 20, 2026 | [Solicitation (Updated)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT |
See Also
Follow Y--GRCA 257282 - Replace Wastewater Plant at South Ri Active Contract Opportunity
INTERIOR, DEPARTMENT OF THE
Due by 11/18/2026
Code: BPM007856 Label: FIRE TRUCK BAY HVAC UPGRADE Commodity: Building and Facility Construction
State Government of Arizona
Due by 12/18/2026
DOWNLOAD TUBA CITY WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT Date: November 24, 2026, at
Navajo Tribal Utility Authority
Due by 11/24/2026
Project ID: Title: CMAR for Waddell Road Improvements Addenda: 0 Release Date: 11/5/2026
City of Surprise
Due by 12/03/2026