Arrowhead Ln Water Main Replacement Project
| Agency: | State Government of Utah |
|---|---|
| State: | Utah |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 21, 2025 |
| Due Date: | May 14, 2025 |
| Solicitation No: | Bid No. 25-10 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: This project includes approximately 4,000 LF of new 8-inch ductile iron pipe. connection to existing 10-inch CIP in 900 E, 2 connections to the existing 6-inch ductile iron pipe, removal and salvaging of existing hydrants, new hydrants, reconnection of existing service laterals via copper flare connector, installation of a combination air valve and vault, with water service planned to stay active for construction, with a coordinated switch over. Includes incidental restoration of disturbed waterway, and landscaping, Includes asphalt removal, disposal and placement. Also includes 4 cast-in-place sewer manholes with concrete collars.
See Also
Project: DFCM Construction - Prequalified Roofing Contractors - Utah Tech University - Taylor
State Government of Utah
Due by 9/23/2026
Project: DFCM Construction - Prequalified Mechanical Stage II - Uintah Basin Technical College
State Government of Utah
Due by 10/06/2026
Project: DFCM Construction - Prequalified Roofing Contractors - Utah Tech University - Smith
State Government of Utah
Due by 9/22/2026
Project: Replace Flume/Auto Dump and JSL Canal Enclosure at Millcreek Ref. #: 5129246--
State Government of Utah
Due by 9/23/2026