AZ BL COLO 7528(1) Burro Creek Road
| Agency: | TRANSPORTATION, DEPARTMENT OF |
|---|---|
| State: | Arizona |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Nov 12, 2026 |
| Due Date: | Nov 17, 2026 |
| Solicitation No: | 6982AF27B000002 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Nov 12, 2026 04:20 pm MST
- Original Published Date: Oct 15, 2026 01:09 pm MDT
- Updated Date Offers Due: Nov 17, 2026 02:00 pm MST
- Original Date Offers Due: Nov 17, 2026 02:00 pm MST
- Inactive Policy: Manual
- Updated Inactive Date: Dec 17, 2026
- Original Inactive Date: Dec 17, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Kingman , AZ 86401USA
PROJECT DESCRIPTION:
Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.
SCOPE OF THE WORK:
The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items:
- Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.
- Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.
- Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns
- Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.
The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.
PRINCIPAL WORK ITEMS:
Roadway Aggregate: 1,600 TONS
Ditch Reconditioning: 2,000 LNFT
Full Depth Reclamation: 1.3 MILE
Asphalt Concrete Pavement: 3,600 TON
18-Inch Pipe Culvert: 100 LNFT
24-Inch Pipe Culvert: 175 LNFT
Boulder: 100 EACH
ANTICIPATED SCHEDULE:
Advertisement – October 2026
Award-January - 2027
Construction – January 2027 through October 2027
ESTIMATED COST RANGE:
Between $2,000,000 and $5,000,000
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Eric Grosskreuz
- cflcontracts@dot.gov
- Kelly Palmer
- CFLcontracts@dot.gov
- Nov 12, 2026 04:20 pm MSTSolicitation (Updated)
- Nov 05, 2026 02:42 pm MST Solicitation (Updated)
- Oct 27, 2026 03:00 pm MDT Solicitation (Updated)
- Oct 15, 2026 01:15 pm MDT Solicitation (Updated)
- Oct 15, 2026 01:09 pm MDT Solicitation (Original)
- Oct 14, 2026 11:07 pm MDT Presolicitation (Original)
Related Document
| Sep 15, 2026 | [Presolicitation (Original)] AZ BL COLO 7528(1) Burro Creek Road |
| Oct 15, 2026 | [Solicitation (Updated)] AZ BL COLO 7528(1) Burro Creek Road |
| Oct 27, 2026 | [Solicitation (Updated)] AZ BL COLO 7528(1) Burro Creek Road |
| Nov 5, 2026 | [Solicitation (Updated)] AZ BL COLO 7528(1) Burro Creek Road |
| Nov 17, 2026 | [Solicitation (Updated)] AZ BL COLO 7528(1) Burro Creek Road |
See Also
Bid Number: 2025-0029 Bid Title: Community Center Park Improvements Project Phase 1A and
Town of Chino Valley
Due by 11/19/2026
Follow Y--Cove Day School Construction Active Contract Opportunity Notice ID 140A1627B0003 Related Notice
INTERIOR, DEPARTMENT OF THE
Follow iHouse Apartment Construction Active Contract Opportunity Notice ID 75H70126R00026 Related Notice SS75H70126R00026
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Due by 12/01/2026
Project: Construction Labor Standards and Federal Compliance Consultant Ref. #: 27-036 Department: Community
City of Tempe
Due by 12/07/2026