2026 Asphalt Overlay Program
|
| Category: | Finance |
| Status: | Open |
|
| Bid Number: | Date Issued: 3-23-26 | Bid Opening Date: April 28, 2026 Bid Opening Time: 10:00 a.m . | ||||
|---|---|---|---|---|---|---|
| Commodity Classification: | Contact: | Contract Period: | ||||
| F.O.B Jacksonville, AR. | Phone: (501)- 982 - 4502 Fax: (501)- 985 - 9768 | Bidder's Guaranteed Delivery Date: | ||||
| Item No. | Description: | Quantity: | Unit Cost: | Total Pricing: | ||
| 1. | 2026 Asphalt Overlay Program BIDDERS ARE REQUIRED TO CALL & REGISTER AS A RECOGNIZED BIDDER TO ENSURE RECEIPT OF ANY APPLICABLE ADDENDUMS | |||||
| Cash Discount: % |
| Name of Firm: | Arkansas Use Tax Number: | Phone Number: |
|---|---|---|
| Business Address: | City: | State: |
| Signature of authorized Person: | Title: | Date: |
City of Jacksonville
Finance Department
___________________________________________________
______________________________________________________________________________
# 1 Municipal Drive Office Phone: (501) 982-4502
P.O. Box 126 Fax Number: (501) 985-9768
Jacksonville, AR. 72076 E-Mail: lcollie@cityofjacksonville.net
Laura Collie
Finance Director
INVITATION TO BID
Bid Number: Date Issued:
3-23-26
Bid Opening Date: April 28, 2026
Bid Opening Time: 10:00 a.m .
Commodity Classification: Contact: Contract Period:
F.O.B Phone: (501)- 982 - 4502 Bidder's Guaranteed
Jacksonville, AR. Fax: (501)- 985 - 9768 Delivery Date:
Item
No. Description: Quantity: Unit Cost: Total Pricing:
1. 2026 Asphalt Overlay Program
BIDDERS ARE REQUIRED TO CALL & REGISTER
AS A RECOGNIZED BIDDER TO ENSURE RECEIPT
OF ANY APPLICABLE ADDENDUMS
Cash Discount: %
EXECUTION OF BID:
UPON SIGNING THIS BID, THE BIDDER CERTIFIES THAT THEY HAVE READ AND AGREE TO THE
REQUIREMENTS SET FORTH IN THIS BID PROPOSAL INCLUDING SPECIFICATIONS, CONDITIONS
AND PERTINENT INFORMATION REGARDING THE ARTICLES BEING BID ON, AND AGREE TO
FURNISH THESE ARTICLES BEING BID ON, AND AGREE TO FURNISH THESE ARTICLES AT THE
PRICE STATED. {UNSIGNED BIDS AND TERMS & CONDITIONS WILL BE REJECTED.}
Name of Firm: Arkansas Use Tax Number: Phone Number:
Business Address: City: State:
Signature of authorized Person: Title: Date:
BONDING AND INSURANCE REQUIRMENTS
1. A bid guarantee from each bidder equivalent to five percent of the bid price. The "bid
guarantee" shall consist of a firm commitment such as bid bond, certified check, or other
negotiable instrument accompanying a bid as assurance that the bidder will, upon acceptance
of his bid, execute such contractual documents as may be required within the time specified.
2. A performance bond on the part of the contractor for 100 percent of the contract price. A
"performance bond" is one executed in connection with a contract to secure fulfillment of all
of the contractor's obligations under such contract.
3. A payment bond on the part of the contractor for 100 percent of the contract price. A "payment
bond" is one executed in connection with a contract to assure payment as required by law of
all persons supplying labor and material in execution of the work provided for in the contract.
