Aylor Open Space Abatement

Agency: City of Thornton
State: Colorado
Type of Government: State & Local
NAICS Category:
  • 531120 - Lessors of Nonresidential Buildings (except Miniwarehouses)
Posted Date: May 21, 2026
Due Date: Jun 9, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Solicitation number Status Due Description Attachments
22-27B Active 6/9/2026 3:00 PM Aylor Open Space Abatement


Solicitation Document


Appendix G

Attachment Preview

AYLOR PROPERTY
13981 QUEBEC STREET, THORNTON, COLORADO
ABATEMENT, DEMOLOTION, AND REMOVAL
PROJECT CIP 22-109A
REQUEST FOR PROPOSALS
Date Issued: TBD
Mandatory Site Walk: TBD
Questions Due: TBD
Bids Due: TBD
Anticipated Award: TBD
Issued by:
ERO Resources Corporation
1626 Cole Blvd., Suite 100
Lakewood, CO 80401
(303) 830-1188
Bid Document: Aylor Property Abatement, Demolition, and Removal Page | 1

Table of Contents
1. INTRODUCTION ........................................................................................................................................ 3
1.1. OVERVIEW ................................................................................................................................................. 3
1.2. TIME OF COMPLETION .................................................................................................................................. 3
1.3. TERM OF CONTRACT..................................................................................................................................... 4
2. BACKGROUND .......................................................................................................................................... 4
3. PROJECT REQUIREMENTS ......................................................................................................................... 5
3.1. SCOPE OF WORK SUMMARY .......................................................................................................................... 5
3.1.1. Major Asbestos Spill ....................................................................................................................... 5
3.1.2. Sound Structures ............................................................................................................................ 5
3.1.3. Unsound Structures ........................................................................................................................ 5
3.1.4. Demolition and Removal ................................................................................................................ 5
3.2. ADDITIONAL REQUIREMENTS ......................................................................................................................... 6
3.3. SCHEDULE .................................................................................................................................................. 6
3.4. BONDING ................................................................................................................................................... 6
3.5. WARRANTY ................................................................................................................................................ 6
3.6. EVALUATION CRITERIA .................................................................................................................................. 7
3.7. RESPONSE REQUIREMENTS ............................................................................................................................ 7
3.7.1. Letter of Interest ............................................................................................................................ 7
3.7.2. Threshold Requirements ................................................................................................................ 7
3.7.3. Main Proposal ................................................................................................................................ 8
3.8. SELECTION PROCESS ..................................................................................................................................... 9
3.9. SITE WALK ................................................................................................................................................. 9
3.10. QUESTIONS ............................................................................................................................................ 9
3.11. SUBMITTAL DUE DATE.............................................................................................................................. 9
4. CERTIFICATION FORM ............................................................................................................................ 10
5. RFP SUBMITTAL REQUIREMENTS CHECKLIST .......................................................................................... 11
B.1 GENERAL ................................................................................................................................................... 1
B.2 RELATED DOCUMENTS .................................................................................................................................. 1
B.3 ASBESTOS ABATEMENT ................................................................................................................................. 2
B.4 PERMITTING ............................................................................................................................................... 2
B.5 COORDINATION ........................................................................................................................................... 2
B.6 UTILITIES .................................................................................................................................................... 2
C.1 GENERAL ................................................................................................................................................... 4
C.2. SITE PREPARATION ....................................................................................................................................... 4
C.3. STRUCTURE DEMOLITION .................................................................................................................................... 1
Bid Document: Aylor Property Abatement, Demolition, and Removal Page | 2

REQUEST FOR PROPOSALS
AYLOR PROPERTY
13981 QUEBEC STREET, THORNTON, COLORADO
ABATEMENT, DEMOLITION, AND REMOVAL
1. Introduction
1.1. Overview
This Request for Proposals ("RFP") is being issued by ERO Resources Corporation (ERO) in its
capacity as environmental consultant for the City of Thornton ("Owner"). The purpose of this
RFP is to solicit proposals from City of Thornton pre-qualified Contractors for the work described
herein.
The work consists of the pre-demolition abatement of identified asbestos-containing building
materials (ACBM), demolition, and removal of historical farm structures located on the Aylor
Property at 13981 Quebec Street, Thornton, Colorado. All work described herein is to conform to
the specifications described herein and/or the City of Thornton Standards & Specifications as
applicable, available at City of Thornton Standards and Specifications | City of Thornton.
"Respondents" means the companies or individuals that submit proposals in response to this
RFP. It is understood that the selected Respondent acting as an individual, partnership,
corporation, or other legal entity is state licensed and certified and capable of providing the
specified services. The Respondent will be required to obtain and maintain, at its sole cost,
appropriate licenses for work within the City of Thornton.
Nothing in this RFP shall be construed to create any legal obligation on the part of ERO, Owner,
or any respondents. ERO reserves the right, at its sole discretion, to amend, suspend, terminate,
or reissue this RFP, in whole or in part, at any stage and forego any formalities. In no event shall
ERO or Owner be liable to Respondents for any costs or damages incurred in connection with the
RFP process including, but not limited to, any and all costs of preparing a response to this RFP or
any other costs incurred in reliance on this RFP. All supporting documentation submitted in
response to this RFP will become the property of ERO and Owner. After Award, the information
within the Proposal becomes public information with the exception of information that has been
clearly marked as confidential and proprietary by the proposing firm. Any information marked
confidential shall comply with Colorado's Open Records Act (CORA) and other applicable
statutes. Owner shall be held harmless from any claims arising from the release of confidential
and proprietary information not clearly designated as such by the proposing firm or which does
not comply with CORA. Respondents may withdraw their interest in the RFP, in writing, at any
point in time as more information regarding the tasks associated with this RFP becomes known.
1.2. Time of Completion
The selected Respondent (and upon award "Contractor") must have secured commitments to
initiate on-ground site work and accept all security control and responsibility for the site as
Bid Document: Aylor Property Abatement, Demolition, and Removal Page | 3

outlined herein upon transfer of the site to the operational control of the Contractor. Active site
work shall be completed within six months of the notice to proceed.
Nothing in this RFP or subsequent contract permits or will allow compensation claims or
adjustments made by Contractor in the event of theft, vandalism, unauthorized destruction, or
delays in site activities due to actions caused by inadequate, inappropriate, or poor site security.
Site security within the work area, and appropriate levels and implementation thereof, is at the
sole discretion and responsibility of the Contractor. Owner and/or ERO reserve the right to
inspect, identify, and require timely satisfactory adjustments to security deemed inadequate at
no additional cost to the Owner.
1.3. Term of Contract
The contract awarded pursuant to this RFP solicitation will be directly with ERO and shall be for a
period up to twelve months, with the possibility of an extension, as needed and/or warranted. A
copy of the proposed contract is included in Attachment F. The contract will be made on the
basis of a proposal for the work described herein and any issued addenda. It is the intent to
award one contract to a Respondent presenting the best value for all services described in this
RFP. ERO reserves the right to reject any and all Proposals, or any part thereof. ERO further
reserves the right to waive any formalities, or informalities contained in any Proposal, and to
award the Agreement to the most responsive, responsible, and trustworthy proposing firm as
deemed in the best interest of ERO and Owner.
2. Background
The Owner owns the real property at 13981 Quebec Street in Thornton, Colorado (Adams County
Parcel No. 0157120401001). The address of the project (13981 Quebec Street) refers to the
historical farm and agricultural outbuildings located in the northern portion of the real property
and is herein referred to as the "Aylor Property". The project area within the Aylor Property
consists of the northern approximately 35-acres of undeveloped, former agricultural land with an
abandoned farmhouse, several abandoned outbuildings, and ancillary structures. During due
diligence activities conducted by ERO and by DS Consulting, Inc. (DS Consulting) asbestos building
materials were identified within the structures as well as a Major Asbestos Spill, as defined under
Colorado Department of Public Health and Environment (CDPHE), Air Quality Control Division
(AQCD) Regulation No. 8, Part B, within and/or around the structures. In addition, because
several of the structures are structurally unsound, a variance request for the controlled
demolition of asbestos containing materials has been developed and approved by the CDPHE
AQCD for the safe abatement of materials within unsounds structures.
Site location maps are shown on Attachment A.
Detailed scope of work for asbestos abatement is described in Attachment B.
Detailed scope of work for post-abatement site demolition and removal activities is described in
Attachment C.
Additional project documents are included in Attachment D.
Project insurance requirements are described in Attachment E
Sample contract to be used between ERO and Contractor is included in Attachment F
Project bid forms are presented in Attachment G
Bid Document: Aylor Property Abatement, Demolition, and Removal Page | 4