INSURANCE
The Contractor shall purchase and maintain such insurance as will protect it from claims set forth
below which may arise out of or result from the CONTRACTOR'S execution of the WORK,
whether such execution be done by the CONTRACTOR and SUBCONTRACTOR, or by anyone
directly or indirectly employed by any of them, or by anyone for whose acts any of them may be
liable:
Claims under worker's compensation, disability benefit and other similar employee benefit
acts;
Claims for damages because of bodily injury, occupational sickness or disease, or death of
employees;
Claims for damages because of bodily injury, sickness or disease, or death of any person
other than employees;
Claims for damages insured by usual personal injury liability coverage which are sustained
(1) by any person as a result of an offense directly or indirectly related to the employment of such
person by the CONTRACTOR, or (2) by any other person; and
Claims for damages because of injury to or destruction of tangible property, including loss
of use resulting therefrom.
Certificates of insurance acceptable to the Owner shall be filed with the Owner prior to
commencement of the Work. These certificates shall contain a provision that coverage's afforded
under the policies will not be canceled unless at least fifteen (15) days prior WRITTEN NOTICE
has been given to the OWNER
The CONTRACTOR shall procure and maintain, at the CONTRACTOR'S own expense,
during the CONTRACT TIME, liability insurance as hereinafter specified:
CONTRACTOR'S General Public Liability and Property Damage Insurance including
vehicle coverage issued to the CONTRACTOR and protecting the CONTRACTOR from
all claims for personal injury, including death, and all claims for destruction of or damage
to property, arising out of or in connection with any operations under the CONTRACT
DOCUMENTS, whether such operation be by the CONTRACTOR or by any
SUBCONTRACTOR employed by the CONTRACTOR or anyone directly or indirectly
employed by the CONTRACTOR or by a SUBCONTRACTOR employed by the
CONTRACTOR. Insurance shall be written with a limit of liability of not less than
$1,000,000.00 aggregate for any such damage sustained by two or more persons in any one
accident. Insurance shall be written with a limit of liability of not less than $500,000.00 for
all property damage sustained by any one person in any one accident; and a limit of liability
of not less than $200,000.00 aggregate for any such damage sustained by two or more
persons in any one accident.
The CONTRACTOR shall procure and maintain, at the CONTRACTOR'S own expense,
during the CONTRACT TIME in accordance with the provisions of the laws of the State
in which the work if performed, Worker's Compensation Insurance, including occupational
disease provision, for all of the CONTRACTOR'S employees at the site of the project and
in case any WORK is sublet, the CONTRACTOR shall require such
SUBCONTRACTOR similarly to provide Worker's Compensation Insurance, including
occupational disease provisions for all the latter's employees unless such employees are
covered by the protection afforded by the CONTRACTOR. In any case of the employees
engaged in hazardous work under this contract at the site of the PROJECT is not protected
under Worker's Compensation Statute, the CONTRACTOR shall provide, and shall cause
each SUBCONTRACTOR to provide, adequate and suitable insurance for the protection
of its employees not otherwise protected.
The CONTRACTOR shall secure, If applicable "All Risk" type Builder's Risk Insurance
for WORK to be performed. Unless specifically authorized by the OWNER, the amount
of such insurance shall not be less than the CONTRACT PRICE totaled in the BID. The
policy shall not be less than the losses due to fire, explosion, hail, lighting, vandalism,
malicious mischief, wind, collapse, riot, aircraft, and smoke during the CONTRACT
TIME, and until the WORK is accepted by the OWNER. The policy shall name as the
insured the CONTRACTOR, and the OWNER.
5. METHOD OF BIDDING
The Owner invites the following bid (s):
2026 Asphalt Overlay Program
INFORMATION FOR BIDDERS
1. The City of Jacksonville (herein called "Owner") invites bids on the form attached hereto,
all blanks of which must be appropriately filled in. The Owner will receive bids at the
Office of the Finance Director, #1 Municipal Drive, Jacksonville, AR until 10:00 am
Central Standard Time on April 28, 2026 and then at said office, publicly opened and
read aloud. The envelopes containing bids must be sealed addressed to the City of
Jacksonville, Finance Director, #1 Municipal Drive, Jacksonville, AR and designated as
bid for 2026 Asphalt Overlay Program. The owner may consider informal any bid not
prepared and submitted in accordance with the provisions hereof and may waive any
informalities or reject any and all bids. Any bid may be withdrawn prior to the above
scheduled time for the opening of bids or authorized postponement thereof. Any bid
received after the time and date specified shall not be considered. No Bidder may withdraw
a bid within thirty (30) days after the actual date of the opening thereof.