3. Project Requirements
3.1. Scope of Work Summary
The Aylor Property consists of undeveloped agricultural land with a historical farmstead area in
the northern portion that includes the following structures: a residence, well house, poultry shed,
feed shed, sub-grade storage cellar, chicken coop barn, poultry barn, livestock barn, livestock
lean-to, feed shed, and corrugated metal silo. The Owner desires the removal of the structures as
well as general site debris cleanup and additional soil removal. In general, the work scope consist
of the following:
3.1.1. Major Asbestos Spill
Abatement of major asbestos spill identified by DS Consulting, detailed within the corresponding
Asbestos Spill Delineation Report prepared by DS Consulting, in accordance with CDPHE AQCD
Regulation No. 8, Section III.T.
3.1.2. Sound Structures
Abatement of asbestos-containing materials identified by DS Consulting and detailed within the
corresponding pre-demolition asbestos inspection reports for structures that are structurally
sound in accordance with CDPHE AQCD Regulation No. 8. The applicable structures consist of the
following:
a. Structure 1 - Residence (approx. 1,911 square feet (sf))
b. Structure 3 - Poultry Shed (approx. 950 sf)
c. Structure 9 - Feed shed (approx. 240 sf)
d. Structure 10 - Silo (approx. 150 sf)
e. Structure 11 - Mobile Camping Trailer (approx. 145 sf)
3.1.3. Unsound Structures
Abatement of asbestos-containing materials within structures have been determined to be
structurally unsound in accordance with the December 23, 2025 Asbestos Abatement Variance
Request Work Plan And Project Design for Controlled Demolition Of Asbestos Containing
Materials prepared by DS Consulting and approved by the CDPHE AQCD on January 19, 2026
(Attachment D). These structures include the following:
a. Structure 4 - Storage Cellar (approx. 400 sf)
b. Structure 5 - Chicken Coop Barn (approx. 1,710 sf)
c. Structure 6 - Poultry Barn (approx. 6,160 sf)
d. Structure 7 - Livestock Barn (approx. 885 sf)
3.1.4. Demolition and Removal
Demolition and removal of all structures, foundations, and debris within the project area as
shown on the attached figure in Attachment A. Two structures did not contain asbestos that
require pre-demolition abatement, but are included within the demolition scope. These
structures include the following:
Bid Document: Aylor Property Abatement, Demolition, and Removal Page | 5

a. Structure 2 - Well House (approx. 90 sf)
b. Structure 8 - Livestock Lean-to (approx. 1,280 sf)
3.1.5. Bid Alternate - Soil Removal
Owner currently has an estimated 3,500 cubic yards (CY) of staged soils and vegetation debris
removed from various City-managed stormwater ponds that requires removal. Tasks is to
include the loading and off-site removal of up to 3,500 cubic yards of soil from the project area to
location within 15 miles of the project area to be determined.
The Respondent is assumed to have a complete understanding of the site, building
characteristics, site utilities, and layout, sufficient to provide an accurate and sufficient bid to
complete the full scope outlined in this RFP.
3.2. Additional Requirements
This project will comply with all codes, standards, regulations, and workers' safety rules that are
administered by, federal agencies (e.g., U.S. Environmental Protection Agency (EPA), U.S.
Occupational Health and Safety Administration (OSHA), and U.S. Department of Transportation);
state agencies CDPHE, Colorado Department of Labor and Employment (CDLE), Colorado
Department of Water Resources (CDWR), and Colorado Department of Wildlife (CDOW)); and any
other local regulations and standards (City of Thornton and Adams County) that may apply.
Because of the nature of the project, Respondent personnel working in different project areas
may be required to maintain varying levels of certification for work in/with hazardous materials
operations (HAZWOPR), asbestos abatement, construction, confined space operations, and/or
trenching.
3.3. Schedule
Upon award, the Contractor shall attend a pre-project conference to be held at the facility within
1 week of the notice to proceed to discuss the project, expectations, schedules, and any logistical
details prior to the start of site construction activities. Subsequent meetings will be as needed.
Owner desires completion of demolition and substantial completion of active site work no later
than [DATE].
3.4. Bonding
Performance and Payment Bond - The Contractor must furnish a Performance and Payment
Bond complying with applicable Colorado statutes, for one hundred (100) percent of the total
contract price, excluding optional costs, conditioned that such contractor shall at all times
promptly make payments of all amounts lawfully due to all persons supplying or furnishing him
or his subcontractors with labor, equipment or material used or performed in the prosecution of
the work provided for in such Contracts.
3.5. Warranty
The Contractor shall provide a one year Warranty for all work from the date of initial acceptance
by the Owner.
Bid Document: Aylor Property Abatement, Demolition, and Removal Page | 6