2. PREPARATION OF BID
All blank spaces for bid prices must be filled in, in ink or typewritten, in both words and
figures. Each bid must be submitted in a sealed envelope bearing on the outside the name
of Bidder, his address, and the name of the project for which the bid is submitted. If
forwarded by mail, the sealed envelope containing the bid must be enclosed in another
envelope addressed as specified in the bid form.
3. SUBCONTRACTS
The Bidder is specifically advised that any person, firm, or other party to whom it is
proposed to award a subcontract under this contract must have certified eligibility in written
contracts containing Federal Labor Standards Provision. Although the Bidder is not
required to attach such certifications by proposed subcontractors to his bid, the Bidder is
advised of this requirement so that appropriate action can be taken to prevent subsequent
delay in subcontract awards.
4. TELEGRAPHIC MODIFICATION
Any Bidder may modify his bid by telegraphic communication at any time prior to the
scheduled closing time for receipt of bids, provided such telegraphic communication is
received by the Owner prior to the closing time, and provided further, the Owner is satisfied
that a written confirmation of the telegraphic modification over the signature of the Bidder
was mailed prior to the closing time. The telegraphic communication should not reveal the
bid price but should provide the addition or subtraction or other modification so that the
Owner will not know the final prices or term until the sealed bid is opened. If written
confirmation is not received within two (2) days from closing time, no consideration will
be given to the telegraphic modification.
6. QUALIFICATION OF BIDDER
The Owner may make such investigations as he deems necessary to determine the ability
of the Bidder to perform the work, and the Bidder shall furnish to the Owner all such
information and data for this purpose as the Owner may request. The Owner reserves the
right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to
satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the
contract and to complete the work contemplated therein. Conditional bids will not be
accepted.
7. BID SECURITY
Each bid must be accompanied by cash, certified check of the Bidder or a Bid Bond
prepared on the form of Bid Bond attached hereto, duly executed by the Bidder as principle
and having as surety thereon a surety company approved by the Owner, in the amount of
five (5) percent of the bid. Such cash, checks or Bid Bonds will be returned to all except
the three lowest Bidders within three (3) days after the opening of bids, and the remaining
cash, checks, Bid Bonds will be returned promptly after the Owner and the accepted Bidder
have executed the contract, or, if no award has been made within 30 days after the date of
the opening of the bids, upon demand of the Bidder at any time thereafter, so long as he
has not been notified of the acceptance of his bid.
8. LIQUIDATED DAMAGES FOR FAILURE TO ENTER INTO CONTRACT
The successful Bidder, upon his failure or refusal to execute and deliver the contract and
bonds required within then (10) days after he has received notice of the acceptance of his
bid, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security
deposited with his bid.
9. TIME OF COMPLETION AND LIQUIDATION DAMAGES
Bidder must agree to commence work on or before a date to be specified in a written
"Notice to Proceed" of the Owner and to fully complete the project within 30 consecutive
calendar days thereafter. Bidder must agree also to pay as liquidated damages, the sum of
$250.00 for each consecutive calendar day thereafter.
10. CONDITIONS OF WORK
Each Bidder must inform himself fully of the conditions relating to the construction of the
project and the employment of labor thereon. Failure to do so will not relieve a successful
Bidder of his obligations to furnish all material and labor necessary to carry out the
provisions of his contract. In so far as possible, the Contractor in carrying out his work
must employ such methods or means as will not cause any interruption of or interference
with the work of any other Contractor.
11. ADDENDA AND INTERPRETATIONS
No interpretations of the meaning of the Plans, Specifications or other Pre-bid Documents
will be made to any Bidder orally. Every request for such interpretation should be in
writing addressed to Adam Whitlow, Director of Engineering & Public Works, #1
Municipal Drive, Jacksonville, AR, 72076 and to be given consideration must be received
at least five (5) days prior to the date fixed for the opening of bids. Any and all such
interpretations and any supplemental instructions will be in the form of written addenda to
the specifications which, if issued, will be mailed certified mail with return receipt
requested to all prospective Bidders (at the respective address furnished for such purposes)
not later than three (3) days prior to the date fixed for the opening of bids. Failure of any
Bidder to have received any such addendum or interpretation shall not relieve such Bidder
from any obligation under his bid as submitted. All addenda so issued shall become part
of the Contract Documents.
12. SECURITY FOR FAITHFUL PERFORMANCE
Simultaneously with his delivery of the executed contract, the Contractor shall furnish a
Performance and Payment Bond as security for faithful performance of this contract and
for the payment of all persons performing labor on the project under this contract and
furnishing materials in connection with this contract. The surety on such bond or bonds
shall be a dully-authorized company satisfactory to the Owner, Performance and Payment
Bonds will be in the amount of 100% of the total bid.
13. POWER OF ATTORNEY
Attorneys-in-fact who sign bid bonds or contract bonds must file with each bond a certified
and effectively dated copy of their power of attorney.
14. LAWS AND REGULATIONS
The Bidder's attention is directed to the fact that all applicable State Laws, municipal
ordinances, and the rules and regulations of all authorities having jurisdiction over
construction of the project shall apply to the contract throughout, and they will be deemed
to be included in the contract the same as though herein written out in full.
15. METHOD OF AWARD-LOWEST QUALIFIED BIDDER
If at the time contract is to be awarded, the lowest base bid submitted by a responsible
Bidder does not exceed the amount of funds then estimated by the Owner as available to
finance the contract will be awarded on the base bid only. If such bid exceeds such amount,
the Owner may reject all bids or may award the contract on the base bid combined with
such deductible alternate applied in numerical order in which they are listed in the Form of
Bid, as produces a net amount which is within the available funds.
16. OBLIGATION OF BIDDERS
At the time of the opening of bids, each Bidder will be presumed to have inspected the site
and to have read and to be thoroughly familiar with the plans and contract documents
(including all addenda). The failure or omission of any Bidder to examine any instrument
or document shall in no way relieve any Bidder from any obligation in respect of his bid.
17. SAFETY STANDARDS AND ACCIDENT PREVENTION
With respect to all work performed under this contract, the Contractor shall:
1. Comply with the safety standards provisions of applicable laws, building and
construction codes and the "Manual of Accident Prevention in Construction: published
by the Associated General Contractors of America. The requirements of the
Occupational Safety and Health Act of 1970 (Public Law 91-596), and the
requirements of Title 29 of the code of Federal Regulations, Section 1518 as published
in the "Federal Register: Volume 36, No. 75, Saturday, April 17, 1971.
2. Exercise every precaution at all times for the prevention of accidents and the protection
of persons (including employees) and property.
3. Maintain at his office or other well known place at the job site, all articles necessary
for giving first aid to the injured, and shall make standing arrangements for the
immediate removal to a hospital or a doctor's care of persons (including employees),
who may be injured on the job site. In no case shall employees be permitted to work
at a job site before the employer has made a standing arrangement for removal of
injured persons to a hospital or a doctor's care.
18. PAYMENT SCHEDULE
All invoices received by 12:00 Noon p.m. Central Standard Time on a MONDAY will be
paid the following week, no later than Friday. Any invoices received after 5:00 p.m.
Central Standard Time; on a TUESDAY will be paid two weeks later.
19. ARKANSAS CONTRACTOR'S LICENSE
The attention of prospective bidders is directed to Act 150 of the 1965 Acts of Arkansas,
being an "Act Regulating the Practice of Contracting in the State of Arkansas." When
the project presented for bid is estimated to cost $20,000.00 or more, the prospective
bidder must show evidence of license with the "Contractor's Licensing Board" for the
State of Arkansas before a contract is awarded
PROPOSAL
Place: ______________________
Date: ______________________
Proposal of_____________________________ (hereinafter called "Bidder") a
Corporation, organized and existing under the laws of the State of, __________________
Partnership, or an individual doing business as ________________________________________
To the City of Jacksonville (hereinafter called the "Owner")
Gentleman:
The Bidder, in compliance with your invitation for bids for the construction of:
2026 ASPHALT OVERLAY PROGRAM
Having examined the plans and specifications with related documentation and the site of the
proposed work, and being familiar with all of the conditions surrounding the construction of the
proposed project including the availability of materials and labor, hereby proposes to furnish all
labor, materials, and supplies, and to construct the project in accordance with the contract
documents, within the time set forth therein, and at the prices stated below. These prices are to
cover all expenses incurred in performing the work required under the contract documents, of which
this proposal is a part.