3.6. Evaluation Criteria
In evaluating responses to this RFP, ERO will take into consideration the experience, capacity, and
costs that are being proposed by the Respondent. The following Evaluation Criteria will be
considered in reviewing submittals:
* Innovation for their proposed staging and/or approach to the project.
* Pricing.
* Schedule.
* Submittal Requirements.
RFP responses must be submitted via e-mail (pdf or scanned) attachment sent to
jdenman@eroresources.com. Each Respondent shall submit one copy of the following
documents in a clear, legible, and 8.5 by 11 inch format. Respondents are advised to adhere to
the Submittal Requirements. Failure to comply with the instructions of this RFP may be cause for
rejection of submittals. Late Proposals will not be accepted.
ERO reserves the right to seek additional information to clarify responses to this RFP. Each
response must include the following.
3.7. Response Requirements
3.7.1. Letter of Interest
Please submit a Cover Letter of Interest signed by a duly authorized officer or representative of
the Respondent, not to exceed two pages. The Letter of Interest must also include the following
information:
1. The principal place of business and the contact person, title, telephone/fax numbers,
and email address.
2. A brief summary of the qualifications of the Respondent and team as it relates to the
project.
3. Description of organization (e.g., corporation, limited liability company, or joint
venture).
4. The Certification attached at the end of this RFP and incorporated herein by
reference must be signed by the Respondent and attached to the Letter of Interest.
3.7.2. Threshold Requirements
These documents must be submitted and acceptable before ERO will review the Experience and
Capacity proposal:
1. Evidence of Insurance: Commercial General Liability with limits not less than
$2,000,000 per occurrence, not less than $5,000,000 aggregate; Pollution Liability
Coverage with limits not less than $2,000,000; Workers Compensation and
Employers Liability with limits not less than $1,000,000; and, Automobile Liability
with limits not less than $1,000,000 per occurrence.
2. Upon award, Contractor shall be required to submit documentation of the following
additional policies specifically identified within Attachment E and summarized
below:
a. Builder's Risk Insurance Policy
Bid Document: Aylor Property Abatement, Demolition, and Removal Page | 7

b. Installation Floater Insurance Policy
c. Products and Completed Operations Liability Insurance.
3. Upon award, Contractor will be required to submit documentation naming ERO and
Owner, its officers, agents, and employees as additional insureds with respect to the
Commercial General Liability, Auto Liability and, if required, Builder's Risk and
Installation Floater coverages, as additional insured.
3.7.3. Main Proposal
Please provide the following information (this information is the main substance for the selection
criteria):
1. Experience. Years of experience and detailed qualifications in performing the
range of services on various property types in compliance with applicable
standards. Past projects will be reviewed to determine if the Respondent has
successfully completed projects similar in nature and scope.
2. Projects. Respondents shall provide narrative examples of three projects that are
similar in nature to the project described in the RFP. Include project narrative (one
paragraph), project date, final project cost, project reference contact name, and
current phone number. Marketing materials may be included within this
component, provided they meet the data requirements listed.
3. Approach. Project specific approach to implementation of the scope. Narrative is
expected to include description of data needs, design considerations, contingencies
for potential concerns, and other site-specific approach information as necessary
to adequately evaluate the response. Areas of specific detail required to be within
the main proposal response include, but are not limited to:
a. Abatement and demolition coordination
b. ACM and open-air demolition experience/management
c. Demolition plan
d. Revegetation/reseeding plan
e. Other specific approaches or assumptions that may be reflected within the
pricing proposal can be described within this section.
4. Independent Contractors. If you engage independent contractors, how many do
you intend to hire? Do you intend to cover them with workers compensation? All
independent contractors will be required to have workers compensation coverage,
which will be the responsibility of the Respondent. Proposed GAC is required to be
identified.
5. Project Schedule. Capacity to complete the project components within the
specified time frame is critical. Contractors will be evaluated based on their
proposed project schedule. Greater weight will be given if the project can be
completed before the allotted time frame.
6. Pricing proposal. The Contractor will sign a unit price contract to include all work
and services that will incorporate all specifications herein and to include payment
terms of net-60 beginning on the last day of the month of Contractor invoice
submitted and accepted for payment by ERO. All Contractor invoicing is subject to
5% retainage per Owner procurement requirements. Unit pricing for additional
Bid Document: Aylor Property Abatement, Demolition, and Removal Page | 8