Bidder hereby agrees to commence work under this contract on or before a date to be specified on
written "Notice to Proceed" of the Owner and to fully complete the project within 120 consecutive
calendar days thereafter as stipulated in the specifications. Bidder further agrees to pay us liquidated
damages, the sum of $250.00 for each consecutive day thereafter.
Bidder acknowledges receipt of the following addendum:
___________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
BIDDERS ARE REQUIRED TO CALL & REGISTER AS A RECOGNIZED BIDDER TO ENSURE RECEIPT
OF ANY APPLICABLE ADDENDUMS
Notes:
The above shall include all labor, materials, overhead, profit, insurance, etc. To cover the finished
work or the several kinds called for.
The Bidder understands that the Owner reserves the right to reject any or all bids (or part of any
bid) at any time and to waive any informalities in the bidding.
The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 calendar
days after the scheduled closing time for receiving bids.
Upon receipt of written notice of the acceptance of this bid, bidder will execute the formal contract
attached immediately and deliver a Performance and Payment Bond as required. The Bid Security
attached in the sum 5% of the total price bid is to become property of the Owner in the event the
contract and bond are not executed within the time above set forth, as liquidated damages for the
delay and additional expenses to the Owner caused thereby.
A maintenance bond in the amount of 50% of the total contract price will be required on completion
of the project and will be in force for a period of one (1) year.
Respectfully submitted:
(Seal if bid is by a Corp.)
________________________________
Contractor
_______________________________
By
________________________________
Title
_______________________________
(Business Address)
______________________________
(City and Zip Code)
______________________________
(Phone and Fax Number)
CONTRACT
THIS AGREEMENT, made this ______ day of _______ __, 2025 by and between the
City of Jacksonville, herein called "Owner", acting herein through its Director of Engineering &
Public Works, and, ____________________________________________, a corporation, City of
________________, County of __________, State of Arkansas, hereinafter called "Contractor".
WITNESSTH: That for and in consideration of the payments and agreements hereinafter
mentioned to be made and performed by the OWNER, the CONTRACTOR hereby agrees with the
OWNER to commence and complete the construction described as follows:
2026 ASPHALT OVERLAY PROGRAM
hereinafter called project, for the sum of (_________________________________________) and
all extra work in connection therewith, at their own expense to furnish all materials, insurance,
machinery, equipment, tools, superintendents, labor, complete the said project in all maps, plats,
blue prints, and other drawings and printed or written explanatory matter thereof, the specifications
and contract document thereof as prepared by the Director of Engineering & Public Works, herein
entitled the OWNER.
The Contractor hereby agrees to commence work under this contract on or before a date to be
specified in a written "Notice to Proceed" of the Owner and to fully complete the project within
120 consecutive calendar days thereafter. The Contractor further agrees to pay, as liquidated
damages, the sum of $250.00 for each calendar day thereafter. Contractor agrees to deliver a
Performance and Payment Bond to Owner at a time of contract signing.
The Owner agrees to pay the Contractor in current funds for the performance of the contract, subject
to additions and deductions, and to make payments on account thereof.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Road Maintenance for the Ouachita National Forest Active Contract Opportunity Notice ID
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/10/2026
SECTION 00 11 16 - INVITATION FOR BIDS 1. Sealed bids for the
Arkansas Democrat-Gazette
Bid Due: 8/11/2026
SECTION 00100 - INVITATION FOR BIDS Notice is hereby given that the Housing
Arkansas Democrat-Gazette
Bid Due: 8/11/2026
Public Notice of RFQ for Engineering Services Date August 2, 2026 The Town
Arkansas Democrat-Gazette
Bid Due: 8/17/2026