components are requested (Attachment G), but are not included in the pricing
evaluation.
7. Quantity Acknowledgement. Acknowledgement that Respondent has had the
opportunity to independently verify bid quantities estimated in this RFP.
8. Cost Escalation. No escalation costs, fuel adjustments, or change orders requesting
such will be honored for the life of the contract.
9. Project Assumptions. Contractor to provide a list of project-specific assumptions as
they pertain to project implementation and pricing.
3.8. Selection Process
There will not be a public opening of bids. ERO and Owner will review qualifications in
accordance with the evaluation criteria set forth herein. Proposals that are submitted in a timely
manner and comply with the mandatory requirements of the RFP will be evaluated in accordance
with the terms of the RFP. ERO and Owner may choose to "short list" prospective firms for
further consideration, which may include interviews and/or negotiations. Any contract resulting
from this RFP will not necessarily be awarded to the Respondent with the lowest price. Instead,
the contract shall be awarded to the Respondent whose proposal presents the best overall value
in accordance with criteria set forth in RFP.
It is the intent to award the contract to a single contractor to allow for efficiencies of
mobilization, scheduling, phasing, and project implementation. ERO reserves the right, at its sole
discretion, to award of a contract for the proposed work described herein, in whole or in part,
subject to clarification, negotiation, and/or availability of funds.
3.9. Site Walk
ERO and Owner will conduct a required site walk at a time to be determined of the Project Area.
Attendance of Respondents is required, and the purpose is to allow Respondents to gain a
complete understanding of the site, conditions, and scope of work. Location of walk is the site
address and access point off Quebec Street.
Required personnel for attendance are to include at a minimum the proposed site supervisor or
project manager.
3.10. Questions
Questions regarding this RFP should be submitted in writing via email to
jdenman@eroresources.com by 4:00 PM [DATE].
3.11. Submittal Due Date
Responses to this RFP are due by 4:00 PM on [DUE DATE]. Responses to this RFP must be as an e-
mail attachment to: Jack Denman at jdenman@eroresources.com. Each Respondent is
responsible for successful transmittal of the proposal. Hard copies will not be accepted.
Bid Document: Aylor Property Abatement, Demolition, and Removal Page | 9

4. Certification Form
Note: THIS PAGE MUST BE COMPLETED AND INCLUDED WITH THE SUBMITTAL CERTIFICATION
The undersigned hereby certifies, on behalf of the Respondent named in this Certification (the
"Respondent"), that:
* The Respondent fully understands the scope outlined in this RFP and presents the
capabilities to execute;
* Concurs with specifications and bid quantities listed herein and, unless specifically noted
within the submittal, does not materially object or dispute the bid quantities; Quantity
Acknowledgement. Acknowledgement that Respondent has had the opportunity to
independently verify bid quantities estimated in this RFP;
* Acknowledges that no escalation costs, fuel adjustments, or change orders requesting such
will be honored for the life of the contract;
* The information provided in this RFP submittal to ERO is accurate and complete, and I am
duly authorized to submit the same. I hereby certify that the Respondent has reviewed this
RFP in its entirety and accepts its terms and conditions.
I hereby certify the above:
______________________________________________
(Name of Respondent)
______________________________________________
(Signature of Authorized Representative
______________________________________________
(Printed Name of Authorized Representative)
______________________________________________
(Title)
______________________________________________
(Date)
Bid Document: Aylor Property Abatement, Demolition, and Removal Page | 10

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Weld County CBOC Active Contract Opportunity Notice ID 36C24W26R0049 Related Notice Department/Ind.

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 8/24/2026

Due Date Number Title Documents Contact 2026-09-15 Q26-06 Eagle's Nest Open Space (ENOS)

Larimer County

Bid Due: 9/15/2026

Description: PMAA, RMYA, C25YA1, Yampa SP Seasonal Housing and Campsites Department: DNR -

State Government of Colorado

Bid Due: 8/14/2026

General Information Document ID IFB1-PMAA-2027000004-1 Status Open Description PMAA, RMYA, C25YA1, Yampa SP

State Government of Colorado

Bid Due: 8/14/2026